# CITY OF CORONADO fee schedule

drillable.com › california-fee-schedules › jurisdictions › coronado-ca-us › fee-schedule.
As of the capture of 15 Sep 2026; the index built 19 Sep 2026, 03:43 UTC · [cites, never asserts](/standing).
Source: https://www.coronado.ca.us/DocumentCenter/View/2680/Public-Services-and-Engineering-User-Fee-Schedule- and https://www.coronado.ca.us/DocumentCenter/View/941/Fire-Fee-Schedule-FY-2023-to-2024-Fees-PDF?bidId= · full text, no licence recorded.
Search `/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule?q=…` · MCP https://mcp.drillable.com · [html](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule?format=html) · [markdown](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule?format=md) · [json](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule?format=json) · [discovery](/.well-known/drillable.json) · [guide](/llms.txt)

No in-force window is declared for the document.

## Records read from it (148)

142 of 284 figures in the text, amounts and percentages, have a record.

By drillable.com ([value-label/2](/standing#methods)); not yet scored by the harness.

### fire services fee schedule (60 records)

- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · 0 5 000 sq ft · fy 2023 24 · amount** = 796 USD · as [0 5 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/0-5-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=237&end=268) · [sha256:06d222181fc59a40…](/hashes/sha256:06d222181fc59a40c5a67ea32e0698e76c866be3e200a832dbc2a686c6557748)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · 0 5 000 sq ft · fy 2022 23 · amount** = 758 USD · as [0 5 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/0-5-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=237&end=268) · [sha256:ed8b04e76c2fe2d1…](/hashes/sha256:ed8b04e76c2fe2d1407761941ba084c4bf54adf7ecdadc75d2bb07450511365e)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · 5 001 25 000 sq ft · fy 2023 24 · amount** = 847 USD · as [5 001 25 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/5-001-25-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=269&end=305) · [sha256:41b4093a2c7109a3…](/hashes/sha256:41b4093a2c7109a396e86b332e82fa948f3315dfb4070986f6d46419e42f65d0)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · 5 001 25 000 sq ft · fy 2022 23 · amount** = 807 USD · as [5 001 25 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/5-001-25-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=269&end=305) · [sha256:d0a13e8aef51247c…](/hashes/sha256:d0a13e8aef51247c416fbb584864607a4acf192ed6e51ed1a6793eb87f5e013b)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · 25 001 100 000 sq ft · fy 2023 24 · amount** = 913 USD · as [25 001 100 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/25-001-100-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=306&end=344) · [sha256:392bb86cdbb5f13e…](/hashes/sha256:392bb86cdbb5f13e8a16f17e1f30d5a60af24cae0d0b8ba574519580bc5583e5)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · 25 001 100 000 sq ft · fy 2022 23 · amount** = 869 USD · as [25 001 100 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/25-001-100-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=306&end=344) · [sha256:8ac8dcd5d1a1fa32…](/hashes/sha256:8ac8dcd5d1a1fa325c3c2743c85e0926e2e03e15d6bc510a34b7f646856bb5ad)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · each additional 25 000 sq ft or portion thereof · fy 2022 23 · amount** = 238 USD · as [each additional 25 000 sq ft or portion thereof · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/each-additional-25-000-sq-ft-or-portion-thereof/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=345&end=410) · [sha256:c21b508e4dd7ca98…](/hashes/sha256:c21b508e4dd7ca9827e3fb33938557af7c340ad8f3b72093252fc912df1d3400)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · each additional 25 000 sq ft or portion thereof · fy 2023 24 · amount** = 250 USD · as [each additional 25 000 sq ft or portion thereof · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/each-additional-25-000-sq-ft-or-portion-thereof/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=345&end=410) · [sha256:e78311f31abdb2c5…](/hashes/sha256:e78311f31abdb2c5763d11420de2786fa14afc77fa3215ab149520a32c5a1dab)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · re inspection · fy 2023 24 · amount** = 420 USD · as [re inspection · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/re-inspection/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=411&end=438) · [sha256:7801f1698291fe33…](/hashes/sha256:7801f1698291fe33d8e23b4139d1503c3a978d5e158ef29d0324147d130fe26b)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · commercial inspection · re inspection · fy 2022 23 · amount** = 400 USD · as [re inspection · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/commercial-inspection/re-inspection/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=411&end=438) · [sha256:d45f050c7b6325c3…](/hashes/sha256:d45f050c7b6325c3a5c872dad1b66e6fb8d0b59f8d6d13a4865dac2c6160e5f1)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · 0 5 000 sq ft · fy 2023 24 · amount** = 796 USD · as [0 5 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/0-5-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=474&end=505) · [sha256:1aef1ea2b95a2c67…](/hashes/sha256:1aef1ea2b95a2c676d125849bb89d15495f262ce832dd325e9d924d58aa73428)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · 0 5 000 sq ft · fy 2022 23 · amount** = 758 USD · as [0 5 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/0-5-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=474&end=505) · [sha256:709b3365cd3c3894…](/hashes/sha256:709b3365cd3c38946df600ee3a6956d14210f584d27ec3fac10a4ab62d0500eb)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · 5 001 25 000 sq ft · fy 2022 23 · amount** = 869 USD · as [5 001 25 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/5-001-25-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=506&end=542) · [sha256:5bcd9c22bd8b6a0e…](/hashes/sha256:5bcd9c22bd8b6a0e329f8a9771f4da12807b20a77e77d459302706dfdfd43dc0)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · 5 001 25 000 sq ft · fy 2023 24 · amount** = 913 USD · as [5 001 25 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/5-001-25-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=506&end=542) · [sha256:95444916cea1ee64…](/hashes/sha256:95444916cea1ee640cf2dc0c8d5e0cc5ad17bbe2de21a23e2c22503ee62b1f1a)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · 25 001 100 000 sq ft · fy 2022 23 · amount** = 969 USD · as [25 001 100 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/25-001-100-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=543&end=584) · [sha256:102dad3f2d8a584c…](/hashes/sha256:102dad3f2d8a584cb40edf6729d6c82b5adbaa4ee7ef49950e3062288d97e8ed)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · 25 001 100 000 sq ft · fy 2023 24 · amount** = 1018 USD · as [25 001 100 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/25-001-100-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=543&end=584) · [sha256:f13b09cd1a42a902…](/hashes/sha256:f13b09cd1a42a9029d85012127d8dcf214fad81d3610f6cfdd368ed005c53f7c)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · each additional 25 000 sq ft or portion thereof · fy 2022 23 · amount** = 201 USD · as [each additional 25 000 sq ft or portion thereof · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/each-additional-25-000-sq-ft-or-portion-thereof/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=585&end=651) · [sha256:455c350d1b38ad70…](/hashes/sha256:455c350d1b38ad704d0f1b47887f9c6453ce23280f7b69bbf37a52f413d9740e)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · each additional 25 000 sq ft or portion thereof · fy 2023 24 · amount** = 211 USD · as [each additional 25 000 sq ft or portion thereof · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/each-additional-25-000-sq-ft-or-portion-thereof/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=585&end=651) · [sha256:90f5e1b10702cf57…](/hashes/sha256:90f5e1b10702cf576927b18ef63859cbe7ba3eebb0e9f493095a8ee72fc1d2b5)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · re inspection · fy 2022 23 · amount** = 448 USD · as [re inspection · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/re-inspection/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=652&end=680) · [sha256:7413fd95f1345ee2…](/hashes/sha256:7413fd95f1345ee25ec90d980f4aa28f16c789b2362ada12b85e94b27d867b2c)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · new construction fees all inspections excluding sprinkler · residential inspection · re inspection · fy 2023 24 · amount** = 471 USD · as [re inspection · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/new-construction-fees-all-inspections-excluding-sprinkler/residential-inspection/re-inspection/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=652&end=680) · [sha256:7e3e1930ddef4b53…](/hashes/sha256:7e3e1930ddef4b5355b1ed75606ca93a1c077885c07299f3d7ca1a0df1a388a6)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · 0 5 000 sq ft · fy 2022 23 · amount** = 732 USD · as [0 5 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/0-5-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=717&end=749) · [sha256:2a01d9f38e405826…](/hashes/sha256:2a01d9f38e40582680450be741be4288842e5e687ef1aa11e12838a72aaf4fa1)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · 0 5 000 sq ft · fy 2023 24 · amount** = 769 USD · as [0 5 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/0-5-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=717&end=749) · [sha256:59a719f37b920c26…](/hashes/sha256:59a719f37b920c266565b56048450f8d7c0f9168f08bec0fc091f85ba72f99b9)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · 5 001 25 000 sq ft · fy 2022 23 · amount** = 758 USD · as [5 001 25 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/5-001-25-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=750&end=787) · [sha256:6e71d63f6f847f45…](/hashes/sha256:6e71d63f6f847f45056e85318df37aeb396af513a3fc4c6f6be042bd342a1954)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · 5 001 25 000 sq ft · fy 2023 24 · amount** = 796 USD · as [5 001 25 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/5-001-25-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=750&end=787) · [sha256:870ed5baad68fb6c…](/hashes/sha256:870ed5baad68fb6c39df849e0b0c9452e1c567fea83f3398183060c18651f7d7)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · 25 001 100 000 sq ft · fy 2023 24 · amount** = 913 USD · as [25 001 100 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/25-001-100-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=788&end=827) · [sha256:6226991511b32830…](/hashes/sha256:6226991511b32830d24f3a4edf1c2de74b51594102c477d11597095d332bf536)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · 25 001 100 000 sq ft · fy 2022 23 · amount** = 869 USD · as [25 001 100 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/25-001-100-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=788&end=827) · [sha256:e4d7c949b18a1725…](/hashes/sha256:e4d7c949b18a1725c08a8117133512838c3a47805b3500d8310c7a88b3cf8427)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · each additional 25 000 sq ft or portion thereof · fy 2023 24 · amount** = 211 USD · as [each additional 25 000 sq ft or portion thereof · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/each-additional-25-000-sq-ft-or-portion-thereof/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=828&end=894) · [sha256:38c25803c958e114…](/hashes/sha256:38c25803c958e114b4d9955b1652d0f3219af1b361fa835bd7ac8bb7a0471d6c)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · each additional 25 000 sq ft or portion thereof · fy 2022 23 · amount** = 201 USD · as [each additional 25 000 sq ft or portion thereof · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/each-additional-25-000-sq-ft-or-portion-thereof/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=828&end=894) · [sha256:68c60a818a4c65e6…](/hashes/sha256:68c60a818a4c65e6e33ff66104edbc78fe7f416bdaf7fb7a380ea7e1753e364b)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · re inspection · fy 2022 23 · amount** = 387 USD · as [re inspection · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/re-inspection/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=895&end=923) · [sha256:3fc0d8b26e74e29c…](/hashes/sha256:3fc0d8b26e74e29c3e9af8e408d4654a98e0648c13d959eb8a0777626bcc405c)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 13 commercial · re inspection · fy 2023 24 · amount** = 406 USD · as [re inspection · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/13-commercial/re-inspection/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=895&end=923) · [sha256:af6c2192e04e4210…](/hashes/sha256:af6c2192e04e4210e79342a993a927c16bc738e5016c7d435268abaaa8cdf086)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 19 single family · 0 5 000 sq ft · fy 2023 24 · amount** = 627 USD · as [0 5 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/19-single-family/0-5-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=942&end=974) · [sha256:4b6674b20d888cff…](/hashes/sha256:4b6674b20d888cff41e1d5f3cb8aa4dde368823f4e180c61f78b1820d9fcd2f1)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 19 single family · 0 5 000 sq ft · fy 2022 23 · amount** = 597 USD · as [0 5 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/19-single-family/0-5-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=942&end=974) · [sha256:cd94dd466d5501d4…](/hashes/sha256:cd94dd466d5501d4b6fc80774981e445884b94b99486208c998fa2578d0b351d)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 19 single family · greater than 5 000 sq ft · fy 2022 23 · amount** = 621 USD · as [greater than 5 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/19-single-family/greater-than-5-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=975&end=1016) · [sha256:2a8a4479c7aa1a2f…](/hashes/sha256:2a8a4479c7aa1a2f261a2a45f00e340c2abe576c9501d1b323707b40b4ee583f)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 19 single family · greater than 5 000 sq ft · fy 2023 24 · amount** = 652 USD · as [greater than 5 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/19-single-family/greater-than-5-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=975&end=1016) · [sha256:d958f7881fad7f4c…](/hashes/sha256:d958f7881fad7f4c74c6b1db557c24f5a7a56a34ec0c4c5f948c454536b63978)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 19 single family · re inspection · fy 2022 23 · amount** = 423 USD · as [re inspection · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/19-single-family/re-inspection/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1017&end=1045) · [sha256:1a336187887260c2…](/hashes/sha256:1a336187887260c2cd653814fb8831382da38e004207023b6e6261d32cefc1f5)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 19 single family · re inspection · fy 2023 24 · amount** = 444 USD · as [re inspection · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/19-single-family/re-inspection/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1017&end=1045) · [sha256:6d465c2d5d7172d6…](/hashes/sha256:6d465c2d5d7172d6b7c535519bd7ec026f241ff53af9a49015495930852bce99)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · 0 5 000 sq ft · fy 2023 24 · amount** = 796 USD · as [0 5 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/0-5-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1063&end=1095) · [sha256:06640d96332fd56a…](/hashes/sha256:06640d96332fd56a3843c7552859e60e62748ce5ff01c6066b776e50b31dc652)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · 0 5 000 sq ft · fy 2022 23 · amount** = 758 USD · as [0 5 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/0-5-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1063&end=1095) · [sha256:2c951ea73d4e7da7…](/hashes/sha256:2c951ea73d4e7da79e4cc9fb7fec3ee47c7f9208a2cc161085dac4d307f33fa7)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · 5 001 25 000 sq ft · fy 2022 23 · amount** = 795 USD · as [5 001 25 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/5-001-25-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1096&end=1133) · [sha256:1017d57f37cdeea0…](/hashes/sha256:1017d57f37cdeea061b3a71a74cafbf00aa0bd1bb8f5efaf36ff22321b7a6cbe)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · 5 001 25 000 sq ft · fy 2023 24 · amount** = 835 USD · as [5 001 25 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/5-001-25-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1096&end=1133) · [sha256:d48e98caeaec493b…](/hashes/sha256:d48e98caeaec493b266556b1f6355c2b89334e3d0db4588a0909602df4eb4bd3)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · 25 001 100 000 sq ft · fy 2022 23 · amount** = 895 USD · as [25 001 100 000 sq ft · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/25-001-100-000-sq-ft/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1134&end=1173) · [sha256:420f399ce4d10401…](/hashes/sha256:420f399ce4d104017916d7f66732d2e5ed5ca7f3fd4f667809c39e5dd63e50b3)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · 25 001 100 000 sq ft · fy 2023 24 · amount** = 940 USD · as [25 001 100 000 sq ft · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/25-001-100-000-sq-ft/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1134&end=1173) · [sha256:7683c922bcdfbbd6…](/hashes/sha256:7683c922bcdfbbd6bae1f102d3256cf4975a9e33cd27296a550a9f413540cfca)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · each