# CITY OF CUPERTINO building fees

drillable.com › california-fee-schedules › jurisdictions › cupertino-gov › building-fees.
As of the capture of 15 Sep 2026; the index built 18 Sep 2026, 23:02 UTC · [cites, never asserts](/standing).
Source: https://www.cupertino.gov/files/assets/city/v/1/departments/documents/community-development/building/forms-amp-handouts-amp-fees/fees/fee-schedule-building-fees.pdf · full text, no licence recorded.
Search `/california-fee-schedules/jurisdictions/cupertino-gov/building-fees?q=…` · MCP https://mcp.drillable.com · [html](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees?format=html) · [markdown](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees?format=md) · [json](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees?format=json) · [discovery](/.well-known/drillable.json) · [guide](/llms.txt)

No in-force window is declared for the document.

## Records read from it (654)

525 of 656 figures in the text, amounts and percentages, have a record.

By drillable.com ([value-label/2](/standing#methods)); not yet scored by the harness.

### schedule d table 3 miscellaneous items (276 records)

- **work item · unit fy 2026 27 proposed fee · standard hourly rate building · rate** = 303 USD · as [unit fy 2026 27 proposed fee · standard hourly rate building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/standard-hourly-rate-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7824&end=7870) · [sha256:3abedefaa142587e…](/hashes/sha256:3abedefaa142587eed4f8f700084fdad4a1c989aa76289b455c02aa0f887e6fb)
- **work item · unit fy 2026 27 proposed fee · standard hourly rate building · basis** = Per hour · as [unit fy 2026 27 proposed fee · standard hourly rate building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/standard-hourly-rate-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7824&end=7870) · [sha256:78f2097cde221460…](/hashes/sha256:78f2097cde221460aa34d870d7ec7f4f24e281631a10528bbd95dc0a6e3c4bb9)
- **work item · unit fy 2026 27 proposed fee · accessibility hardship exemption · basis** = Each · as [unit fy 2026 27 proposed fee · accessibility hardship exemption](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessibility-hardship-exemption) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7871&end=7914) · [sha256:cf4789651d9ce18e…](/hashes/sha256:cf4789651d9ce18e2cc4aa4e4358a40e78b658fdfcf1089764f415df55655575)
- **work item · unit fy 2026 27 proposed fee · accessibility hardship exemption · amount** = 316 USD · as [unit fy 2026 27 proposed fee · accessibility hardship exemption](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessibility-hardship-exemption) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7871&end=7914) · [sha256:eaefe426b00daf5f…](/hashes/sha256:eaefe426b00daf5f5e943b86d69699c174e843e075c57ef04e2a0a72691df86e)
- **work item · unit fy 2026 27 proposed fee · acoustical review single family home duplex new · amount** = 746 USD · as [unit fy 2026 27 proposed fee · acoustical review single family home duplex new](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/acoustical-review-single-family-home-duplex-new) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7933&end=7977) · [sha256:923fd9e6e1f1bfc1…](/hashes/sha256:923fd9e6e1f1bfc12e160cd256c5e142528fbac3f1ceeb31f616c3f11d52a801)
- **work item · unit fy 2026 27 proposed fee · acoustical review single family home duplex new · basis** = Each · as [unit fy 2026 27 proposed fee · acoustical review single family home duplex new](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/acoustical-review-single-family-home-duplex-new) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7933&end=7977) · [sha256:aff878fefd4b21a1…](/hashes/sha256:aff878fefd4b21a1f090f3b057ec05aeed0250500a2888a0716c5df58a6d54bc)
- **work item · unit fy 2026 27 proposed fee · single family home duplex addition alteration · amount** = 439 USD · as [unit fy 2026 27 proposed fee · single family home duplex addition alteration](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/single-family-home-duplex-addition-alteration) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7978&end=8039) · [sha256:31e87021b328f078…](/hashes/sha256:31e87021b328f078849d414c662ab01b44d6d0a19d2215ba911387c950eb6d33)
- **work item · unit fy 2026 27 proposed fee · single family home duplex addition alteration · basis** = Each · as [unit fy 2026 27 proposed fee · single family home duplex addition alteration](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/single-family-home-duplex-addition-alteration) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7978&end=8039) · [sha256:42d82224771844ec…](/hashes/sha256:42d82224771844ecd32ce4f4eacd869c6b507bcf1ea8d2756670f7b28bfbb36d)
- **work item · unit fy 2026 27 proposed fee · multi family commercial · amount** = 746 USD · as [unit fy 2026 27 proposed fee · multi family commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/multi-family-commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8040&end=8075) · [sha256:8b97a991069171f5…](/hashes/sha256:8b97a991069171f5220c21e627cca38180b82883fbab67045decd97bbb294229)
- **work item · unit fy 2026 27 proposed fee · multi family commercial · basis** = Each · as [unit fy 2026 27 proposed fee · multi family commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/multi-family-commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8040&end=8075) · [sha256:980da6ffd9bc4d41…](/hashes/sha256:980da6ffd9bc4d419a36c1b8a56259aabb21bbe138c92af1b415820d095c518d)
- **work item · unit fy 2026 27 proposed fee · additions non hillside r3 occupancy plan check fees plan check fees up to 250 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · additions non hillside r3 occupancy plan check fees plan check fees up to 250 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/additions-non-hillside-r3-occupancy-plan-check-fees-plan-check-fees-up-to-250-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8133&end=8182) · [sha256:5e69c11d0ef616f7…](/hashes/sha256:5e69c11d0ef616f73f8d919f903c0e8dae6f976155ae50b6ed79031dfd9eec49)
- **work item · unit fy 2026 27 proposed fee · additions non hillside r3 occupancy plan check fees plan check fees up to 250 sq ft · amount** = 2794 USD · as [unit fy 2026 27 proposed fee · additions non hillside r3 occupancy plan check fees plan check fees up to 250 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/additions-non-hillside-r3-occupancy-plan-check-fees-plan-check-fees-up-to-250-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8133&end=8182) · [sha256:711a92aa580be978…](/hashes/sha256:711a92aa580be978906bfe353678e0f2f9bbb0e838b81ddc369bb74d79e33177)
- **work item · unit fy 2026 27 proposed fee · plan check fees 251 499 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · plan check fees 251 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-check-fees-251-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8183&end=8232) · [sha256:0adf389caea844cc…](/hashes/sha256:0adf389caea844cc495061b16f9bbe5cdee2703df221758d58ce3193a4cc7fe7)
- **work item · unit fy 2026 27 proposed fee · plan check fees 251 499 sq ft · amount** = 5322 USD · as [unit fy 2026 27 proposed fee · plan check fees 251 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-check-fees-251-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8183&end=8232) · [sha256:f088679b3fd85d7e…](/hashes/sha256:f088679b3fd85d7e2b2241e77b328dff7f468bb447d61c2474481d752235202d)
- **work item · unit fy 2026 27 proposed fee · plan check fees 500 999 sq ft · amount** = 6586 USD · as [unit fy 2026 27 proposed fee · plan check fees 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-check-fees-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8233&end=8281) · [sha256:65f8946d9e73587d…](/hashes/sha256:65f8946d9e73587db2022f892e22dcc623024abe72575791200bc401bd65a97a)
- **work item · unit fy 2026 27 proposed fee · plan check fees 500 999 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · plan check fees 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-check-fees-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8233&end=8281) · [sha256:aaa0a9423b8dbaed…](/hashes/sha256:aaa0a9423b8dbaed2b43a2e4beb78b7fc91079738cd0d246a7ca823de949cee4) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:be3c1ff83eccba50f6e062025df6fa7404670e3be95b82d106ab29e9ea1b399f)
- **work item · unit fy 2026 27 proposed fee · plan check fees 500 999 sq ft · amount** = 4058 USD · as [unit fy 2026 27 proposed fee · plan check fees 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-check-fees-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8727&end=8776) · [sha256:2784b41580417c9c…](/hashes/sha256:2784b41580417c9c5654b918b034ea7ca7708fcd459ff63429725a0a6d94aad5)
- **work item · unit fy 2026 27 proposed fee · additions non hillside r3 occupancy inspection fees inspection fees up to 250 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · additions non hillside r3 occupancy inspection fees inspection fees up to 250 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/additions-non-hillside-r3-occupancy-inspection-fees-inspection-fees-up-to-250-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8339&end=8388) · [sha256:720c1498c4c9bb43…](/hashes/sha256:720c1498c4c9bb4360d89204de3186132abfc5f7211413b9edaa94e3768a9431)
- **work item · unit fy 2026 27 proposed fee · additions non hillside r3 occupancy inspection fees inspection fees up to 250 sq ft · amount** = 3570 USD · as [unit fy 2026 27 proposed fee · additions non hillside r3 occupancy inspection fees inspection fees up to 250 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/additions-non-hillside-r3-occupancy-inspection-fees-inspection-fees-up-to-250-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8339&end=8388) · [sha256:92dd8dc14ad02eb2…](/hashes/sha256:92dd8dc14ad02eb2d26b57e2e7d8774659ae8339ecff4f57515938a0126bf397)
- **work item · unit fy 2026 27 proposed fee · inspection fees 251 499 sq ft · amount** = 4760 USD · as [unit fy 2026 27 proposed fee · inspection fees 251 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspection-fees-251-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8389&end=8438) · [sha256:78047dabf868ef40…](/hashes/sha256:78047dabf868ef40f5a41ed1d77f95ce6823e209efcd9d0c343614951397326d)
- **work item · unit fy 2026 27 proposed fee · inspection fees 251 499 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · inspection fees 251 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspection-fees-251-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8389&end=8438) · [sha256:ca98b1e84b55ae39…](/hashes/sha256:ca98b1e84b55ae39abb970562214275697dbd0e42f1e906d3e8b3c87f04aea91)
- **work item · unit fy 2026 27 proposed fee · inspection fees 500 999 sq ft · amount** = 5950 USD · as [unit fy 2026 27 proposed fee · inspection fees 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspection-fees-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8439&end=8486) · [sha256:b7541d955e222cc0…](/hashes/sha256:b7541d955e222cc0c76f4fea667a9bb552d4f35bf63f302782a6c601d3f42e0d)
- **work item · unit fy 2026 27 proposed fee · inspection fees 500 999 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · inspection fees 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspection-fees-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8875&end=8924) · [sha256:8ca0de99d8368630…](/hashes/sha256:8ca0de99d83686305ec4528aa49c0290578be33465b4ec6428c4978a06e47bf0) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:cde8b859173fc38f115942b69daf807ec28d88968b656e56729398798bde67ec)
- **work item · unit fy 2026 27 proposed fee · inspection fees 500 999 sq ft · amount** = 4164 USD · as [unit fy 2026 27 proposed fee · inspection fees 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspection-fees-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8875&end=8924) · [sha256:ab63d8fc713988d5…](/hashes/sha256:ab63d8fc713988d50f632d82089698e1f576c73d3f86ffa466b9568e175a9694)
- **work item · unit fy 2026 27 proposed fee · accessory buildings residential accessory buildings up to 499 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · accessory buildings residential accessory buildings up to 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-buildings-residential-accessory-buildings-up-to-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8521&end=8574) · [sha256:31dc1c93ab003c5d…](/hashes/sha256:31dc1c93ab003c5dea1035f534d88b21935674a156e718f5df9813fc61176be5)
- **work item · unit fy 2026 27 proposed fee · accessory buildings residential accessory buildings up to 499 sq ft · amount** = 1954 USD · as [unit fy 2026 27 proposed fee · accessory buildings residential accessory buildings up to 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-buildings-residential-accessory-buildings-up-to-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8521&end=8574) · [sha256:7a9be7c773bf7231…](/hashes/sha256:7a9be7c773bf7231dda8b93c2f1fe37cd655390458a248c5889aae8a3e34d5e2)
- **work item · unit fy 2026 27 proposed fee · accessory buildings 500 999 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · accessory buildings 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-buildings-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8575&end=8628) · [sha256:52236ef6ff5affdd…](/hashes/sha256:52236ef6ff5affdd09fff07255c4f336e9704a6e9be7bb61d45d7d30c0f37886)
- **work item · unit fy 2026 27 proposed fee · accessory buildings 500 999 sq ft · amount** = 2866 USD · as [unit fy 2026 27 proposed fee · accessory buildings 500 999 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-buildings-500-999-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8575&end=8628) · [sha256:d1632cc6a694e6a8…](/hashes/sha256:d1632cc6a694e6a86a254ff5f8d8e8559c745f5cabf87b3d8678d0e8e336844a)
- **work item · unit fy 2026 27 proposed fee · accessory dwelling unit adu plan check fees plan check fees up to 499 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · accessory dwelling unit adu plan check fees plan check fees up to 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-dwelling-unit-adu-plan-check-fees-plan-check-fees-up-to-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8677&end=8726) · [sha256:17d07a823a73c454…](/hashes/sha256:17d07a823a73c4547fd494f5945ec703de3d40a33263aad7222475de4af4468e)
- **work item · unit fy 2026 27 proposed fee · accessory dwelling unit adu plan check fees plan check fees up to 499 sq ft · amount** = 2795 USD · as [unit fy 2026 27 proposed fee · accessory dwelling unit adu plan check fees plan check fees up to 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-dwelling-unit-adu-plan-check-fees-plan-check-fees-up-to-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8677&end=8726) · [sha256:69aaedd67d273efd…](/hashes/sha256:69aaedd67d273efdd149ad1f4a3af85d72bfd322d455cf0e396c96e08eb26112)
- **work item · unit fy 2026 27 proposed fee · accessory dwelling unit adu inspection fees inspection fees up to 499 sq ft · amount** = 2975 USD · as [unit fy 2026 27 proposed fee · accessory dwelling unit adu inspection fees inspection fees up to 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-dwelling-unit-adu-inspection-fees-inspection-fees-up-to-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8825&end=8874) · [sha256:7f5fed9e86c30764…](/hashes/sha256:7f5fed9e86c3076483cb20c08f03464a61e0f8ea8aac392ca9388be5562ef1fa)
- **work item · unit fy 2026 27 proposed fee · accessory dwelling unit adu inspection fees inspection fees up to 499 sq ft · basis** = Each · as [unit fy 2026 27 proposed fee · accessory dwelling unit adu inspection fees inspection fees up to 499 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/accessory-dwelling-unit-adu-inspection-fees-inspection-fees-up-to-499-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8825&end=8874) · [sha256:949d457f1fc555a7…](/hashes/sha256:949d457f1fc555a79d303c98cc6b6568e6a32b088320ef3586f67c345d141877)
- **work item · unit fy 2026 27 proposed fee · address assignment · basis** = Per hour · as [unit fy 2026 27 proposed fee · address assignment](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/address-assignment) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8925&end=8958) · [sha256:12c458073656fa8b…](/hashes/sha256:12c458073656fa8b4c8afca3acae04531875ec670ef713d411506043735d0a67)
- **work item · unit fy 2026 27 proposed fee · address assignment · rate** = 266 USD · as [unit fy 2026 27 proposed fee · address assignment](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/address-assignment) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8925&end=8958) · [sha256:eacde3d521d4b2ad…](/hashes/sha256:eacde3d521d4b2ad338a6a470e89ccb02baeb922a69da0b18285d342dacb9e7f)
- **work item · unit fy 2026 27 proposed fee · board of appeals · rate** = 303 USD · as [unit fy 2026 27 proposed fee · board of appeals](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/board-of-appeals) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8959&end=8990) · [sha256:88487bf7ca382716…](/hashes/sha256:88487bf7ca382716ab105c55dbbb63520450970db347b25be0cac944e9eabe1b)
- **work item · unit fy 2026 27 proposed fee · board of appeals · basis** = Per hour · as [unit fy 2026 27 proposed fee · board of appeals](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/board-of-appeals) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8959&end=8990) · [sha256:ac12653b2401f16c…](/hashes/sha256:ac12653b2401f16c92b6e7773cc7904103194c0df98b453d1e41d158ddaef816)
- **work item · unit fy 2026 27 proposed fee · clerical fee · rate** = 133 USD · as [unit fy 2026 27 proposed fee · clerical fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/clerical-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=8991&end=9018) · [sha256:1c66edccf9633216…](/hashes/sha256:1c66edccf96332163a2646b26a6db1b2bbe88edd5569a41fa9856463a90e69d9)
- **work item · unit fy 2026 27 proposed fee · alternate materials and methods of construction · basis** = Per hour · as [unit fy 2026 27 proposed fee · alternate materials and methods of construction](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/alternate-materials-and-methods-of-construction) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9019&end=9081) · [sha256:31da5a939433f983…](/hashes/sha256:31da5a939433f983cc7ae0b69012d829c22e13f844b9e4361a278e36d3ae53fd)
- **work item · unit fy 2026 27 proposed fee · alternate materials and methods of construction · rate** = 291 USD · as [unit fy 2026 27 proposed fee · alternate materials and methods of construction](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/alternate-materials-and-methods-of-construction) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9019&end=9081) · [sha256:5556506ac133072f…](/hashes/sha256:5556506ac133072f74929fd7ae473f2489835eff602cc7bfb63c2727d37c77ce)
- **work item · unit fy 2026 27 proposed fee · antenna telecom facility radio · basis** = Each · as [unit fy 2026 27 proposed fee · antenna telecom facility radio](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/antenna-telecom-facility-radio) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9110&end=9126) · [sha256:9139036b8a7a739f…](/hashes/sha256:9139036b8a7a739f0705351f390f2df41cdadb7e5f2ed450c0f7404983d5ebbb)
- **work item · unit fy 2026 27 proposed fee · antenna telecom facility radio · amount** = 521 USD · as [unit fy 2026 27 proposed fee · antenna telecom facility radio](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/antenna-telecom-facility-radio) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9110&end=9126) · [sha256:a8a959bd6623587a…](/hashes/sha256:a8a959bd6623587a0f39864f5d92a5aa9f5fdba1273c1081ba5b469488833268)
- **work item · unit fy 2026 27 proposed fee · cellular mobile phone alterations to existing facility · basis** = Each · as [unit fy 2026 27 proposed fee · cellular mobile phone alterations to existing facility](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/cellular-mobile-phone-alterations-to-existing-facility) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9127&end=9194) · [sha256:283068c107d8ce82…](/hashes/sha256:283068c107d8ce820d7e203f2c58ad60a5c7c67dd94533561ce2efb2e79cb63a)
- **work item · unit fy 2026 27 proposed fee · cellular mobile phone alterations to existing facility · amount** = 746 USD · as [unit fy 2026 27 proposed fee · cellular mobile phone alterations to existing facility](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/cellular-mobile-phone-alterations-to-existing-facility) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9127&end=9194) · [sha256:fdbf6db23d14e3ab…](/hashes/sha256:fdbf6db23d14e3abbb49dfb12ad37d3ba8fbb571c678b96d376ba334e7b2c741)
- **work item · unit fy 2026 27 proposed fee · cellular mobile phone free standing · amount** = 2587 USD · as [unit fy 2026 27 proposed fee · cellular mobile phone free standing](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/cellular-mobile-phone-free-standing) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9195&end=9246) · [sha256:7fff201c57a296f5…](/hashes/sha256:7fff201c57a296f5533b18d82e3749547b6cc42740f0c8325858b90704f8fb6f)
- **work item · unit fy 2026 27 proposed fee · cellular mobile phone free standing · basis** = Each · as [unit fy 2026 27 proposed fee · cellular mobile phone free standing](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/cellular-mobile-phone-free-standing) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9195&end=9246) · [sha256:8665ecee25f1b61d…](/hashes/sha256:8665ecee25f1b61da7c4053625a9848a3d72d34db4610228c6c6e72fb72f961a)
- **work item · unit fy 2026 27 proposed fee · cellular mobile phone attached to building · amount** = 1360 USD · as [unit fy 2026 27 proposed fee · cellular mobile phone attached to building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/cellular-mobile-phone-attached-to-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9247&end=9304) · [sha256:ad39688636eb62bc…](/hashes/sha256:ad39688636eb62bc6997a1d1b00aaf743eaf7e3272c14b9e80224f9382797b42)
- **work item · unit fy 2026 27 proposed fee · cellular mobile phone attached to building · basis** = Each · as [unit fy 2026 27 proposed fee · cellular mobile phone attached to building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/cellular-mobile-phone-attached-to-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9247&end=9304) · [sha256:dc431c8a94a536b0…](/hashes/sha256:dc431c8a94a536b030f05a1a6c5ac1678057af57e07335287834e9c560bb2481)
- **work item · unit fy 2026 27 proposed fee · arbor trellis · basis** = Each · as [unit fy 2026 27 proposed fee · arbor trellis](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/arbor-trellis) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9305&end=9330) · [sha256:39b4f5126ea76382…](/hashes/sha256:39b4f5126ea76382d5f9d295f667e6a12ec29f6dc57d24f52852682d6234966a)
- **work item · unit fy 2026 27 proposed fee · arbor trellis · amount** = 746 USD · as [unit fy 2026 27 proposed fee · arbor trellis](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/arbor-trellis) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9305&end=9330) · [sha256:99ccaf9ecbf4b902…](/hashes/sha256:99ccaf9ecbf4b90228a543b72f1523017eeb3043b3ab64655b4151a17f0bb181)
- **work item · unit fy 2026 27 proposed fee · awning canopy supported by building · basis** = Each · as [unit fy 2026 27 proposed fee · awning canopy supported by building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/awning-canopy-supported-by-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9331&end=9381) · [sha256:6de9698cf0f9ca02…](/hashes/sha256:6de9698cf0f9ca02da1c3f007cf291179dcd70470c18fe26601f7a5cf1036aed)
- **work item · unit fy 2026 27 proposed fee · awning canopy supported by building · amount** = 746 USD · as [unit fy 2026 27 proposed fee · awning canopy supported by building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/awning-canopy-supported-by-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9331&end=9381) · [sha256:c9326fe52599d914…](/hashes/sha256:c9326fe52599d9146ced708818915583fcd06115e181cb93ee9a4d499df419bb)
- **work item · unit fy 2026 27 proposed fee · balcony addition · basis** = Each · as [unit fy 2026 27 proposed fee · balcony addition](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/balcony-addition) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9382&end=9411) · [sha256:262fb586ece31402…](/hashes/sha256:262fb586ece3140286a7be71ddecef87a58d77d917c913aa21643dfc399cb63d)
- **work item · unit fy 2026 27 proposed fee · balcony addition · amount** = 1809 USD · as [unit fy 2026 27 proposed fee · balcony addition](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/balcony-addition) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9382&end=9411) · [sha256:f639cb1f4c4a0f6e…](/hashes/sha256:f639cb1f4c4a0f6ebdc1100d4e17d48961036149f83761fe637e4c3e4dd17c6f)
- **work item · unit fy 2026 27 proposed fee · battery energy storage system up to three 3 · amount** = 746 USD · as [unit fy 2026 27 proposed fee · battery energy storage system up to three 3](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/battery-energy-storage-system-up-to-three-3) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9412&end=9463) · [sha256:71f9a46d236596c2…](/hashes/sha256:71f9a46d236596c2653c11c9090e8ff8e90b109693a334b11e3a03c0b905bbea)
- **work item · unit fy 2026 27 proposed fee · battery energy storage system up to three 3 · basis** = Each · as [unit fy 2026 27 proposed fee · battery energy storage system up to three 3](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/battery-energy-storage-system-up-to-three-3) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9412&end=9463) · [sha256:cdf7e9d6a6530844…](/hashes/sha256:cdf7e9d6a653084488fae7aab0d580fc1f648398aebd33f00a078a3c3c06ce6b)
- **work item · unit fy 2026 27 proposed fee · each additional · amount** = 439 USD · as [unit fy 2026 27 proposed fee · each additional](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/each-additional) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9464&end=9490) · [sha256:11bcc2aa74f93862…](/hashes/sha256:11bcc2aa74f938627f1138043edd195a4c1806d9dd2aa9cfac146e00a83de464)
- **work item · unit fy 2026 27 proposed fee · each additional · basis** = Each · as [unit fy 2026 27 proposed fee · each additional](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/each-additional) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9464&end=9490) · [sha256:4c7d96b2aba8414b…](/hashes/sha256:4c7d96b2aba8414b96dd90561f371e2f7d8f7fdf4b5a8804ef74836536bae452)