additional 25 000 sq ft or portion thereof · fy 2023 24 · amount** = 211 USD · as [each additional 25 000 sq ft or portion thereof · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/each-additional-25-000-sq-ft-or-portion-thereof/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1174&end=1240) · [sha256:6d29ee04577923d8…](/hashes/sha256:6d29ee04577923d84cce59fa51ec83b42b30864534903af7a0c241e756215111)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · each additional 25 000 sq ft or portion thereof · fy 2022 23 · amount** = 201 USD · as [each additional 25 000 sq ft or portion thereof · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/each-additional-25-000-sq-ft-or-portion-thereof/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1174&end=1240) · [sha256:e882b241b8334b49…](/hashes/sha256:e882b241b8334b49abe65885607c4be1e22034e8a8ea4bca0d2104e33fc23ca6)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · re inspection · fy 2022 23 · amount** = 387 USD · as [re inspection · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/re-inspection/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1241&end=1269) · [sha256:113e4b6ca002b225…](/hashes/sha256:113e4b6ca002b225d93491dfab855ea5f3e95e9b50d95d83155f06b69aa8cffc)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 23 multi family · re inspection · fy 2023 24 · amount** = 406 USD · as [re inspection · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/23-multi-family/re-inspection/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1241&end=1269) · [sha256:94e226ec48d69d7a…](/hashes/sha256:94e226ec48d69d7aa046d1fd79e8383783281d83fb9056b0d71040f55fbb639c)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 5 year certification non compliance correction fee · fy 2022 23 · amount** = 659 USD · as [5 year certification non compliance correction fee · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/5-year-certification-non-compliance-correction-fee/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1270&end=1335) · [sha256:dc735f4782376b04…](/hashes/sha256:dc735f4782376b042257d804108c9dfa2eb730e6cbf6b1b10325515af8176ac2)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · sprinkler inspection · 5 year certification non compliance correction fee · fy 2023 24 · amount** = 692 USD · as [5 year certification non compliance correction fee · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/sprinkler-inspection/5-year-certification-non-compliance-correction-fee/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1270&end=1335) · [sha256:f4e87dd2492e8c50…](/hashes/sha256:f4e87dd2492e8c50639b2330781548d7f9da4a994138be53158c36966c983904)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · chemical fire extinguishing systems · fy 2022 23 · amount** = 832 USD · as [chemical fire extinguishing systems · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/chemical-fire-extinguishing-systems/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1578&end=1628) · [sha256:67aeba1866abb7c5…](/hashes/sha256:67aeba1866abb7c5551794addb0c818cd8584bb9c012d6c8f742c8590257fa55)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · chemical fire extinguishing systems · fy 2023 24 · amount** = 874 USD · as [chemical fire extinguishing systems · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/chemical-fire-extinguishing-systems/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1578&end=1628) · [sha256:d9cbdc8a2803e44e…](/hashes/sha256:d9cbdc8a2803e44e922315dd51e5238e3f7dd7cad96a3adc18144f0977751a64)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · fire alarm company permits monitoring companies annual fee new and renewal · fy 2022 23 · amount** = 1055 USD · as [fire alarm company permits monitoring companies annual fee new and renewal · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/fire-alarm-company-permits-monitoring-companies-annual-fee-new-and-renewal/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1712&end=1727) · [sha256:09a1809425def31d…](/hashes/sha256:09a1809425def31d0bfa52545665dc74d70ca3de373a3ce1a96e0968c44ad5be)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · fire alarm company permits monitoring companies annual fee new and renewal · fy 2023 24 · amount** = 1108 USD · as [fire alarm company permits monitoring companies annual fee new and renewal · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/fire-alarm-company-permits-monitoring-companies-annual-fee-new-and-renewal/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1712&end=1727) · [sha256:33262a553db5c487…](/hashes/sha256:33262a553db5c4876625f94272a7b959a4b4bbe3053a2766578831f6a84960ac)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · fire alarm plan check modifications · fy 2023 24 · amount** = 1042 USD · as [fire alarm plan check modifications · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/fire-alarm-plan-check-modifications/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1728&end=1780) · [sha256:e91dcf20b632e1e5…](/hashes/sha256:e91dcf20b632e1e547c608e40b01b2a0184437ed5715e8dcc16290877ba559b7)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · fire alarm plan check modifications · fy 2022 23 · amount** = 993 USD · as [fire alarm plan check modifications · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/fire-alarm-plan-check-modifications/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1728&end=1780) · [sha256:eca88508c25d3b99…](/hashes/sha256:eca88508c25d3b99e7fd818fdacf76847a65d12b2a316ff3c01437b29b21af5f)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · wet chemical kitchen hood system installation upgrade each · fy 2023 24 · amount** = 1120 USD · as [wet chemical kitchen hood system installation upgrade each · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/wet-chemical-kitchen-hood-system-installation-upgrade-each/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1847&end=1862) · [sha256:edc6dab5ecec5e62…](/hashes/sha256:edc6dab5ecec5e6265608405bd1afd9d9d6ab1739338d260e01433f831f57c06)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · wet chemical kitchen hood system installation upgrade each · fy 2022 23 · amount** = 1067 USD · as [wet chemical kitchen hood system installation upgrade each · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/wet-chemical-kitchen-hood-system-installation-upgrade-each/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1847&end=1862) · [sha256:fb0de8638df6cc63…](/hashes/sha256:fb0de8638df6cc637c6d00597e0faf4b8b94d83e547becd112c2284dff620f7c)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · underground tank removal or installation per tank · fy 2022 23 · amount** = 795 USD · as [underground tank removal or installation per tank · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/underground-tank-removal-or-installation-per-tank/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1863&end=1929) · [sha256:c809dcf5d9cf8155…](/hashes/sha256:c809dcf5d9cf81556018168e0852b441e31a3c88551824d01dea003487c1bb20)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · underground tank removal or installation per tank · fy 2023 24 · amount** = 835 USD · as [underground tank removal or installation per tank · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/underground-tank-removal-or-installation-per-tank/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1863&end=1929) · [sha256:ffb51424898df8bc…](/hashes/sha256:ffb51424898df8bc0abdfe0ec941c63eabbebe33e483bb799511d6c2bb9cb1a1)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · california fire code systems and features all other each · fy 2023 24 · amount** = 1120 USD · as [california fire code systems and features all other each · fy 2023 24](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/california-fire-code-systems-and-features-all-other-each/fy-2023-24) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1930&end=2009) · [sha256:34be9a5e305813c6…](/hashes/sha256:34be9a5e305813c6366a5e9f5e53245f7173a226f2deb35b74811e70f0c8d0c0)
- **current adjusted · fy 2022 23 fy 2023 24 · fee fee title effective 7 1 22 effective 7 1 23 · other fire service and inspection fees · california fire code systems and features all other each · fy 2022 23 · amount** = 1067 USD · as [california fire code systems and features all other each · fy 2022 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-services-fee-schedule/current-adjusted/fy-2022-23-fy-2023-24/fee-fee-title-effective-7-1-22-effective-7-1-23/other-fire-service-and-inspection-fees/california-fire-code-systems-and-features-all-other-each/fy-2022-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=1930&end=2009) · [sha256:4b880f808dcae39d…](/hashes/sha256:4b880f808dcae39de7c182967ec5bd22e9a2cfa1cfbd69f6c83aa1c946257675)

### engineering project development fee schedule (43 records)

- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · up to 2 000 · threshold** = 2000 USD · as [fee fee title effective 7 1 26 · up to 2 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/up-to-2-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=265&end=286) · [sha256:49e599ca3dce7208…](/hashes/sha256:49e599ca3dce720832db8bd90b23285b6158199014a833c864668709b4686909)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 2 001 10 000 · threshold** = 2001 USD · as [fee fee title effective 7 1 26 · 2 001 10 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/2-001-10-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=287&end=312) · [sha256:7c2121646413beea…](/hashes/sha256:7c2121646413beeaececfd98b793d700a52fc1bcd38c8fb9d624414826515ce5)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 2 001 10 000 · threshold** = 10000 USD · as [fee fee title effective 7 1 26 · 2 001 10 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/2-001-10-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=287&end=312) · [sha256:bbe892ebcdbc6a2f…](/hashes/sha256:bbe892ebcdbc6a2f515c2c34adef1b11063b6c365adbb8d72c9ffea51ae4d71d)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 10 001 to 50 000 · threshold** = 10001 USD · as [fee fee title effective 7 1 26 · 10 001 to 50 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/10-001-to-50-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=313&end=340) · [sha256:a38081d37d268334…](/hashes/sha256:a38081d37d2683349a04e831a16e947f392f595ee69804280197a98d12414eec)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 10 001 to 50 000 · threshold** = 50000 USD · as [fee fee title effective 7 1 26 · 10 001 to 50 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/10-001-to-50-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=313&end=340) · [sha256:de601c3f3fe1498e…](/hashes/sha256:de601c3f3fe1498e88d9a9893754dbca586e88135c0d32680a6bef5d3c10b501)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 50 001 to 100 000 valuation · threshold** = 100000 USD · as [fee fee title effective 7 1 26 · 50 001 to 100 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/50-001-to-100-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=341&end=379) · [sha256:903b31c24cc95e0e…](/hashes/sha256:903b31c24cc95e0e80a3fd760f0f7050285d932d9910078f23eb677dd81bd8ef)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 50 001 to 100 000 valuation · threshold** = 50001 USD · as [fee fee title effective 7 1 26 · 50 001 to 100 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/50-001-to-100-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=341&end=379) · [sha256:a321521455ce7512…](/hashes/sha256:a321521455ce7512b1864d96cbe5a247de519563160211997ac69234bd9da48a)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 100 001 to 250 000 valuation · threshold** = 100001 USD · as [fee fee title effective 7 1 26 · 100 001 to 250 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/100-001-to-250-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=380&end=419) · [sha256:38b811f93fb9a554…](/hashes/sha256:38b811f93fb9a554819624aea02be2066a9c5bde08028cdcf967c59987e1f61f)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 100 001 to 250 000 valuation · threshold** = 250000 USD · as [fee fee title effective 7 1 26 · 100 001 to 250 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/100-001-to-250-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=380&end=419) · [sha256:ee00c96eea3140f7…](/hashes/sha256:ee00c96eea3140f7a7479fbd27a4091174bcb9e4afe431c0b5c593e251fe2fa4)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · over 250 000 each additional 100 000 · basis** = 100000 USD · as [fee fee title effective 7 1 26 · over 250 000 each additional 100 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/over-250-000-each-additional-100-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=420&end=469) · [sha256:395f181043a25c4f…](/hashes/sha256:395f181043a25c4f12fc012189872d49e73d18b6c4b01970a799641b49eea863)
- **improvements in the right of way · plan check based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · over 250 000 each additional 100 000 · threshold** = 250000 USD · as [fee fee title effective 7 1 26 · over 250 000 each additional 100 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/plan-check-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/over-250-000-each-additional-100-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=420&end=469) · [sha256:56439a180a1069e3…](/hashes/sha256:56439a180a1069e3ffde9df1262f6b34c70661cb22994e19f1cfc85205ec4e65)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · up to 2 000 · threshold** = 2000 USD · as [fee fee title effective 7 1 26 · up to 2 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/up-to-2-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=557&end=578) · [sha256:d27a19dba8ec6154…](/hashes/sha256:d27a19dba8ec61542e6b295216d49d3b4a84100f20d98ffe6ba24080504dfca5)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 2 001 10 000 · threshold** = 2001 USD · as [fee fee title effective 7 1 26 · 2 001 10 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/2-001-10-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=579&end=604) · [sha256:0032c9e6badfd187…](/hashes/sha256:0032c9e6badfd187231aba92f96d7449d38cdb8a2dad173cf6ac5151a431afa3)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 2 001 10 000 · threshold** = 10000 USD · as [fee fee title effective 7 1 26 · 2 001 10 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/2-001-10-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=579&end=604) · [sha256:6d117b46f05ce494…](/hashes/sha256:6d117b46f05ce494e77eed9e522c99c1e8faa119f2bb63cfe75ed1af2043a362)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 10 001 to 50 000 · threshold** = 10001 USD · as [fee fee title effective 7 1 26 · 10 001 to 50 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/10-001-to-50-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=605&end=633) · [sha256:04b66180335dc9a0…](/hashes/sha256:04b66180335dc9a03f97d3288b2b255e9221fa16a009d69954994134aafe03f2)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 10 001 to 50 000 · threshold** = 50000 USD · as [fee fee title effective 7 1 26 · 10 001 to 50 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/10-001-to-50-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=605&end=633) · [sha256:dbb809b38ebb48a4…](/hashes/sha256:dbb809b38ebb48a431f352a7212a6c2b45cef3f7fe01265bf8e36ee6b4c2dba6)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 50 001 to 100 000 valuation · threshold** = 50001 USD · as [fee fee title effective 7 1 26 · 50 001 to 100 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/50-001-to-100-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=634&end=673) · [sha256:5324aebc3934ef6d…](/hashes/sha256:5324aebc3934ef6d3afd4a727c9445c8a0d5c421c9a487ad84d4f867986e13d0)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 50 001 to 100 000 valuation · threshold** = 100000 USD · as [fee fee title effective 7 1 26 · 50 001 to 100 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/50-001-to-100-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=634&end=673) · [sha256:e7bbf528ba3d63d0…](/hashes/sha256:e7bbf528ba3d63d0fff5c9fefa9495663f2e4e0845091bea38e686055ef544ea)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 100 001 to 250 000 valuation · threshold** = 250000 USD · as [fee fee title effective 7 1 26 · 100 001 to 250 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/100-001-to-250-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=674&end=714) · [sha256:9972f59bceab74ae…](/hashes/sha256:9972f59bceab74ae7ef8371450e4375957a144fc483d37fe84be411ca4efa6be)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · 100 001 to 250 000 valuation · threshold** = 100001 USD · as [fee fee title effective 7 1 26 · 100 001 to 250 000 valuation](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/100-001-to-250-000-valuation) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=674&end=714) · [sha256:b73c4ac8adae86df…](/hashes/sha256:b73c4ac8adae86df367ada8acd1bc202ce6591425dc0b185b62fdc206b74e7e3)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · over 250 000 each additional 100 000 · basis** = 100000 USD · as [fee fee title effective 7 1 26 · over 250 000 each additional 100 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/over-250-000-each-additional-100-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=715&end=765) · [sha256:09ad3d2be3b4a19b…](/hashes/sha256:09ad3d2be3b4a19b12c5af30c5cec4bcf8cd9ecd619d339d140658aaf7df79ec)
- **improvements in the right of way · inspection based on engineer s estimate of construction cost · fee fee title effective 7 1 26 · over 250 000 each additional 100 000 · threshold** = 250000 USD · as [fee fee title effective 7 1 26 · over 250 000 each additional 100 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/improvements-in-the-right-of-way/inspection-based-on-engineer-s-estimate-of-construction-cost/fee-fee-title-effective-7-1-26/over-250-000-each-additional-100-000) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=715&end=765) · [sha256:ba8e1b51bbbad5fc…](/hashes/sha256:ba8e1b51bbbad5fc217e2993fd261cb86cf6f51d6d71ea3e8f762146eda14c73)
- **encroachment permits · fee fee title effective 7 1 26 · residential hardscape · amount** = 400 USD · as [fee fee title effective 7 1 26 · residential hardscape](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/encroachment-permits/fee-fee-title-effective-7-1-26/residential-hardscape) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=818&end=849) · [sha256:6637cf8a2626a63f…](/hashes/sha256:6637cf8a2626a63f0de77a0c6ac7b34854038bae67e2ff0f6c690cb8d063fd04)
- **encroachment permits · fee fee title effective 7 1 26 · residential water conservation projects · amount** = 0 USD · as [fee fee title effective 7 1 26 · residential water conservation projects](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/encroachment-permits/fee-fee-title-effective-7-1-26/residential-water-conservation-projects) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=850&end=898) · [sha256:b9b35c885e4dc86a…](/hashes/sha256:b9b35c885e4dc86a0523e1188f08ffd114efcb192f3ac3e5355b86022fabf1b2)
- **encroachment permits · fee fee title effective 7 1 26 · residential structure · amount** = 400 USD · as [fee fee title effective 7 1 26 · residential structure](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/encroachment-permits/fee-fee-title-effective-7-1-26/residential-structure) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=899&end=930) · [sha256:5ec9b55acb245b6b…](/hashes/sha256:5ec9b55acb245b6bd15b28a444ca66bea1d60bfc99a6fe304eee33d18263464d)