- **work item · unit fy 2026 27 proposed fee · escrow inspection · of sale price · percent** = 0.52 % · as [escrow inspection · of sale price](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/escrow-inspection/of-sale-price) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9768&end=9807) · [sha256:29675342513e7c2b…](/hashes/sha256:29675342513e7c2b1eaff71a4e9a118ca31fa3f65e2ad6d05e437473d82afefc)
- **work item · unit fy 2026 27 proposed fee · carport · basis** = Each · as [unit fy 2026 27 proposed fee · carport](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/carport) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9808&end=9828) · [sha256:43bcc11aedb2de50…](/hashes/sha256:43bcc11aedb2de509596c9853d94dc50a7242bcae362b0703b2237ced4982241)
- **work item · unit fy 2026 27 proposed fee · carport · amount** = 1044 USD · as [unit fy 2026 27 proposed fee · carport](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/carport) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9808&end=9828) · [sha256:5bd4b64f0b0b3c4e…](/hashes/sha256:5bd4b64f0b0b3c4e2e65193bf04576513625d739a8df478f02121cc3598880f7)
- **work item · unit fy 2026 27 proposed fee · special inspector qualifications initial review · amount** = 583 USD · as [unit fy 2026 27 proposed fee · special inspector qualifications initial review](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/special-inspector-qualifications-initial-review) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9844&end=9905) · [sha256:6a30047f5e7ca794…](/hashes/sha256:6a30047f5e7ca7945f56c93e6713c92318ff447f19db744fff43c94f6884a856)
- **work item · unit fy 2026 27 proposed fee · special inspector qualifications initial review · basis** = Each · as [unit fy 2026 27 proposed fee · special inspector qualifications initial review](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/special-inspector-qualifications-initial-review) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9844&end=9905) · [sha256:bb82952bd587ef09…](/hashes/sha256:bb82952bd587ef09aea68da0201f87160aba368d98eee832fd96299e5caaab46)
- **work item · unit fy 2026 27 proposed fee · special inspector qualifications renewal update · amount** = 266 USD · as [unit fy 2026 27 proposed fee · special inspector qualifications renewal update](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/special-inspector-qualifications-renewal-update) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9906&end=9969) · [sha256:7ced3e89c3750660…](/hashes/sha256:7ced3e89c37506604aa724caf64e2277f88f007a9aeebd8133faab9624a9af47)
- **work item · unit fy 2026 27 proposed fee · special inspector qualifications renewal update · basis** = Each · as [unit fy 2026 27 proposed fee · special inspector qualifications renewal update](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/special-inspector-qualifications-renewal-update) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9906&end=9969) · [sha256:bb4ab8227d00ac36…](/hashes/sha256:bb4ab8227d00ac366ceff1ae4aa068e94b04f2db4a2a242fb6cadfe844d00bbd)
- **work item · unit fy 2026 27 proposed fee · chimney new · amount** = 1044 USD · as [unit fy 2026 27 proposed fee · chimney new](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/chimney-new) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9970&end=9997) · [sha256:78d9bc2980bab5c9…](/hashes/sha256:78d9bc2980bab5c943b0ad3b1f62f870b64cd7e3a6f1019e6d2f8f1658f15377)
- **work item · unit fy 2026 27 proposed fee · chimney new · basis** = Each · as [unit fy 2026 27 proposed fee · chimney new](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/chimney-new) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9970&end=9997) · [sha256:9fbd4ee41872921b…](/hashes/sha256:9fbd4ee41872921b336c278297e177dde03c06e16009884168d2ed3bdeb12807)
- **work item · unit fy 2026 27 proposed fee · chimney repair · basis** = Each · as [unit fy 2026 27 proposed fee · chimney repair](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/chimney-repair) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9998&end=10023) · [sha256:2136274ac980c736…](/hashes/sha256:2136274ac980c7360b96fac9597f59164ec063cd781be3ec5582d20bb95a56d0)
- **work item · unit fy 2026 27 proposed fee · chimney repair · amount** = 589 USD · as [unit fy 2026 27 proposed fee · chimney repair](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/chimney-repair) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=9998&end=10023) · [sha256:a3ebe963ea1e391c…](/hashes/sha256:a3ebe963ea1e391c4e8e69a11d22524e9ebec393c553a411d7f0ab69e249da3b)
- **work item · unit fy 2026 27 proposed fee · commercial coach per unit · amount** = 1360 USD · as [unit fy 2026 27 proposed fee · commercial coach per unit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/commercial-coach-per-unit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10024&end=10065) · [sha256:2e89a1a83d471de2…](/hashes/sha256:2e89a1a83d471de28e9e0b6e4f9eb64565944bf1997f1dd20ac0627b982b8e66)
- **work item · unit fy 2026 27 proposed fee · commercial coach per unit · basis** = Each · as [unit fy 2026 27 proposed fee · commercial coach per unit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/commercial-coach-per-unit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10024&end=10065) · [sha256:358d55daa2b117ec…](/hashes/sha256:358d55daa2b117ec38970af6751775d299b8f6145a0edf6aaf3b9fcdd3389b53)
- **work item · unit fy 2026 27 proposed fee · covered porch · amount** = 1044 USD · as [unit fy 2026 27 proposed fee · covered porch](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/covered-porch) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10066&end=10092) · [sha256:09701e14e6aa0688…](/hashes/sha256:09701e14e6aa0688ae61e8e9987396ea7785a508d1a30f5616407219850ba40b)
- **work item · unit fy 2026 27 proposed fee · covered porch · basis** = Each · as [unit fy 2026 27 proposed fee · covered porch](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/covered-porch) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10066&end=10092) · [sha256:6abb3e3adb3f7721…](/hashes/sha256:6abb3e3adb3f7721112ec6322aec81dd34130377a65b7d640c7489d3845b12e4)
- **work item · unit fy 2026 27 proposed fee · deck wood · basis** = Each · as [unit fy 2026 27 proposed fee · deck wood](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/deck-wood) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10093&end=10118) · [sha256:057d2dbedfa59b21…](/hashes/sha256:057d2dbedfa59b218771fb96d4fb8fbaed8f29035d9f154b5e4d0893125643bb)
- **work item · unit fy 2026 27 proposed fee · deck wood · amount** = 1044 USD · as [unit fy 2026 27 proposed fee · deck wood](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/deck-wood) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10093&end=10118) · [sha256:0642fb447cbec360…](/hashes/sha256:0642fb447cbec360f8945d67b17c66ffc5d73bd8091511d01a4c25666d4e8a41)
- **work item · unit fy 2026 27 proposed fee · deck railing · amount** = 589 USD · as [unit fy 2026 27 proposed fee · deck railing](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/deck-railing) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10119&end=10142) · [sha256:7d46d23cd78387b4…](/hashes/sha256:7d46d23cd78387b4855af0ea465ab7ce7253d4d10a296cdbcf20697638822971)
- **work item · unit fy 2026 27 proposed fee · deck railing · basis** = Each · as [unit fy 2026 27 proposed fee · deck railing](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/deck-railing) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10119&end=10142) · [sha256:dad132ba524f725d…](/hashes/sha256:dad132ba524f725d42b8a6898a0ceae914e66f8d7e4ad371af6dd47f15d33946)
- **work item · unit fy 2026 27 proposed fee · deferred submittal 2 hour minimum · basis** = Each · as [unit fy 2026 27 proposed fee · deferred submittal 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/deferred-submittal-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10143&end=10190) · [sha256:00a6c8d6aaab62a1…](/hashes/sha256:00a6c8d6aaab62a11d33be9d5c3a92ae12ecf491f1c752ea245cd7c487abcb13)
- **work item · unit fy 2026 27 proposed fee · deferred submittal 2 hour minimum · amount** = 303 USD · as [unit fy 2026 27 proposed fee · deferred submittal 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/deferred-submittal-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10143&end=10190) · [sha256:61963dd86d905539…](/hashes/sha256:61963dd86d9055399725aaa89ce1ee3c94953c7d2b5dc95d63328224ebd62a2f)
- **work item · unit fy 2026 27 proposed fee · demolition multi family and commercial up to 3 000 sf · amount** = 880 USD · as [unit fy 2026 27 proposed fee · demolition multi family and commercial up to 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/demolition-multi-family-and-commercial-up-to-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10202&end=10258) · [sha256:3c4b6576061a625d…](/hashes/sha256:3c4b6576061a625d7cb10eccaaab562426a85cb3fe0b52989b8d648e5502529d)
- **work item · unit fy 2026 27 proposed fee · demolition multi family and commercial up to 3 000 sf · basis** = Base · as [unit fy 2026 27 proposed fee · demolition multi family and commercial up to 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/demolition-multi-family-and-commercial-up-to-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10202&end=10258) · [sha256:437266e7ea982313…](/hashes/sha256:437266e7ea982313b5f8be3c357143f41f3ebb613ea3f85960b925ecb9524839)
- **work item · unit fy 2026 27 proposed fee · multi family and commercial each additional 3 000 sf · rate** = 306 USD · as [unit fy 2026 27 proposed fee · multi family and commercial each additional 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/multi-family-and-commercial-each-additional-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10259&end=10334) · [sha256:bdd21020d9aded13…](/hashes/sha256:bdd21020d9aded13f5ace8411d0b2548e44c962803e426aa2a107e9d525588a6)
- **work item · unit fy 2026 27 proposed fee · residential r 3 occ up to 3 000 sf · basis** = Base · as [unit fy 2026 27 proposed fee · residential r 3 occ up to 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/residential-r-3-occ-up-to-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10335&end=10386) · [sha256:36f322970ca3de65…](/hashes/sha256:36f322970ca3de65709cc5d9115b644b803dce3a8f051b865f9b06b8b31770f9)
- **work item · unit fy 2026 27 proposed fee · residential r 3 occ up to 3 000 sf · amount** = 880 USD · as [unit fy 2026 27 proposed fee · residential r 3 occ up to 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/residential-r-3-occ-up-to-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10335&end=10386) · [sha256:71f6af5e962a883b…](/hashes/sha256:71f6af5e962a883bd6a129e2975fe4015901d22944b024d9a29b2194fb65e8d2)
- **work item · unit fy 2026 27 proposed fee · residential r 3 occ each additional 3 000 sf · rate** = 306 USD · as [unit fy 2026 27 proposed fee · residential r 3 occ each additional 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/residential-r-3-occ-each-additional-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10387&end=10457) · [sha256:cc2505bd628d088f…](/hashes/sha256:cc2505bd628d088f4ae91dffebf2cc8056e2e3abc950581b820f80eb7a6e7f6f)
- **work item · unit fy 2026 27 proposed fee · swimming pool residential · amount** = 589 USD · as [unit fy 2026 27 proposed fee · swimming pool residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10458&end=10494) · [sha256:528a856c86af9c5d…](/hashes/sha256:528a856c86af9c5ddf776ab527a24b3c80c99d271be72c244f091e96cc4457ae)
- **work item · unit fy 2026 27 proposed fee · swimming pool residential · basis** = Each · as [unit fy 2026 27 proposed fee · swimming pool residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10458&end=10494) · [sha256:9f5227020a8c411d…](/hashes/sha256:9f5227020a8c411d9e85623adc3d645cde88db1a652b62950c1eae26236fbde2)
- **work item · unit fy 2026 27 proposed fee · swimming pool multi family and commercial up to 3 000 sf · amount** = 886 USD · as [unit fy 2026 27 proposed fee · swimming pool multi family and commercial up to 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-multi-family-and-commercial-up-to-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10495&end=10565) · [sha256:25a71e50e7194392…](/hashes/sha256:25a71e50e7194392edc86ad1336ad9dd2bdd263951ee5c0f9cf7ee520eef4359)
- **work item · unit fy 2026 27 proposed fee · swimming pool multi family and commercial up to 3 000 sf · basis** = Base · as [unit fy 2026 27 proposed fee · swimming pool multi family and commercial up to 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-multi-family-and-commercial-up-to-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10495&end=10565) · [sha256:a872385f31b25e8f…](/hashes/sha256:a872385f31b25e8fa52850058ca1d4adb3c4b01b2e0477759460578896dd3a8e)
- **work item · unit fy 2026 27 proposed fee · swimming pool multi family and commercial each additional 3 000 sf · rate** = 297 USD · as [unit fy 2026 27 proposed fee · swimming pool multi family and commercial each additional 3 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-multi-family-and-commercial-each-additional-3-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10566&end=10655) · [sha256:7626721d0ce50a21…](/hashes/sha256:7626721d0ce50a210dc01e340f41024f6a3198cdda30cab4ffcbc42ea14af70a)