- **encroachment permits · fee fee title effective 7 1 26 · outdoor dining · amount** = 350 USD · as [fee fee title effective 7 1 26 · outdoor dining](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/encroachment-permits/fee-fee-title-effective-7-1-26/outdoor-dining) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=931&end=955) · [sha256:4dd0643164d30e61…](/hashes/sha256:4dd0643164d30e615f6f0676aa4913d2587f5f4230ef94ab2e06273d7355945c)
- **encroachment permits · fee fee title effective 7 1 26 · commercial hardscape · amount** = 400 USD · as [fee fee title effective 7 1 26 · commercial hardscape](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/encroachment-permits/fee-fee-title-effective-7-1-26/commercial-hardscape) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=956&end=986) · [sha256:c387ab9b10071a76…](/hashes/sha256:c387ab9b10071a76c8675aee39630dafb13e2a93fbd5b80c99916c0e01412976)
- **encroachment permits · fee fee title effective 7 1 26 · commercial structures minor · amount** = 400 USD · as [fee fee title effective 7 1 26 · commercial structures minor](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/encroachment-permits/fee-fee-title-effective-7-1-26/commercial-structures-minor) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=987&end=1026) · [sha256:af2a978eae832acf…](/hashes/sha256:af2a978eae832acf26be4fce6c4cfd4d9ffea8bac8a522de59076b6b08ba9506)
- **review of required studies in addition to consultant costs · fee fee title effective 7 1 26 · traffic study review of private project study · deposit · deposit** = 1000 USD · as [traffic study review of private project study · deposit](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/review-of-required-studies-in-addition-to-consultant-costs/fee-fee-title-effective-7-1-26/traffic-study-review-of-private-project-study/deposit) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=1524&end=1591) · [sha256:154461954dbd0217…](/hashes/sha256:154461954dbd021720f02cb070fc362def8a79f2938172cad4a2f6084694ef4f)
- **review of required studies in addition to consultant costs · fee fee title effective 7 1 26 · seismic review review of geologist study or peer review analysis · deposit · deposit** = 5000 USD · as [seismic review review of geologist study or peer review analysis · deposit](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/review-of-required-studies-in-addition-to-consultant-costs/fee-fee-title-effective-7-1-26/seismic-review-review-of-geologist-study-or-peer-review-analysis/deposit) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=1592&end=1677) · [sha256:0d55cde50ff8c6eb…](/hashes/sha256:0d55cde50ff8c6ebd5c11eb31f2163db4ff99b66bc6db85f105a7f63de785420)
- **30 abandonments · fee fee title effective 7 1 26 · abandonments · amount** = 851 USD · as [fee fee title effective 7 1 26 · abandonments](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/30-abandonments/fee-fee-title-effective-7-1-26/abandonments) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=1942&end=1963) · [sha256:f27df4e81a3c83b0…](/hashes/sha256:f27df4e81a3c83b0e567fd1215cff3eacc84693f81ea85f30d28dfc089635593)
- **30 abandonments · fee fee title effective 7 1 26 · grading plan check · amount** = 472 USD · as [fee fee title effective 7 1 26 · grading plan check](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/30-abandonments/fee-fee-title-effective-7-1-26/grading-plan-check) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=1964&end=1991) · [sha256:46a845644c4542f2…](/hashes/sha256:46a845644c4542f2ae027e4b12d99662491dc85dc88172e2edabf3202716ae70)
- **parcel tract maps in addition to consultant costs · fee fee title effective 7 1 26 · contract processing and administration · amount** = 266 USD · as [fee fee title effective 7 1 26 · contract processing and administration](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/parcel-tract-maps-in-addition-to-consultant-costs/fee-fee-title-effective-7-1-26/contract-processing-and-administration) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2045&end=2092) · [sha256:76dfd9e831aa54b4…](/hashes/sha256:76dfd9e831aa54b4f2531ed48cd450380ba8049ef536a337a51db70c47e029c6)
- **parcel tract maps in addition to consultant costs · fee fee title effective 7 1 26 · re check contract processing and administration each · amount** = 148 USD · as [fee fee title effective 7 1 26 · re check contract processing and administration each](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/parcel-tract-maps-in-addition-to-consultant-costs/fee-fee-title-effective-7-1-26/re-check-contract-processing-and-administration-each) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2093&end=2158) · [sha256:52f1c65f747b14a9…](/hashes/sha256:52f1c65f747b14a970a412558d6da6dd42f057546990693ba6dd04d48525c4bb)
- **other inspection fees · fee fee title effective 7 1 26 · inspections outside of normal business hours per hour two hour minimum · basis** = Per Hour · as [fee fee title effective 7 1 26 · inspections outside of normal business hours per hour two hour minimum](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/inspections-outside-of-normal-business-hours-per-hour-two-hour-minimum) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2261&end=2266) · [sha256:aae32694901df23d…](/hashes/sha256:aae32694901df23df36ad25731495c7704156a762f60b64cbc51865538b7105e)
- **other inspection fees · fee fee title effective 7 1 26 · inspections outside of normal business hours per hour two hour minimum · rate** = 134 USD · as [fee fee title effective 7 1 26 · inspections outside of normal business hours per hour two hour minimum](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/inspections-outside-of-normal-business-hours-per-hour-two-hour-minimum) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2261&end=2266) · [sha256:f2e8d5322d500d31…](/hashes/sha256:f2e8d5322d500d3198ccb96525235780b142ad0cb3b23a7c620c483efc939ba5)
- **other inspection fees · fee fee title effective 7 1 26 · re inspection fees assessed under provisions of building code section 108 8 per hour · rate** = 134 USD · as [fee fee title effective 7 1 26 · re inspection fees assessed under provisions of building code section 108 8 per hour](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/re-inspection-fees-assessed-under-provisions-of-building-code-section-108-8-per-hour) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2359&end=2364) · [sha256:5965d4b28d95af5e…](/hashes/sha256:5965d4b28d95af5e471e3cf8a8d5382cf60bb002793ef91eebcc304daf57ad69)
- **other inspection fees · fee fee title effective 7 1 26 · re inspection fees assessed under provisions of building code section 108 8 per hour · basis** = Per Hour · as [fee fee title effective 7 1 26 · re inspection fees assessed under provisions of building code section 108 8 per hour](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/re-inspection-fees-assessed-under-provisions-of-building-code-section-108-8-per-hour) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2359&end=2364) · [sha256:b4e55dd82c12dc4f…](/hashes/sha256:b4e55dd82c12dc4fca5296baff0fe901e245cf49444a0caa7ff9993e044dc367)
- **other inspection fees · fee fee title effective 7 1 26 · inspections for which no fee is specifically indicated per hour minimum charge one half hour · basis** = Per Hour · as [fee fee title effective 7 1 26 · inspections for which no fee is specifically indicated per hour minimum charge one half hour](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/inspections-for-which-no-fee-is-specifically-indicated-per-hour-minimum-charge-one-half-hour) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2466&end=2471) · [sha256:5ca7fdc6661f2f8b…](/hashes/sha256:5ca7fdc6661f2f8b1060f74b052ff11d32ccd646d7a9940f3309c7aa7f79e242)
- **other inspection fees · fee fee title effective 7 1 26 · inspections for which no fee is specifically indicated per hour minimum charge one half hour · rate** = 134 USD · as [fee fee title effective 7 1 26 · inspections for which no fee is specifically indicated per hour minimum charge one half hour](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/inspections-for-which-no-fee-is-specifically-indicated-per-hour-minimum-charge-one-half-hour) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2466&end=2471) · [sha256:d9980ebaec36ceff…](/hashes/sha256:d9980ebaec36ceff80c5042e9178f926bd0f72b9f65b022bd1e8ae370d93c9b0)
- **other inspection fees · fee fee title effective 7 1 26 · additional plan review required by changes additions or revisions to plans per hour · rate** = 134 USD · as [fee fee title effective 7 1 26 · additional plan review required by changes additions or revisions to plans per hour](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/additional-plan-review-required-by-changes-additions-or-revisions-to-plans-per-hour) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2564&end=2569) · [sha256:e84a0eb5bbb466f7…](/hashes/sha256:e84a0eb5bbb466f7aa2f9aa69ee1f1c94ad492ddb8e49d7b08f2a5fd25fe5e42)
- **other inspection fees · fee fee title effective 7 1 26 · additional plan review required by changes additions or revisions to plans per hour · basis** = Per Hour · as [fee fee title effective 7 1 26 · additional plan review required by changes additions or revisions to plans per hour](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-inspection-fees/fee-fee-title-effective-7-1-26/additional-plan-review-required-by-changes-additions-or-revisions-to-plans-per-hour) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2564&end=2569) · [sha256:f3153f4fe6cf7aa8…](/hashes/sha256:f3153f4fe6cf7aa8b9348f41fae3c38cca3b0307a107abfec6053157a805e45c)
- **other agency fees pass through · fee fee title effective 7 1 26 · sandag regional transportation congestion impact fee · each newly constructed residential unit · rate** = 3109.88 USD · as [sandag regional transportation congestion impact fee · each newly constructed residential unit](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/engineering-project-development-fee-schedule/other-agency-fees-pass-through/fee-fee-title-effective-7-1-26/sandag-regional-transportation-congestion-impact-fee/each-newly-constructed-residential-unit) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2699&end=2709) · [sha256:c73ab449e12764e3…](/hashes/sha256:c73ab449e12764e34a79890d184b62d52c18b3416b44599b26945ae23e0c1a95)

### fire plan check fee schedule (40 records)

- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · parking structure · amount** = 918 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · parking structure](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/parking-structure) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3520&end=3557) · [sha256:3e0525af6ece6c32…](/hashes/sha256:3e0525af6ece6c32b2cc259cd735539c0f073299b48871e9ab2664612fc4686c)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · parking structure · amount** = 964 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · parking structure](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/parking-structure) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3520&end=3557) · [sha256:a3b221d78ca91d1f…](/hashes/sha256:a3b221d78ca91d1f6a75a5b9ed37883b4dc8ca88ba60236ca041a4698be63efa)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous occupancy · amount** = 1513 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous occupancy](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/hazardous-occupancy) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3649&end=3692) · [sha256:7b6f356f8fb6aae4…](/hashes/sha256:7b6f356f8fb6aae4d046a7a09eb726b58acd53c9fae9a1cb5d28dd57899aa0ac)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous occupancy · amount** = 1589 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous occupancy](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/hazardous-occupancy) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3649&end=3692) · [sha256:c24a5593bd884109…](/hashes/sha256:c24a5593bd884109ab74b0415442d6cf6aff8b785a91c31ca3d3544f49296df8)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti restaurant · amount** = 730 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti restaurant](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/ti-restaurant) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3786&end=3820) · [sha256:26a7f2091bf73622…](/hashes/sha256:26a7f2091bf736228e90ba34b3e66539b45a3e34d509c6096cfd347bb031e699)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti restaurant · amount** = 695 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti restaurant](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/ti-restaurant) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3786&end=3820) · [sha256:fd561f1384780fed…](/hashes/sha256:fd561f1384780fed2912f57c0fcccab1ad79ab8ce661f472247ab350ff04e08d)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti general all other · amount** = 575 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti general all other](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/ti-general-all-other) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3893&end=3936) · [sha256:5c67afdcf9a9f44f…](/hashes/sha256:5c67afdcf9a9f44f809a2301e5b62a74204da26f3e5af76037c26acf13cab1f1)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti general all other · amount** = 548 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · ti general all other](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/ti-general-all-other) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=3893&end=3936) · [sha256:fc9c1d07ad1a3afd…](/hashes/sha256:fc9c1d07ad1a3afdd352e84d5f9f1cc798783232005a66640756f5aea47c0a51)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous · amount** = 695 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/hazardous) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4007&end=4035) · [sha256:66b686d7367d0fb1…](/hashes/sha256:66b686d7367d0fb12f16407f0404004c998af743c8281d189750f2d8422f8a68)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous · amount** = 730 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · hazardous](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/hazardous) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4007&end=4035) · [sha256:7635db24d41b8b8a…](/hashes/sha256:7635db24d41b8b8a99916a2f3f86affe4ff3b90e4b9c18368c04abba3a6fa7b8)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · medical · amount** = 695 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · medical](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/medical) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4108&end=4134) · [sha256:564c5f641050ecf7…](/hashes/sha256:564c5f641050ecf70b1bf901ccd370a049cd9ff523c713c5a2c9927d7176d0bd)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · medical · amount** = 730 USD · as [fee occupancy sq ft effective 7 1 22 effective 7 1 23 · medical](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/medical) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4108&end=4134) · [sha256:fdec52cb5f2253d2…](/hashes/sha256:fdec52cb5f2253d290cf5d6fae6133f9133c0093dbcb4a0b42fd9d302005c232)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · amount** = 627 USD [inferred] · as [size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4292&end=4309) · [sha256:25ff620dad6d4866…](/hashes/sha256:25ff620dad6d4866235d951d1ef1cb4c283dee72ededce3aad46da69ebec46d5)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · amount** = 597 USD [inferred] · as [size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4292&end=4309) · [sha256:ee658db76bab56a5…](/hashes/sha256:ee658db76bab56a53349ec1f04b5af770ac0a03f0d79ed544037aed3ca45e31a)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · amount** = 633 USD [inferred] · as [size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4310&end=4327) · [sha256:50872b8d179a00db…](/hashes/sha256:50872b8d179a00db3e42a472884e8c6bd33d70ced3315f3be6c3587f6fecbd74)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · amount** = 665 USD [inferred] · as [size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4310&end=4327) · [sha256:dc7c37126f0e71b7…](/hashes/sha256:dc7c37126f0e71b7cf1ea48cc3991dd7e6a9d74a5884d492eccd9973bd2addfc)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · amount** = 870 USD [inferred] · as [size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4328&end=4345) · [sha256:664734ed22ceac98…](/hashes/sha256:664734ed22ceac9849a966c04efb5b3e877e717ce1805ad8965c43816423f508)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · amount** = 913 USD [inferred] · as [size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4328&end=4345) · [sha256:b9d9c32844fdde5c…](/hashes/sha256:b9d9c32844fdde5c5445b5862da202a3a5747c407c79a7d80d9ba70dfb06493e)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · single family 1 or 2 family · 1 000 · amount** = 301 USD · as [single family 1 or 2 family · 1 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/single-family-1-or-2-family/1-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4617&end=4665) · [sha256:137a69b4295755d2…](/hashes/sha256:137a69b4295755d27999422498c6270eb9ce695d2904109605af424b24d22e0b)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · single family 1 or 2 family · 1 000 · amount** = 286 USD · as [single family 1 or 2 family · 1 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/single-family-1-or-2-family/1-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4617&end=4665) · [sha256:526bd21a510888cf…](/hashes/sha256:526bd21a510888cf7372574d91deb2a5d537831aa0d4f1abbe1c03000fb77ded)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 1 000 · amount** = 311 USD · as [sprinklers nfpa 13 13r 13d · 1 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/1-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4758&end=4808) · [sha256:a36f3e5718b7969a…](/hashes/sha256:a36f3e5718b7969a90406a38e4d6e18a99422dba5b32261e29426110d157f999)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 1 000 · amount** = 327 USD · as [sprinklers nfpa 