- **work item · unit fy 2026 27 proposed fee · disabled access compliance inspection · basis** = Per hour · as [unit fy 2026 27 proposed fee · disabled access compliance inspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/disabled-access-compliance-inspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10656&end=10708) · [sha256:851ac28e73237bcd…](/hashes/sha256:851ac28e73237bcde120a4df82064c3e7e62071df64d537bb81b9d5aacc3d76f)
- **work item · unit fy 2026 27 proposed fee · disabled access compliance inspection · rate** = 303 USD · as [unit fy 2026 27 proposed fee · disabled access compliance inspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/disabled-access-compliance-inspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10656&end=10708) · [sha256:cb7d72e921529aa6…](/hashes/sha256:cb7d72e921529aa6bfd99bb4c1c3f9f2c74cbd64e08e86ba3a8caa2b6cdc6d88)
- **work item · unit fy 2026 27 proposed fee · new door non structural · basis** = Each · as [unit fy 2026 27 proposed fee · new door non structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/new-door-non-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10714&end=10750) · [sha256:a67c184d1a32780d…](/hashes/sha256:a67c184d1a32780d0143fd188b0282e0d1762be984ac9859ed0896a7b846469f)
- **work item · unit fy 2026 27 proposed fee · new door non structural · amount** = 439 USD · as [unit fy 2026 27 proposed fee · new door non structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/new-door-non-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10714&end=10750) · [sha256:cea5f8818e103892…](/hashes/sha256:cea5f8818e103892916fa9559e85b4ab3bbccec11e80a8b24e723ec8ab65875a)
- **work item · unit fy 2026 27 proposed fee · new door structural shear wall masonry · basis** = Each · as [unit fy 2026 27 proposed fee · new door structural shear wall masonry](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/new-door-structural-shear-wall-masonry) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10751&end=10803) · [sha256:238865dddaf96534…](/hashes/sha256:238865dddaf965343b06d069ff641f6542b7bb97c034d05c351c9b4ff68dc9e7)
- **work item · unit fy 2026 27 proposed fee · new door structural shear wall masonry · amount** = 746 USD · as [unit fy 2026 27 proposed fee · new door structural shear wall masonry](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/new-door-structural-shear-wall-masonry) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10751&end=10803) · [sha256:5d2ec297f5890e81…](/hashes/sha256:5d2ec297f5890e812a942024973ccf3890ca87e87615fb65d4e3e66592e81a71)
- **work item · unit fy 2026 27 proposed fee · duplicate replacement job card · amount** = 133 USD · as [unit fy 2026 27 proposed fee · duplicate replacement job card](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/duplicate-replacement-job-card) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10804&end=10847) · [sha256:c007f940be7f1aa6…](/hashes/sha256:c007f940be7f1aa61cb90549da2551c64db4356de0e9baa4852619d3c70c7dc2)
- **work item · unit fy 2026 27 proposed fee · duplicate replacement job card · basis** = Each · as [unit fy 2026 27 proposed fee · duplicate replacement job card](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/duplicate-replacement-job-card) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10804&end=10847) · [sha256:fed3a2d4e8964c9d…](/hashes/sha256:fed3a2d4e8964c9d8a1ea5569b757f780d2ed349d2f081b36278dbdbf597f3e5)
- **work item · unit fy 2026 27 proposed fee · electric vehicle charging station · basis** = Each · as [unit fy 2026 27 proposed fee · electric vehicle charging station](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/electric-vehicle-charging-station) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10848&end=10892) · [sha256:6069d31eaaa44623…](/hashes/sha256:6069d31eaaa44623f0bb56b8cb278ac2c7fd75ad5a745112774afc3d145d1bf3)
- **work item · unit fy 2026 27 proposed fee · electric vehicle charging station · amount** = 303 USD · as [unit fy 2026 27 proposed fee · electric vehicle charging station](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/electric-vehicle-charging-station) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10848&end=10892) · [sha256:67f328066b593b29…](/hashes/sha256:67f328066b593b29e1d57e367168792260823fe046367c654c0ea25290d7a329)
- **work item · unit fy 2026 27 proposed fee · extensions plan check applications within 180 days of submittal · rate** = 303 USD · as [unit fy 2026 27 proposed fee · extensions plan check applications within 180 days of submittal](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/extensions-plan-check-applications-within-180-days-of-submittal) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=10904&end=10972) · [sha256:951e2f5ea58b424d…](/hashes/sha256:951e2f5ea58b424d6163bb4bc4dd0ec83af4470036cb7b5300479e3605e8df36)
- **work item · unit fy 2026 27 proposed fee · fence · non masonry over 7 feet in height · amount** = 589 USD · as [fence · non masonry over 7 feet in height](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fence/non-masonry-over-7-feet-in-height) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11381&end=11435) · [sha256:c82f57d468959782…](/hashes/sha256:c82f57d468959782da7199c7e3710869d48166cf3b4606aa42f84d7d0f6d9ef3)
- **work item · unit fy 2026 27 proposed fee · fence · non masonry each additional 100 l f · rate** = 150 USD · as [fence · non masonry each additional 100 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fence/non-masonry-each-additional-100-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11436&end=11492) · [sha256:fdb21ff418703c8d…](/hashes/sha256:fdb21ff418703c8d2589cf98f093927f5ae28f80653c21da05db5ff6efacdf6a)
- **work item · unit fy 2026 27 proposed fee · fence · masonry over 7 feet in height · amount** = 1044 USD · as [fence · masonry over 7 feet in height](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fence/masonry-over-7-feet-in-height) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11493&end=11545) · [sha256:4deeb1c76ddb5f18…](/hashes/sha256:4deeb1c76ddb5f18385f6eaacb4ac210a15f54d60a8692c6e2e75aac4184217c)
- **work item · unit fy 2026 27 proposed fee · fence · masonry each additional 100 l f · rate** = 595 USD · as [fence · masonry each additional 100 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fence/masonry-each-additional-100-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11546&end=11598) · [sha256:a2312e05db4164fd…](/hashes/sha256:a2312e05db4164fd9b1f99a614e5f014a77f9372a1b3553fe53a60f16c09b197)
- **work item · unit fy 2026 27 proposed fee · fireplace · masonry · amount** = 1044 USD · as [fireplace · masonry](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fireplace/masonry) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11609&end=11629) · [sha256:3dc85e960476a172…](/hashes/sha256:3dc85e960476a17279bad712928ce280a9a94e8476b030689e0c18eb97e1befc)
- **work item · unit fy 2026 27 proposed fee · fireplace · masonry · basis** = each · as [fireplace · masonry](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fireplace/masonry) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11609&end=11629) · [sha256:f6ccc86c900d1e81…](/hashes/sha256:f6ccc86c900d1e811128fdcc380538b3d54c7eca015b83b68b40079ae50eabab)
- **work item · unit fy 2026 27 proposed fee · fireplace · pre fabricated metal · amount** = 589 USD · as [fireplace · pre fabricated metal](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fireplace/pre-fabricated-metal) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11630&end=11662) · [sha256:aa54194e15cb6ff2…](/hashes/sha256:aa54194e15cb6ff246768cd1c100cf773d57b93daf888848906eed854bbf4fc3)
- **work item · unit fy 2026 27 proposed fee · fireplace · pre fabricated metal · basis** = each · as [fireplace · pre fabricated metal](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/fireplace/pre-fabricated-metal) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11630&end=11662) · [sha256:b9f0ffac3767f6b0…](/hashes/sha256:b9f0ffac3767f6b0a70806875d1a671a35094dc0d0fad597c4b85d2c80b881fc)
- **work item · unit fy 2026 27 proposed fee · flag pole over 20 feet in height · amount** = 589 USD · as [unit fy 2026 27 proposed fee · flag pole over 20 feet in height](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/flag-pole-over-20-feet-in-height) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11663&end=11709) · [sha256:aec42652d792b4fa…](/hashes/sha256:aec42652d792b4faf5c546e6b5b35892a2b196f42379053b03043d80b6d14d3c)
- **work item · unit fy 2026 27 proposed fee · flag pole over 20 feet in height · basis** = each · as [unit fy 2026 27 proposed fee · flag pole over 20 feet in height](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/flag-pole-over-20-feet-in-height) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11663&end=11709) · [sha256:e3ca136ad15f0dc7…](/hashes/sha256:e3ca136ad15f0dc7a9ba0a02026cce9da7916bd0e9954237e0ba01959eb43c56)
- **work item · unit fy 2026 27 proposed fee · foundation repair · amount** = 1342 USD · as [unit fy 2026 27 proposed fee · foundation repair](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/foundation-repair) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11710&end=11740) · [sha256:3b25bfcf8b04f0e5…](/hashes/sha256:3b25bfcf8b04f0e54f2ebafef8ba5e8b16b4f0b65e60849f0dd2f431f2a373f6)
- **work item · unit fy 2026 27 proposed fee · foundation repair · basis** = each · as [unit fy 2026 27 proposed fee · foundation repair](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/foundation-repair) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11710&end=11740) · [sha256:b8896ec9cad884a1…](/hashes/sha256:b8896ec9cad884a1c5a358d812c1a21ab25d2b833faa85b904e2bb54df6b2ee5)
- **work item · unit fy 2026 27 proposed fee · inspections · pre inspection fee · basis** = Per hour · as [inspections · pre inspection fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/pre-inspection-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11753&end=11786) · [sha256:5927715459310095…](/hashes/sha256:59277154593100955e9a164b6f0eba21fb2473c51bf65a53611a18def1e3cc1d)
- **work item · unit fy 2026 27 proposed fee · inspections · pre inspection fee · rate** = 303 USD · as [inspections · pre inspection fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/pre-inspection-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11753&end=11786) · [sha256:fc2cb5c905bfac7d…](/hashes/sha256:fc2cb5c905bfac7dcd8887c78d6b1e78425a2eb640b9b0b31f31d2aab3476f1b)
- **work item · unit fy 2026 27 proposed fee · inspections · standard inspection hourly rate · basis** = Per hour · as [inspections · standard inspection hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/standard-inspection-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11787&end=11833) · [sha256:651f2e580771e7ed…](/hashes/sha256:651f2e580771e7ed0af755fb801fb47d4987add066ce548b808e84fc0a864599)
- **work item · unit fy 2026 27 proposed fee · inspections · standard inspection hourly rate · rate** = 303 USD · as [inspections · standard inspection hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/standard-inspection-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11787&end=11833) · [sha256:fd64d887e5f57c34…](/hashes/sha256:fd64d887e5f57c34739687c132fb4a498a00edac1e3a264ce884480952b30d61)
- **work item · unit fy 2026 27 proposed fee · inspections · progress inspection · rate** = 303 USD · as [inspections · progress inspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/progress-inspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11834&end=11868) · [sha256:41573fbca71d158e…](/hashes/sha256:41573fbca71d158ea4eec5f449f2c625d89f25dae77db83c1b6783fbc929bbe0)
- **work item · unit fy 2026 27 proposed fee · inspections · progress inspection · basis** = Per hour · as [inspections · progress inspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/progress-inspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11834&end=11868) · [sha256:f1ad72adc1a7e42f…](/hashes/sha256:f1ad72adc1a7e42f6adf091d8d67447af3ab9bb7543ea6b2d216bafc14a735b5)
- **work item · unit fy 2026 27 proposed fee · inspections · partial inspection · rate** = 303 USD · as [inspections · partial inspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/partial-inspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11869&end=11902) · [sha256:2768b8722e513572…](/hashes/sha256:2768b8722e5135721a4372a189beccc92d3e28bdd1bfd383cd85ac4e875d00a5)
- **work item · unit fy 2026 27 proposed fee · inspections · partial inspection · basis** = Per hour · as [inspections · partial inspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/partial-inspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11869&end=11902) · [sha256:31ea67673f4bb47f…](/hashes/sha256:31ea67673f4bb47f0ed60623855135b62b3d63773b1c4c71f222328a81ba8023)
- **work item · unit fy 2026 27 proposed fee · inspections · courtesy inspection 2 hour minimum · rate** = 303 USD · as [inspections · courtesy inspection 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/courtesy-inspection-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11903&end=11954) · [sha256:908b5add2962e6c4…](/hashes/sha256:908b5add2962e6c4100adea53a1394dd2826f65ea70b6c4857228c27c7c372ab)
- **work item · unit fy 2026 27 proposed fee · inspections · courtesy inspection 2 hour minimum · basis** = Per hour · as [inspections · courtesy inspection 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/courtesy-inspection-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11903&end=11954) · [sha256:f6d0a0ded10bf563…](/hashes/sha256:f6d0a0ded10bf563d404d8c842cba2f17e8202db6be54ec85fdd4942e83b74f3)