13 13r 13d · 1 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/1-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4758&end=4808) · [sha256:c05a6644ee635941…](/hashes/sha256:c05a6644ee635941034775775b622661371f814055044b1887f747aeeb8dab65)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 5 000 · amount** = 400 USD · as [sprinklers nfpa 13 13r 13d · 5 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/5-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4809&end=4826) · [sha256:019b0c8cb84cbcbc…](/hashes/sha256:019b0c8cb84cbcbcfc41d001752a2fb893be99b8e12ac22088f090a13c2ab729)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 5 000 · amount** = 420 USD · as [sprinklers nfpa 13 13r 13d · 5 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/5-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4809&end=4826) · [sha256:99883dddb56264de…](/hashes/sha256:99883dddb56264deb5704593adf15358dec0253c391aabd44fdcd9bc14362811)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 12 500 · amount** = 460 USD · as [sprinklers nfpa 13 13r 13d · 12 500](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/12-500) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4827&end=4845) · [sha256:5f209c9bba00e5fa…](/hashes/sha256:5f209c9bba00e5fa813938f16c1acfee8de60cb29bf0e8bbf2d4dd7896d6e5df)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 12 500 · amount** = 483 USD · as [sprinklers nfpa 13 13r 13d · 12 500](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/12-500) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4827&end=4845) · [sha256:e2b8b2ce16028b5f…](/hashes/sha256:e2b8b2ce16028b5fd19679b480e362774cc108f187c58caa5d327697ed389e1b)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 25 000 · amount** = 651 USD · as [sprinklers nfpa 13 13r 13d · 25 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/25-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4846&end=4864) · [sha256:a1e52720bca1d831…](/hashes/sha256:a1e52720bca1d8315a2156d7c936a89dbc77cc7c754cac0457e98a80380049c2)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 25 000 · amount** = 620 USD · as [sprinklers nfpa 13 13r 13d · 25 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/25-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4846&end=4864) · [sha256:c54bb678d020ad04…](/hashes/sha256:c54bb678d020ad045a7dd5ee4d9e0844b03b935023130c159676faadf154517b)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 125 000 · amount** = 976 USD · as [sprinklers nfpa 13 13r 13d · 125 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/125-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4865&end=4884) · [sha256:31129c8c505909e9…](/hashes/sha256:31129c8c505909e9958f13994602b5163050d919f655052ce8a5fff4d17370c6)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · 125 000 · amount** = 930 USD · as [sprinklers nfpa 13 13r 13d · 125 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/125-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4865&end=4884) · [sha256:68fe43837e217199…](/hashes/sha256:68fe43837e21719925d0ada35389033bdd4d3c8ed2344df50b0124e1172b79ca)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · each additional 125 000 · amount** = 620 USD · as [sprinklers nfpa 13 13r 13d · each additional 125 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/each-additional-125-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4885&end=4920) · [sha256:2588307899a4f71b…](/hashes/sha256:2588307899a4f71b591214628fed7c1d06f832487c2eac775eeb0ff9f5a126a7)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · sprinklers nfpa 13 13r 13d · each additional 125 000 · amount** = 651 USD · as [sprinklers nfpa 13 13r 13d · each additional 125 000](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/sprinklers-nfpa-13-13r-13d/each-additional-125-000) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4885&end=4920) · [sha256:b75ccb44e5931b9e…](/hashes/sha256:b75ccb44e5931b9eb12858604559cf192cb7cb28843be8118891b1cad88bd8df)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · cfc 9 3 4 supervision and alarm only · each standpipe · amount** = 337 USD · as [cfc 9 3 4 supervision and alarm only · each standpipe](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/cfc-9-3-4-supervision-and-alarm-only/each-standpipe) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4921&end=4988) · [sha256:1f8f3cbadc85c9ab…](/hashes/sha256:1f8f3cbadc85c9abd59f2667a2f2ca72a3d515264fc9220f35e7103a89153c21)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · cfc 9 3 4 supervision and alarm only · each standpipe · amount** = 354 USD · as [cfc 9 3 4 supervision and alarm only · each standpipe](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/cfc-9-3-4-supervision-and-alarm-only/each-standpipe) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=4921&end=4988) · [sha256:372435d8f04bd549…](/hashes/sha256:372435d8f04bd54950d0272e789fd26fb84cf12d630dce8493db605edef755c0)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · nfpa 17 suppression systems · each 500 sf · amount** = 523 USD · as [nfpa 17 suppression systems · each 500 sf](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/nfpa-17-suppression-systems/each-500-sf) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=5173&end=5227) · [sha256:bcbb080bc5f3087e…](/hashes/sha256:bcbb080bc5f3087ebe5ee82f50a8268b3834b2454e62366e2e8c0408b7c65b9c)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · nfpa 17 suppression systems · each 500 sf · amount** = 549 USD · as [nfpa 17 suppression systems · each 500 sf](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/nfpa-17-suppression-systems/each-500-sf) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=5173&end=5227) · [sha256:edc4cc41c21c4824…](/hashes/sha256:edc4cc41c21c48249e33137a182812fb550c9c756ecb8bf55dbb2ca2458e43f9)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · nfpa 12 industrial suppression systems · each appliance · amount** = 460 USD · as [nfpa 12 industrial suppression systems · each appliance](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/nfpa-12-industrial-suppression-systems/each-appliance) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=5228&end=5293) · [sha256:16e68bfc4782afb8…](/hashes/sha256:16e68bfc4782afb8940104407bb1e7059ebb50d5f32bbd3058929b8e252ed8c8)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · nfpa 12 industrial suppression systems · each appliance · amount** = 483 USD · as [nfpa 12 industrial suppression systems · each appliance](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/nfpa-12-industrial-suppression-systems/each-appliance) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=5228&end=5293) · [sha256:931bc0afb0842c2f…](/hashes/sha256:931bc0afb0842c2f8ae993653f23702ddf01b12a12b8ddc0423c001c2c171a9c)
- **for new construction and tenant improvements · current adjusted · size basis fy 2022 23 fy 2023 24 · fee occupancy sq ft effective 7 1 22 effective 7 1 23 · nfpa 12 industrial suppression systems · each appliance · basis** = Each appliance · as [nfpa 12 industrial suppression systems · each appliance](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/fire-plan-check-fee-schedule/for-new-construction-and-tenant-improvements/current-adjusted/size-basis-fy-2022-23-fy-2023-24/fee-occupancy-sq-ft-effective-7-1-22-effective-7-1-23/nfpa-12-industrial-suppression-systems/each-appliance) · [quote](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa?trace&start=5228&end=5293) · [sha256:a68254d9be57b45f…](/hashes/sha256:a68254d9be57b45f51f3811c2be8a0294db9d98dceb37158bece047033b58756) · same value when read [17 Sep 2026, 05:15 UTC](/hashes/sha256:c67ca80d7d05269efa9881faa374e904698dc016ce719b719194f4f602b75970)

### public services user fee schedule (5 records)

- **building related beyond normal review · plan check plus inspection · fee fee title effective 7 1 26 · storm water plan check new construction · flat rate · amount** = 632 USD · as [storm water plan check new construction · flat rate](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/public-services-user-fee-schedule/building-related-beyond-normal-review/plan-check-plus-inspection/fee-fee-title-effective-7-1-26/storm-water-plan-check-new-construction/flat-rate) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=2976&end=2992) · [sha256:30cff6f64faa2632…](/hashes/sha256:30cff6f64faa26322b23e006c8cecaf4b77be2f481195a14c319cc3995483756)
- **building related beyond normal review · plan check plus inspection · fee fee title effective 7 1 26 · storm water inspection new construction · flat rate · amount** = 40 USD · as [storm water inspection new construction · flat rate](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/public-services-user-fee-schedule/building-related-beyond-normal-review/plan-check-plus-inspection/fee-fee-title-effective-7-1-26/storm-water-inspection-new-construction/flat-rate) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=3072&end=3091) · [sha256:fc1aa9d6ed58c571…](/hashes/sha256:fc1aa9d6ed58c571283fe5a88c89e2dd48572bcf9e37d8b3cf49f48853e612e3)
- **building related beyond normal review · plan check plus inspection · fee fee title effective 7 1 26 · storm water plan check triggered by projects that require a stormwater pollution prevention plan swppp 1 acre or more or standard urban stormwater mitigation plan susmp 10 units or more high threat activity · deposit · deposit** = 5000 USD · as [storm water plan check triggered by projects that require a stormwater pollution prevention plan swppp 1 acre or more or standard urban stormwater mitigation plan susmp 10 units or more high threat activity · deposit](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/public-services-user-fee-schedule/building-related-beyond-normal-review/plan-check-plus-inspection/fee-fee-title-effective-7-1-26/storm-water-plan-check-triggered-by-projects-that-require-a-stormwater-pollution-prevention-plan-swppp-1-acre-or-more-or-standard-urban-stormwater-mitigation-plan-susmp-10-units-or-more-high-threat-activity/deposit) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=3337&end=3355) · [sha256:813f1b4d24a077d1…](/hashes/sha256:813f1b4d24a077d12a51ab0483f29cfafef491684d14b858868ec6faab0b5cee)
- **inspection only · fee fee title effective 7 1 26 · susmp annual inspection post construction annual fee · fee** = 403 USD · as [fee fee title effective 7 1 26 · susmp annual inspection post construction annual fee](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/public-services-user-fee-schedule/inspection-only/fee-fee-title-effective-7-1-26/susmp-annual-inspection-post-construction-annual-fee) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=3607&end=3614) · [sha256:6990e86920093aa3…](/hashes/sha256:6990e86920093aa389f4b83024cdb61a336a7234e2b73037872bdffffb0c1193)
- **inspection only · fee fee title effective 7 1 26 · compliance follow up · fee** = 84 USD · as [fee fee title effective 7 1 26 · compliance follow up](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/public-services-user-fee-schedule/inspection-only/fee-fee-title-effective-7-1-26/compliance-follow-up) · [quote](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8?trace&start=3615&end=3642) · [sha256:1ed48b4b9f055312…](/hashes/sha256:1ed48b4b9f0553120e930a3ca48b7a9a78a1a5b5ab61348b395f8806deedca3c)

## Captures (2)

- 15 Sep 2026, 02:44 UTC · https://www.coronado.ca.us/DocumentCenter/View/2680/Public-Services-and-Engineering-User-Fee-Schedule- · full text (no licence recorded) · 0 revisits · [text](/hashes/sha256:44f71d407ad457f1d304793a74051f604778fdec45dd5d1d969a2b5cb6f038b8) (pdfium/7881, 5300 bytes) · capture [sha256:720e07b02dfdf7f7…](/hashes/sha256:720e07b02dfdf7f74f3d4e4f047f23b99fd3c826342a2a86149aaf9b3ccb6c0e)
- 15 Sep 2026, 02:44 UTC · https://www.coronado.ca.us/DocumentCenter/View/941/Fire-Fee-Schedule-FY-2023-to-2024-Fees-PDF?bidId= · full text (no licence recorded) · 0 revisits · [text](/hashes/sha256:7c46706351220f3ca2d6bbe807d037a6756a758c3c6039a6aae65b6d6c63befa) (pdfium/7881, 5354 bytes) · capture [sha256:9a585281c90547a2…](/hashes/sha256:9a585281c90547a226a72cfb21cfbe27e2af3ac975d64a612effa2f929c4bdf6)

[the package (WACZ)](/california-fee-schedules/jurisdictions/coronado-ca-us/fee-schedule/work.wacz)
34 things the latest capture still names and no reading of it has read.


A capture is what the source served at that moment; a later change at the source is a new capture, never an edit to this one.

---
[standing](/standing) · Drillable™ is a trademark of Drillable LLC.