- **work item · unit fy 2026 27 proposed fee · inspections · cancelled inspection w out advance notice · rate** = 303 USD · as [inspections · cancelled inspection w out advance notice](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/cancelled-inspection-w-out-advance-notice) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11955&end=12011) · [sha256:a294462578976778…](/hashes/sha256:a29446257897677874cc7fe20deecc261ace21b8a2dbc1930805764f1852a009)
- **work item · unit fy 2026 27 proposed fee · inspections · cancelled inspection w out advance notice · basis** = Per hour · as [inspections · cancelled inspection w out advance notice](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/cancelled-inspection-w-out-advance-notice) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=11955&end=12011) · [sha256:ce6c76f1dc65489c…](/hashes/sha256:ce6c76f1dc65489c991d31dc336352c110f6c7c70511edaf1900279590d49ccc)
- **work item · unit fy 2026 27 proposed fee · inspections · reinspection · rate** = 303 USD · as [inspections · reinspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/reinspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12012&end=12039) · [sha256:95e151052ab879bb…](/hashes/sha256:95e151052ab879bb74ecbf9a0c707f6661d18b2b897b55b3fa4a2903a5d3ea6c)
- **work item · unit fy 2026 27 proposed fee · inspections · reinspection · basis** = Per hour · as [inspections · reinspection](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/reinspection) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12012&end=12039) · [sha256:d0de990cdb2224e5…](/hashes/sha256:d0de990cdb2224e5143e88b3291bb305548fc6934aafc899115766e21fd08c2c)
- **work item · unit fy 2026 27 proposed fee · inspections · outside of normal business hours 2 hour minimum · rate** = 351 USD · as [inspections · outside of normal business hours 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/outside-of-normal-business-hours-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12040&end=12104) · [sha256:2f663ded8cc182b7…](/hashes/sha256:2f663ded8cc182b734a4c8bd3fc1184012d047d078a8c44128c835cc4c2c1e12)
- **work item · unit fy 2026 27 proposed fee · inspections · outside of normal business hours 2 hour minimum · basis** = Per hour · as [inspections · outside of normal business hours 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/outside-of-normal-business-hours-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12040&end=12104) · [sha256:a0ba4ed0bf1bd869…](/hashes/sha256:a0ba4ed0bf1bd869fe8f47d8503fc0363c3d0754ed5780a3bc05ecb2b21cd2f5)
- **work item · unit fy 2026 27 proposed fee · inspections · first 1 2 hour minimum · minimum** = 150 USD · as [inspections · first 1 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/first-1-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12166&end=12209) · [sha256:8d381ae0c90eaff8…](/hashes/sha256:8d381ae0c90eaff82786dc17c8ba3bc279d31011fb6e830782cacad610b1d956)
- **work item · unit fy 2026 27 proposed fee · inspections · each additional hour · rate** = 297 USD · as [inspections · each additional hour](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/each-additional-hour) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12210&end=12245) · [sha256:7e94e33999aafd83…](/hashes/sha256:7e94e33999aafd83d3cb058a4b8ef132f79c26362d94df16e5be3741df90b7ea)
- **work item · unit fy 2026 27 proposed fee · inspections · each additional hour · basis** = Per hour · as [inspections · each additional hour](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/inspections/each-additional-hour) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12210&end=12245) · [sha256:bba0ca6eb1b0453b…](/hashes/sha256:bba0ca6eb1b0453b0f8f0dd7fd5576a7ed31ee6e52a735f0f7f24d93808fc801)
- **work item · unit fy 2026 27 proposed fee · lighting pole · amount** = 746 USD · as [unit fy 2026 27 proposed fee · lighting pole](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/lighting-pole) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12246&end=12270) · [sha256:acb5bc4680d5babe…](/hashes/sha256:acb5bc4680d5babefff8f1cd501dee684373430fa59a2caac10713f3ef147745)
- **work item · unit fy 2026 27 proposed fee · lighting pole · basis** = Each · as [unit fy 2026 27 proposed fee · lighting pole](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/lighting-pole) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12246&end=12270) · [sha256:c2b309cfbab04d01…](/hashes/sha256:c2b309cfbab04d017155a392cc2ffa3e62c7fe909db1478f5d8ee2400dd0c59f)
- **work item · unit fy 2026 27 proposed fee · each additional pole · rate** = 306 USD · as [unit fy 2026 27 proposed fee · each additional pole](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/each-additional-pole) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12271&end=12302) · [sha256:88c32b47aed50143…](/hashes/sha256:88c32b47aed501434a6008bada178d9c6d3a8eed45ef88d28ad62f0d0d7acb8a)
- **work item · unit fy 2026 27 proposed fee · each additional pole · basis** = Each · as [unit fy 2026 27 proposed fee · each additional pole](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/each-additional-pole) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12271&end=12302) · [sha256:ecd44ac427a945fa…](/hashes/sha256:ecd44ac427a945fa66a0fb1257345dfcdac99adf0505f389d73b782e01522447)
- **work item · unit fy 2026 27 proposed fee · modular structures · amount** = 1062 USD · as [unit fy 2026 27 proposed fee · modular structures](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/modular-structures) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12303&end=12334) · [sha256:143de586ff1c1b03…](/hashes/sha256:143de586ff1c1b03c09140a04adf75c844c5a8ed02811800a93b55d406614556)
- **work item · unit fy 2026 27 proposed fee · modular structures · basis** = Each · as [unit fy 2026 27 proposed fee · modular structures](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/modular-structures) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12303&end=12334) · [sha256:f57bd58df90e39ab…](/hashes/sha256:f57bd58df90e39abb6d425c58d28ee0fc5484bf77f993c432d9a4dc2d1924b72)
- **work item · unit fy 2026 27 proposed fee · modification of technical code · amount** = 303 USD · as [unit fy 2026 27 proposed fee · modification of technical code](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/modification-of-technical-code) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12335&end=12378) · [sha256:b02002cb5e1df7ca…](/hashes/sha256:b02002cb5e1df7cad1af9ada283184e72926b3e25b76b690640d48083113c07f)
- **work item · unit fy 2026 27 proposed fee · occupancy · certificate of occupancy completion · basis** = Each · as [occupancy · certificate of occupancy completion](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/occupancy/certificate-of-occupancy-completion) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12389&end=12436) · [sha256:25eba261b112a6bb…](/hashes/sha256:25eba261b112a6bb731490fdbfe844d5b4ab61a8ce43444207e853ee1fdb9e82)
- **work item · unit fy 2026 27 proposed fee · occupancy · certificate of occupancy completion · amount** = 589 USD · as [occupancy · certificate of occupancy completion](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/occupancy/certificate-of-occupancy-completion) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12389&end=12436) · [sha256:a1b2bc4a87214d7f…](/hashes/sha256:a1b2bc4a87214d7ff358ef06922865ee90e188b0b77c6e4594be5752cf7dc6c4)
- **work item · unit fy 2026 27 proposed fee · occupancy · temporary occupancy permit · basis** = Per six months · as [occupancy · temporary occupancy permit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/occupancy/temporary-occupancy-permit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12437&end=12484) · [sha256:0efa67b527848838…](/hashes/sha256:0efa67b52784883877d018f31797d487d4ced7455d0e683e1b95f5ee7d3f108f)
- **work item · unit fy 2026 27 proposed fee · occupancy · temporary occupancy permit · rate** = 589 USD · as [occupancy · temporary occupancy permit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/occupancy/temporary-occupancy-permit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12437&end=12484) · [sha256:3e97eb37dad007c7…](/hashes/sha256:3e97eb37dad007c7ba61f4122c757e47a4c9d0e6a5db510735c7fe5ebd9d71ae)
- **work item · unit fy 2026 27 proposed fee · partition commercial interior up to 30 l f · amount** = 895 USD · as [unit fy 2026 27 proposed fee · partition commercial interior up to 30 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/partition-commercial-interior-up-to-30-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12485&end=12553) · [sha256:83a5bdfae6efdcac…](/hashes/sha256:83a5bdfae6efdcac6d01463502e191c40e323d8c6347e8107f39a573974abe47)
- **work item · unit fy 2026 27 proposed fee · additional partition · commercial · rate** = 297 USD · as [additional partition · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/additional-partition/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12554&end=12592) · [sha256:1259f04cb8d1248e…](/hashes/sha256:1259f04cb8d1248e4f3dc59bf0ed74189ac057196174e3505b08775252a6f15f)
- **work item · unit fy 2026 27 proposed fee · partition residential interior up to 30 l f · amount** = 589 USD · as [unit fy 2026 27 proposed fee · partition residential interior up to 30 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/partition-residential-interior-up-to-30-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12593&end=12662) · [sha256:430a074c70c5fe37…](/hashes/sha256:430a074c70c5fe370632e2c759823e8748629c23f6dcdbcf777743168e5535d1)
- **work item · unit fy 2026 27 proposed fee · additional partition · residential · rate** = 297 USD · as [additional partition · residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/additional-partition/residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12663&end=12701) · [sha256:2f0b0e4598d6749a…](/hashes/sha256:2f0b0e4598d6749abf8ad068ddddd4b47e5aee27c491d6cddf544f378ed87616)
- **work item · unit fy 2026 27 proposed fee · patio cover gazebo · wood frame · amount** = 1062 USD · as [patio cover gazebo · wood frame](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/patio-cover-gazebo/wood-frame) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12873&end=12904) · [sha256:55727bb047a3e625…](/hashes/sha256:55727bb047a3e625123c06266debfa744ffcf41ebdbbbaaf2bd11c67057a516d)
- **work item · unit fy 2026 27 proposed fee · patio cover gazebo · metal frame · amount** = 1062 USD · as [patio cover gazebo · metal frame](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/patio-cover-gazebo/metal-frame) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12905&end=12937) · [sha256:4e5b8b7dad48a886…](/hashes/sha256:4e5b8b7dad48a8860581a8d6172e8733a92cadd4cfbc86fc874b5a6ab1458703)
- **work item · unit fy 2026 27 proposed fee · patio cover gazebo · other frame · amount** = 1062 USD · as [patio cover gazebo · other frame](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/patio-cover-gazebo/other-frame) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12938&end=12970) · [sha256:732c729ca1818209…](/hashes/sha256:732c729ca181820914ad11db98e4e015b8f9c180f18f22eafb47ccf357097b62)
- **work item · unit fy 2026 27 proposed fee · patio cover gazebo · additional patio · rate** = 456 USD · as [patio cover gazebo · additional patio](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/patio-cover-gazebo/additional-patio) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=12971&end=13005) · [sha256:afad9777d19f1b80…](/hashes/sha256:afad9777d19f1b804a3db10e9d81264efb85c0916c3aaff6e6ea2fdf647c5e7c)
- **work item · unit fy 2026 27 proposed fee · patio cover gazebo · enclosed prefabricated sun room · amount** = 1044 USD · as [patio cover gazebo · enclosed prefabricated sun room](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/patio-cover-gazebo/enclosed-prefabricated-sun-room) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13006&end=13058) · [sha256:5282d0acd86f90e9…](/hashes/sha256:5282d0acd86f90e983755c19e10d8f46784ebe53008b9ee69ddb961c4a53bd31)
- **work item · unit fy 2026 27 proposed fee · photovoltaic system · multi family and commercial · multi family res commercial each additional 1 kilowatt · rate** = 7 USD · as [multi family and commercial · multi family res commercial each additional 1 kilowatt](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/photovoltaic-system/multi-family-and-commercial/multi-family-res-commercial-each-additional-1-kilowatt) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13241&end=13316) · [sha256:b298ec19d9b48598…](/hashes/sha256:b298ec19d9b4859865f8830bf0d2ffa01c5c229bff2ae9750f3a981358e1a501)
- **work item · unit fy 2026 27 proposed fee · photovoltaic system · multi family and commercial · each additional kw above 250kw · rate** = 5 USD · as [multi family and commercial · each additional kw above 250kw](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/photovoltaic-system/multi-family-and-commercial/each-additional-kw-above-250kw) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13317&end=13364) · [sha256:1cd7c4052f953300…](/hashes/sha256:1cd7c4052f9533006d77b0165152433093e82a1d2d32e752aa48c37c3a4bba42)
- **work item · unit fy 2026 27 proposed fee · photovoltaic system · multi family and commercial · each additional kw above 250kw · basis** = Each addl kW · as [multi family and commercial · each additional kw above 250kw](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/photovoltaic-system/multi-family-and-commercial/each-additional-kw-above-250kw) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13317&end=13364) · [sha256:fdc72b80c195f644…](/hashes/sha256:fdc72b80c195f6444ab93e75100d3d1338d9470b69da22584bf2a4100f4a5124)
- **work item · unit fy 2026 27 proposed fee · thermal system · multi family and commercial · each additional kw between 30kw and 260kw · rate** = 7 USD · as [multi family and commercial · each additional kw between 30kw and 260kw](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/thermal-system/multi-family-and-commercial/each-additional-kw-between-30kw-and-260kw) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13532&end=13590) · [sha256:96fef38a93e1855f…](/hashes/sha256:96fef38a93e1855fc61abf8b27a48c86f0ce85820808b67c5395f4492d183492)
- **work item · unit fy 2026 27 proposed fee · thermal system · multi family and commercial · each additional kw between 30kw and 260kw · basis** = Each addl kW · as [multi family and commercial · each additional kw between 30kw and 260kw](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/thermal-system/multi-family-and-commercial/each-additional-kw-between-30kw-and-260kw) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13532&end=13590) · [sha256:b11f9a046a984a2b…](/hashes/sha256:b11f9a046a984a2be0b3a3db28ad429924bdfb5163aedc50b42c3465d9279948)
- **work item · unit fy 2026 27 proposed fee · thermal system · multi family and commercial · each additional kw above 260kw · basis** = Each addl kW · as [multi family and commercial · each additional kw above 260kw](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/thermal-system/multi-family-and-commercial/each-additional-kw-above-260kw) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13591&end=13638) · [sha256:7623e26ab15a8c18…](/hashes/sha256:7623e26ab15a8c18962139c0832e4bc3d3174748c8fa00fe60bcdb763f83d448)
- **work item · unit fy 2026 27 proposed fee · thermal system · multi family and commercial · each additional kw above 260kw · rate** = 5 USD · as [multi family and commercial · each additional kw above 260kw](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/thermal-system/multi-family-and-commercial/each-additional-kw-above-260kw) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13591&end=13638) · [sha256:7bdef5ad657224cd…](/hashes/sha256:7bdef5ad657224cd730c2808ba74579a059be4cd79d683adbfa51e2b2834ffea)
- **work item · unit fy 2026 27 proposed fee · pile foundation · cast in place concrete first 10 piles · amount** = 1360 USD · as [pile foundation · cast in place concrete first 10 piles](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/pile-foundation/cast-in-place-concrete-first-10-piles) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13655&end=13712) · [sha256:c4ddf393bbf97733…](/hashes/sha256:c4ddf393bbf97733b0228ffda3cef5b92dba752ff1e3a04be063cdf671e0df39)
- **work item · unit fy 2026 27 proposed fee · pile foundation · additional piles increments of 10 · rate** = 912 USD · as [pile foundation · additional piles increments of 10](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/pile-foundation/additional-piles-increments-of-10) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13713&end=13763) · [sha256:3ecfe79b010f9e45…](/hashes/sha256:3ecfe79b010f9e45c65a5bdc3a29ded6e68492534419862847b315a1928ec7be) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:f5c10e9d0926f80960fa367fa026666a0683e8136b3e5a100e821393c5b5c740)
- **work item · unit fy 2026 27 proposed fee · pile foundation · driven steel pre stressed concrete · amount** = 1360 USD · as [pile foundation · driven steel pre stressed concrete](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/pile-foundation/driven-steel-pre-stressed-concrete) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13764&end=13819) · [sha256:f8155cde3528f887…](/hashes/sha256:f8155cde3528f8874dc20d2624c3e610c0620c8b1c4e4223681b473875c4ff63)
- **work item · unit fy 2026 27 proposed fee · product review · rate** = 291 USD · as [unit fy 2026 27 proposed fee · product review](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/product-review) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13871&end=13900) · [sha256:233bacb1891f17ed…](/hashes/sha256:233bacb1891f17edbde1bf6a1cf0bd79e9950766f142e70e5bcef21d3e63b465)
- **work item · unit fy 2026 27 proposed fee · product review · basis** = Per hour · as [unit fy 2026 27 proposed fee · product review](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/product-review) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13871&end=13900) · [sha256:e2ba136ce1ac3e16…](/hashes/sha256:e2ba136ce1ac3e1629efa456001fe299b4b4dda5e1099575b2363768f24f2303)
- **work item · unit fy 2026 27 proposed fee · plan review · standard plan review hourly rate · basis** = Per hour · as [plan review · standard plan review hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-review/standard-plan-review-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13913&end=13960) · [sha256:ce74243a5f3cdbb5…](/hashes/sha256:ce74243a5f3cdbb5d3c70e344de34261554d5ac75d536d8559a2157b9b73394e)
- **work item · unit fy 2026 27 proposed fee · plan review · standard plan review hourly rate · rate** = 316 USD · as [plan review · standard plan review hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-review/standard-plan-review-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13913&end=13960) · [sha256:e4c6cd564a71b80c…](/hashes/sha256:e4c6cd564a71b80cf24bde9d1ce3e7982fd79521eab3718c92773cb49cdc65b2)
- **work item · unit fy 2026 27 proposed fee · plan review · overtime plan review 2 hour minimum · basis** = Per hour · as [plan review · overtime plan review 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-review/overtime-plan-review-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13961&end=14014) · [sha256:93f385c95d5bc025…](/hashes/sha256:93f385c95d5bc0254a1aebfbf013f3cb15e417cd8ad37d2e04191ca69540c700)
- **work item · unit fy 2026 27 proposed fee · plan review · overtime plan review 2 hour minimum · rate** = 370 USD · as [plan review · overtime plan review 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-review/overtime-plan-review-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=13961&end=14014) · [sha256:eb06ca3871a7bb82…](/hashes/sha256:eb06ca3871a7bb8266398bd6a6aaaec9b0d8c43f64a26dc15264d5de442badbf)
- **work item · unit fy 2026 27 proposed fee · plan review · pre submittal plan review 2 hour minimum · basis** = Per hour · as [plan review · pre submittal plan review 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-review/pre-submittal-plan-review-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14015&end=14073) · [sha256:9ffb5a1e46b57b5c…](/hashes/sha256:9ffb5a1e46b57b5cf87161b0e00a9431060f8839c649fefda7346aeaf28c9b18)
- **work item · unit fy 2026 27 proposed fee · plan review · pre submittal plan review 2 hour minimum · rate** = 316 USD · as [plan review · pre submittal plan review 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-review/pre-submittal-plan-review-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14015&end=14073) · [sha256:fd0a4ebd2843de4b…](/hashes/sha256:fd0a4ebd2843de4b2429b85c5b7db63dc6a70bd0eef5ff93446fa6513c939f2c)
- **work item · unit fy 2026 27 proposed fee · plan review · first 1 2 hour minimum · minimum** = 317 USD · as [plan review · first 1 2 hour minimum](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/plan-review/first-1-2-hour-minimum) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14170&end=14213) · [sha256:789714c56488535d…](/hashes/sha256:789714c56488535d6cb29071ae53f6b551e03d732114664a4d0c3a42bd264a1c)
- **work item · unit fy 2026 27 proposed fee · pre construction meeting · amount** = 513 USD · as [unit fy 2026 27 proposed fee · pre construction meeting](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/pre-construction-meeting) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14214&end=14249) · [sha256:8a8df1ca1c7256b8…](/hashes/sha256:8a8df1ca1c7256b8478625aa5e9306ef441622d35fe54d41b7c15e77a07fd18f)
- **work item · unit fy 2026 27 proposed fee · pre construction meeting · basis** = Each · as [unit fy 2026 27 proposed fee · pre construction meeting](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/pre-construction-meeting) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14214&end=14249) · [sha256:a32e7e85b5194a1f…](/hashes/sha256:a32e7e85b5194a1f6bfd4ea1a3f261e7d891867671e8d0561395a630adf98f9a)
- **work item · unit fy 2026 27 proposed fee · remodel residential · kitchen up to 300 sq ft · basis** = Each · as [remodel residential · kitchen up to 300 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/kitchen-up-to-300-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14423&end=14464) · [sha256:a1ecc4d19ed40344…](/hashes/sha256:a1ecc4d19ed403441892a81bb85b4ea17e40b25bcdd37f62de3a61d0db1428c4)
- **work item · unit fy 2026 27 proposed fee · remodel residential · kitchen up to 300 sq ft · amount** = 1184 USD · as [remodel residential · kitchen up to 300 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/kitchen-up-to-300-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14423&end=14464) · [sha256:ecdbebfad02e383d…](/hashes/sha256:ecdbebfad02e383d233eb94d6e3141816ab7bba59b149a7d5e4f4940a85bbaa6)
- **work item · unit fy 2026 27 proposed fee · remodel residential · bath up to 300 sq ft · basis** = Each · as [remodel residential · bath up to 300 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/bath-up-to-300-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14465&end=14503) · [sha256:33276e186c3ff26e…](/hashes/sha256:33276e186c3ff26eae41354197985a38765a5d23e1d3e595db46044a58ded79e)
- **work item · unit fy 2026 27 proposed fee · remodel residential · bath up to 300 sq ft · amount** = 1184 USD · as [remodel residential · bath up to 300 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/bath-up-to-300-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14465&end=14503) · [sha256:797d3763e7e40f41…](/hashes/sha256:797d3763e7e40f41111c313c8f7d3fb13272fd8a270d546da1eddd620822c1ff)
- **work item · unit fy 2026 27 proposed fee · remodel residential · other remodel up to 300 sq ft · amount** = 1044 USD · as [remodel residential · other remodel up to 300 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/other-remodel-up-to-300-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14504&end=14551) · [sha256:180b1c77f1c85948…](/hashes/sha256:180b1c77f1c859483b54d5e9aa23cdd0b61e022ca6b526019b64c27bfcec1c9e)
- **work item · unit fy 2026 27 proposed fee · remodel residential · other remodel up to 300 sq ft · basis** = Each · as [remodel residential · other remodel up to 300 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/other-remodel-up-to-300-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14504&end=14551) · [sha256:feff36045e5e5d4c…](/hashes/sha256:feff36045e5e5d4c1549cf7ad910d2baaac926c675d468b2afd9e382371c9614)
- **work item · unit fy 2026 27 proposed fee · remodel residential · additional remodel per sq ft above 300 · basis** = Per s.f. · as [remodel residential · additional remodel per sq ft above 300](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/additional-remodel-per-sq-ft-above-300) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14552&end=14610) · [sha256:4287bab76e1cf2b9…](/hashes/sha256:4287bab76e1cf2b91b5307bb04fe1cbc8856c9e7696398f804a54f2c759b2a96)
- **work item · unit fy 2026 27 proposed fee · remodel residential · additional remodel per sq ft above 300 · rate** = 2.6 USD · as [remodel residential · additional remodel per sq ft above 300](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/additional-remodel-per-sq-ft-above-300) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14552&end=14610) · [sha256:5b0dd55d63dacc62…](/hashes/sha256:5b0dd55d63dacc62d3189f39fbeeb966e445a29c05b762d5b09ce1c4f7e8554e)
- **work item · unit fy 2026 27 proposed fee · remodel residential · other remodel 1000 sq ft · basis** = Each · as [remodel residential · other remodel 1000 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/other-remodel-1000-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14611&end=14653) · [sha256:515e4500bfbcfa33…](/hashes/sha256:515e4500bfbcfa33e3dd4caef06b8a87c7ac6aa9a2584c58bc0e95ebe611ec20)
- **work item · unit fy 2026 27 proposed fee · remodel residential · other remodel 1000 sq ft · amount** = 2866 USD · as [remodel residential · other remodel 1000 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/other-remodel-1000-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14611&end=14653) · [sha256:ee8edf1319bf78ef…](/hashes/sha256:ee8edf1319bf78ef447a91d429c30e014dd9ba161362f5fe415b29dfc7f73482)
- **work item · unit fy 2026 27 proposed fee · remodel residential · additional remodel per sq ft above 1000 · rate** = 0.61 USD · as [remodel residential · additional remodel per sq ft above 1000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/additional-remodel-per-sq-ft-above-1000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14654&end=14713) · [sha256:0901f2f7a7f73375…](/hashes/sha256:0901f2f7a7f73375feabbc5c58b3eca81703913bd8eae6c9b9617825b0117acf)
- **work item · unit fy 2026 27 proposed fee · remodel residential · additional remodel per sq ft above 1000 · basis** = Per s.f. · as [remodel residential · additional remodel per sq ft above 1000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/additional-remodel-per-sq-ft-above-1000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14654&end=14713) · [sha256:edefcceb67fc930d…](/hashes/sha256:edefcceb67fc930dbd9e553bd8b00e6a0307e6e0a346ff4360b1b574f395d0ad)
- **work item · unit fy 2026 27 proposed fee · remodel residential · other remodel 2500 sq ft · amount** = 3777 USD · as [remodel residential · other remodel 2500 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/other-remodel-2500-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14714&end=14757) · [sha256:4cb45f6ae9d286aa…](/hashes/sha256:4cb45f6ae9d286aa91a4b37ab10dbb1e854ee39c534e1e286ccc26e558557adc)
- **work item · unit fy 2026 27 proposed fee · remodel residential · other remodel 2500 sq ft · basis** = Each · as [remodel residential · other remodel 2500 sq ft](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/other-remodel-2500-sq-ft) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14714&end=14757) · [sha256:8dab244e458ae027…](/hashes/sha256:8dab244e458ae0278a73069da3d818d53abdc52e7a7c8e4888af6022ef55d79e)
- **work item · unit fy 2026 27 proposed fee · remodel residential · additional remodel per sq ft above 2500 · rate** = 0.3 USD · as [remodel residential · additional remodel per sq ft above 2500](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/additional-remodel-per-sq-ft-above-2500) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14758&end=14817) · [sha256:16c61c680a9f4c65…](/hashes/sha256:16c61c680a9f4c6506fcecc1beb3cc4c0319691e69ca8fd78304c7b1480666f9)
- **work item · unit fy 2026 27 proposed fee · remodel residential · additional remodel per sq ft above 2500 · basis** = Per s.f. · as [remodel residential · additional remodel per sq ft above 2500](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/remodel-residential/additional-remodel-per-sq-ft-above-2500) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14758&end=14817) · [sha256:b333b3e5c19fc05a…](/hashes/sha256:b333b3e5c19fc05a16f02dcf631ad039acc4771980d900260e1b24b9df4fb61a)
- **work item · unit fy 2026 27 proposed fee · re roof · residential · maximum 500 per building · maximum** = 500 USD · as [residential · maximum 500 per building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/re-roof/residential/maximum-500-per-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14826&end=14884) · [sha256:26e6e18ce96f8059…](/hashes/sha256:26e6e18ce96f8059069787b9b733d2f81084871b889020caffe7e437f3124b1a)
- **work item · unit fy 2026 27 proposed fee · re roof · residential · maximum 500 per building · amount** = 28 USD · as [residential · maximum 500 per building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/re-roof/residential/maximum-500-per-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14826&end=14884) · [sha256:36d2054e5ae40afe…](/hashes/sha256:36d2054e5ae40afe033c6443f45dc01727293f6692f12c3f3ebcca646b5f21f5)
- **work item · unit fy 2026 27 proposed fee · re roof · multi family dwelling · maximum 500 per building · amount** = 28 USD · as [multi family dwelling · maximum 500 per building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/re-roof/multi-family-dwelling/maximum-500-per-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14885&end=14953) · [sha256:50a1a9bfcda5486f…](/hashes/sha256:50a1a9bfcda5486f2805f651a0fe83e4de13fbef8ca8a89dff58bb55ffa61a19)
- **work item · unit fy 2026 27 proposed fee · re roof · multi family dwelling · maximum 500 per building · maximum** = 500 USD · as [multi family dwelling · maximum 500 per building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/re-roof/multi-family-dwelling/maximum-500-per-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14885&end=14953) · [sha256:f4a32a2beeeb6b27…](/hashes/sha256:f4a32a2beeeb6b279395d6e4c9bb8450603290b94c975196da4a1d123a57263c)
- **work item · unit fy 2026 27 proposed fee · commercial · commercial first 5 000 sf · basis** = Each · as [commercial · commercial first 5 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/commercial/commercial-first-5-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14965&end=15004) · [sha256:73dcd6635542cbf1…](/hashes/sha256:73dcd6635542cbf1de5fee0d85f7e5932104e1a19c2337f8a849e3d09cfc9492)
- **work item · unit fy 2026 27 proposed fee · commercial · commercial first 5 000 sf · amount** = 728 USD · as [commercial · commercial first 5 000 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/commercial/commercial-first-5-000-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=14965&end=15004) · [sha256:f76a5c6e37344096…](/hashes/sha256:f76a5c6e373440964c4731773669c685c6fb71ec3dc9991bd4394fc85e7a9778)
- **work item · unit fy 2026 27 proposed fee · commercial · commercial each additional 2 500 sf · amount** = 297 USD · as [commercial · commercial each additional 2 500 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/commercial/commercial-each-additional-2-500-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15005&end=15063) · [sha256:9af76325181fcb27…](/hashes/sha256:9af76325181fcb27ec60731b85f7243b35976c361e04d7adf0edf32edfa124ea)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · standard up to 50 l f · amount** = 1360 USD · as [retaining wall concrete or masonry · standard up to 50 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/standard-up-to-50-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15101&end=15147) · [sha256:825cfe567d8fd473…](/hashes/sha256:825cfe567d8fd473f85987d0d498157853a384b8dc0dcf06b7d6219766924da1)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · additional retaining wall · amount** = 912 USD · as [retaining wall concrete or masonry · additional retaining wall](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/additional-retaining-wall) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15148&end=15191) · [sha256:14902cf542cc5c5b…](/hashes/sha256:14902cf542cc5c5bedd958d9b017ba6b084853315362cc80f8a0d64aa626161d)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · special design 3 10 high up to 50 l f · amount** = 1974 USD · as [retaining wall concrete or masonry · special design 3 10 high up to 50 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/special-design-3-10-high-up-to-50-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15192&end=15256) · [sha256:7a3862d524bc513f…](/hashes/sha256:7a3862d524bc513fc62c8b210de0fbeca52e85f97cbd4d67ea066381289992c3)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · additional retaining wall · special design 3 10 high · amount** = 1209 USD · as [additional retaining wall · special design 3 10 high](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/additional-retaining-wall/special-design-3-10-high) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15257&end=15302) · [sha256:65d88e7d9c007e1b…](/hashes/sha256:65d88e7d9c007e1b9b0beae291bfd4e47afc649b6fcc85e7b6a16d6903db627a)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · special design over 10 high up to 50 l f · amount** = 2271 USD · as [retaining wall concrete or masonry · special design over 10 high up to 50 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/special-design-over-10-high-up-to-50-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15303&end=15369) · [sha256:6527eab70cc95d2b…](/hashes/sha256:6527eab70cc95d2b57ff80749b59a0b24c7c267ba370ec778701256001e1666e)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · additional retaining wall · special design over 10 high · amount** = 1506 USD · as [additional retaining wall · special design over 10 high](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/additional-retaining-wall/special-design-over-10-high) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15370&end=15415) · [sha256:d19fa97290275a74…](/hashes/sha256:d19fa97290275a7468ef9d9e8ac6ebb0829e687efaaa9b6636d7adf6d0460f71)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · gravity crib wall 0 10 high up to 50 l f · amount** = 1974 USD · as [retaining wall concrete or masonry · gravity crib wall 0 10 high up to 50 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/gravity-crib-wall-0-10-high-up-to-50-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15416&end=15483) · [sha256:1a13d0d84ce00513…](/hashes/sha256:1a13d0d84ce00513885f86a7f87d9127a29579ab2bf1aa4b17b33fc01b917883)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · additional gravity crib wall · gravity crib wall 0 10 high · amount** = 1209 USD · as [additional gravity crib wall · gravity crib wall 0 10 high](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/additional-gravity-crib-wall/gravity-crib-wall-0-10-high) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15484&end=15533) · [sha256:ddf8fdccf2230d07…](/hashes/sha256:ddf8fdccf2230d075c2c194358569a656276e5aee1906e9635626a1db1ac9ef9)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · gravity crib wall over 10 high up to 50 l f · amount** = 2271 USD · as [retaining wall concrete or masonry · gravity crib wall over 10 high up to 50 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/gravity-crib-wall-over-10-high-up-to-50-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15534&end=15604) · [sha256:55db7474a39148c5…](/hashes/sha256:55db7474a39148c5e6010da592d8b71c40975b0742d93c42a8dae567fa45db14)
- **work item · unit fy 2026 27 proposed fee · retaining wall concrete or masonry · additional gravity crib wall · gravity crib wall over 10 high · amount** = 1506 USD · as [additional gravity crib wall · gravity crib wall over 10 high](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/retaining-wall-concrete-or-masonry/additional-gravity-crib-wall/gravity-crib-wall-over-10-high) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15605&end=15654) · [sha256:6da16472b27ce16b…](/hashes/sha256:6da16472b27ce16b103706a02cbdd238d0f74abead0fa707d29786fbe0e63431)
- **work item · unit fy 2026 27 proposed fee · revisions · amount** = 303 USD · as [unit fy 2026 27 proposed fee · revisions](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/revisions) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15655&end=15670) · [sha256:fe008239ea141bb7…](/hashes/sha256:fe008239ea141bb70f7ac0bd0523d13476e12470d160fff4c1d7b2e3b01f86b9)
- **work item · unit fy 2026 27 proposed fee · sauna steam · basis** = Each · as [unit fy 2026 27 proposed fee · sauna steam](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/sauna-steam) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15671&end=15698) · [sha256:4237eb4f576600ec…](/hashes/sha256:4237eb4f576600ecb879edd6da22111b03339cf292f952006525d236708197c8)
- **work item · unit fy 2026 27 proposed fee · sauna steam · amount** = 1044 USD · as [unit fy 2026 27 proposed fee · sauna steam](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/sauna-steam) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15671&end=15698) · [sha256:6bffbafdcb44f452…](/hashes/sha256:6bffbafdcb44f452c579eb4c39c4fa5a8708a4e5e374ea9deb79591b005be8cb)
- **work item · unit fy 2026 27 proposed fee · siding · stone and brick veneer interior or exterior · amount** = 728 USD · as [siding · stone and brick veneer interior or exterior](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/siding/stone-and-brick-veneer-interior-or-exterior) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15706&end=15771) · [sha256:fb34d535d2034ffb…](/hashes/sha256:fb34d535d2034ffb2f767615fd2fd3755649764c132e09cafb195675c4fff30e)
- **work item · unit fy 2026 27 proposed fee · siding · all other · amount** = 578 USD · as [siding · all other](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/siding/all-other) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15772&end=15800) · [sha256:750e526fc18fa47e…](/hashes/sha256:750e526fc18fa47e0bdc9f2c46a8539983597fe55b46c74468ce458e55d91a08)
- **work item · unit fy 2026 27 proposed fee · siding · additional siding · amount** = 150 USD · as [siding · additional siding](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/siding/additional-siding) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15801&end=15836) · [sha256:4436e008befe386c…](/hashes/sha256:4436e008befe386cda75e014d6911e22ac75f33e241437a770c93416825a9adc)
- **work item · unit fy 2026 27 proposed fee · signs · directional · amount** = 589 USD · as [signs · directional](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/directional) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15993&end=16015) · [sha256:03d0ef4dca493a97…](/hashes/sha256:03d0ef4dca493a9787f1f844c5a5973abe37b11f745d160d9cf81fa9df85c0bc)
- **work item · unit fy 2026 27 proposed fee · signs · directional · basis** = Each · as [signs · directional](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/directional) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=15993&end=16015) · [sha256:f9e8f727fc8f8c41…](/hashes/sha256:f9e8f727fc8f8c41248ceb85fa02fff2204bf1fa89bc8fbe8b3619ef6a20cbd5)
- **work item · unit fy 2026 27 proposed fee · signs · each additional directional sign · basis** = Each · as [signs · each additional directional sign](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/each-additional-directional-sign) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16016&end=16059) · [sha256:24850701ea6222fd…](/hashes/sha256:24850701ea6222fdc577ea462a4d80d90e8ad59c3c8bfaaa5ad25eb6db3cc2fa)
- **work item · unit fy 2026 27 proposed fee · signs · each additional directional sign · amount** = 306 USD · as [signs · each additional directional sign](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/each-additional-directional-sign) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16016&end=16059) · [sha256:c8991fab3577e979…](/hashes/sha256:c8991fab3577e9796585a44370dbf8f0db235bbfe69f54ccc32eb373f78cf96e)
- **work item · unit fy 2026 27 proposed fee · signs · ground roof projecting signs · amount** = 589 USD · as [signs · ground roof projecting signs](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/ground-roof-projecting-signs) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16060&end=16101) · [sha256:23fec4569d747b82…](/hashes/sha256:23fec4569d747b8249de6a4af199e781ad7dd4eccac1b69868b3942e34ff95d4)
- **work item · unit fy 2026 27 proposed fee · signs · ground roof projecting signs · basis** = Each · as [signs · ground roof projecting signs](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/ground-roof-projecting-signs) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16060&end=16101) · [sha256:a7fe2768c36c7d87…](/hashes/sha256:a7fe2768c36c7d874b39f194a9f974e7021cd5b9c3b0b53733bebaad3ade36c4)
- **work item · unit fy 2026 27 proposed fee · signs · master plan sign check · basis** = Each · as [signs · master plan sign check](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/master-plan-sign-check) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16102&end=16135) · [sha256:14e619fc07538071…](/hashes/sha256:14e619fc07538071ba9efe780c714408f378055698b99b11ac698f6e8ea1031d)
- **work item · unit fy 2026 27 proposed fee · signs · master plan sign check · amount** = 589 USD · as [signs · master plan sign check](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/master-plan-sign-check) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16102&end=16135) · [sha256:f0d494eb9fc4ca8b…](/hashes/sha256:f0d494eb9fc4ca8bdc822f188d4978baece6a854483753274e7d77dfcec40ac2)
- **work item · unit fy 2026 27 proposed fee · signs · rework of any existing ground sign · amount** = 589 USD · as [signs · rework of any existing ground sign](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/rework-of-any-existing-ground-sign) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16136&end=16181) · [sha256:01088398c13f1b0b…](/hashes/sha256:01088398c13f1b0bd9cca96a9231055f90fdd3f70d3a14d13011b1d981868308)
- **work item · unit fy 2026 27 proposed fee · signs · rework of any existing ground sign · basis** = Each · as [signs · rework of any existing ground sign](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/rework-of-any-existing-ground-sign) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16136&end=16181) · [sha256:b097badecef2b602…](/hashes/sha256:b097badecef2b6025562fba2c330f40317d44e6fbbcac84be535f9d2e112296b)
- **work item · unit fy 2026 27 proposed fee · signs · other sign · amount** = 589 USD · as [signs · other sign](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/other-sign) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16182&end=16203) · [sha256:a7d07c0b65158c4b…](/hashes/sha256:a7d07c0b65158c4b9616570fcd6fefa19edc02682a28081318cf9606128a5fdb)
- **work item · unit fy 2026 27 proposed fee · signs · other sign · basis** = Each · as [signs · other sign](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/other-sign) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16182&end=16203) · [sha256:cf6f789cbbca3fed…](/hashes/sha256:cf6f789cbbca3fedd9313bc5697138c04b884c2be38ada96ee4cd45dfff0baa9)
- **work item · unit fy 2026 27 proposed fee · reinspection fee · amount** = 141 USD · as [unit fy 2026 27 proposed fee · reinspection fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/reinspection-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16204&end=16231) · [sha256:3f6a26e7593d2a94…](/hashes/sha256:3f6a26e7593d2a94c44db479dc01682bb7f7b04a606d6e3dd551424290dd65b3)
- **work item · unit fy 2026 27 proposed fee · reinspection fee · basis** = Each · as [unit fy 2026 27 proposed fee · reinspection fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/reinspection-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16204&end=16231) · [sha256:e0eaeec3b4cb7c51…](/hashes/sha256:e0eaeec3b4cb7c518f232bf285487d02ce50ee8b0985457051606a40542c0fcd)
- **work item · unit fy 2026 27 proposed fee · signs · wall awning sign non electric · amount** = 439 USD · as [signs · wall awning sign non electric](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/wall-awning-sign-non-electric) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16232&end=16273) · [sha256:196d770ef1c061b6…](/hashes/sha256:196d770ef1c061b6f44afc5e271baea7e6a88d40f292ab0ad401317be2502e83)
- **work item · unit fy 2026 27 proposed fee · signs · wall awning sign non electric · basis** = Each · as [signs · wall awning sign non electric](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/wall-awning-sign-non-electric) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16232&end=16273) · [sha256:b47faa1b413db8f4…](/hashes/sha256:b47faa1b413db8f4597f3c6b6bc8223e621a891f6827a70f1ecbe5ea0d740713)
- **work item · unit fy 2026 27 proposed fee · signs · wall awning sign electric · basis** = Each · as [signs · wall awning sign electric](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/wall-awning-sign-electric) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16274&end=16311) · [sha256:935b7f7b0f2f367e…](/hashes/sha256:935b7f7b0f2f367eb83604e200a07a6f4c852baff08f3aa40518ca5d65463e6d)
- **work item · unit fy 2026 27 proposed fee · signs · wall awning sign electric · amount** = 589 USD · as [signs · wall awning sign electric](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/signs/wall-awning-sign-electric) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16274&end=16311) · [sha256:d131fadd89c0531c…](/hashes/sha256:d131fadd89c0531c5ece0192e98d9d95534a5cab6c5b3c42deba96f83393239f)
- **work item · unit fy 2026 27 proposed fee · skylight · 50 sf or less cumulative area · basis** = Each · as [skylight · 50 sf or less cumulative area](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/skylight/50-sf-or-less-cumulative-area) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16321&end=16364) · [sha256:3feaf6e82d922945…](/hashes/sha256:3feaf6e82d92294562f21e5e369ce4603f6b074fe1da168d9446c5d0d1c45305)
- **work item · unit fy 2026 27 proposed fee · skylight · 50 sf or less cumulative area · amount** = 589 USD · as [skylight · 50 sf or less cumulative area](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/skylight/50-sf-or-less-cumulative-area) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16321&end=16364) · [sha256:b37bf14fef23ba78…](/hashes/sha256:b37bf14fef23ba78bfc9a81258afe5479021092280e77d31abcc3c6d159e6b83)
- **work item · unit fy 2026 27 proposed fee · skylight · greater than 50 sf or structural · basis** = Each · as [skylight · greater than 50 sf or structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/skylight/greater-than-50-sf-or-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16365&end=16408) · [sha256:22ae960df1ff829c…](/hashes/sha256:22ae960df1ff829cd8218b91b2506a5e671d0c954c0384ef86588e4b8bb752df)
- **work item · unit fy 2026 27 proposed fee · skylight · greater than 50 sf or structural · amount** = 306 USD · as [skylight · greater than 50 sf or structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/skylight/greater-than-50-sf-or-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16365&end=16408) · [sha256:81e8138ca3577999…](/hashes/sha256:81e8138ca357799900b8223fd4ae3256004d534bfcded6954495ef86e93272bb)
- **work item · unit fy 2026 27 proposed fee · stairs first flight · basis** = First flight · as [unit fy 2026 27 proposed fee · stairs first flight](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/stairs-first-flight) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16409&end=16450) · [sha256:2b79e4131bb7790d…](/hashes/sha256:2b79e4131bb7790d18d15314c42a924a6968ec5a9ef1db44e0d06e5060951b7f)
- **work item · unit fy 2026 27 proposed fee · stairs first flight · amount** = 589 USD · as [unit fy 2026 27 proposed fee · stairs first flight](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/stairs-first-flight) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16409&end=16450) · [sha256:55321a7869f73bbf…](/hashes/sha256:55321a7869f73bbf1870d8e8987ac3a11428732c6b9182b4094e96249d04226e)
- **work item · unit fy 2026 27 proposed fee · each additional flight · amount** = 306 USD · as [unit fy 2026 27 proposed fee · each additional flight](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/each-additional-flight) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16451&end=16490) · [sha256:760fe693c1ec4e0c…](/hashes/sha256:760fe693c1ec4e0ce09a6bec9b72ed151eeda85cf613359988d33f604e53d9ea)
- **work item · unit fy 2026 27 proposed fee · each additional flight · basis** = Per flight · as [unit fy 2026 27 proposed fee · each additional flight](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/each-additional-flight) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16451&end=16490) · [sha256:d6ddf1e477d94068…](/hashes/sha256:d6ddf1e477d9406831162ea3c8ee2dcf07d9588164d8a5caf7b91209ad9969d2)
- **work item · unit fy 2026 27 proposed fee · storage racks · 0 8 high up to 100 l f · first 100 l f · amount** = 746 USD · as [0 8 high up to 100 l f · first 100 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/storage-racks/0-8-high-up-to-100-l-f/first-100-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16505&end=16551) · [sha256:98f182e558168573…](/hashes/sha256:98f182e558168573cc76e745d8b7a9285a9d75a859ac87c30df8726a7e49a599)
- **work item · unit fy 2026 27 proposed fee · storage racks · each additional 100 l f · amount** = 150 USD · as [storage racks · each additional 100 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/storage-racks/each-additional-100-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16552&end=16595) · [sha256:e8e4b6c2a054cdac…](/hashes/sha256:e8e4b6c2a054cdac56a43e6b8b78eb2fb6873e4a18c8dda0896588066424a587)
- **work item · unit fy 2026 27 proposed fee · storage racks · over 8 high up to 100 l f · first 100 l f · amount** = 895 USD · as [over 8 high up to 100 l f · first 100 l f](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/storage-racks/over-8-high-up-to-100-l-f/first-100-l-f) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16596&end=16645) · [sha256:0e72c55ec24d60fe…](/hashes/sha256:0e72c55ec24d60fea17f7690f29c90266a4ad78c9d46785f8ef84df2b8451adb)
- **work item · unit fy 2026 27 proposed fee · storage racks · each additional 100 l f · over 8 high · amount** = 150 USD · as [each additional 100 l f · over 8 high](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/storage-racks/each-additional-100-l-f/over-8-high) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16646&end=16689) · [sha256:f0c425e17e13c2bc…](/hashes/sha256:f0c425e17e13c2bcfcfe2f6ea0ce434490ccc8242757036903ed71d68a0b7060)
- **work item · unit fy 2026 27 proposed fee · stucco applications · base · amount** = 578 USD · as [stucco applications · base](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/stucco-applications/base) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16710&end=16733) · [sha256:8df3d9e0efb11e85…](/hashes/sha256:8df3d9e0efb11e8541d969555fb32abcedc3446e697eb9d5c29577499b055fd3)
- **work item · unit fy 2026 27 proposed fee · stucco applications · additional stucco application · amount** = 150 USD · as [stucco applications · additional stucco application](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/stucco-applications/additional-stucco-application) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16734&end=16781) · [sha256:4587a34c9f153134…](/hashes/sha256:4587a34c9f153134b603cfad8693dcda6ad2f826663fd04708be6b9fa9d022e4)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · vinyl lined · amount** = 1360 USD · as [swimming pool spa · vinyl lined](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/vinyl-lined) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16801&end=16825) · [sha256:227130aca9d3a78c…](/hashes/sha256:227130aca9d3a78c8fdcf13b0062136825e93e111850104401d52e8fa0044fe4)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · vinyl lined · basis** = Each · as [swimming pool spa · vinyl lined](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/vinyl-lined) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16801&end=16825) · [sha256:6e751c43192a6175…](/hashes/sha256:6e751c43192a6175e7954f254a58c3a1063a5c35794f2eed82d561f571c5f3bf)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · fiberglass · amount** = 1360 USD · as [swimming pool spa · fiberglass](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/fiberglass) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16826&end=16849) · [sha256:27b61a6021bfffae…](/hashes/sha256:27b61a6021bfffae8b10b2377bb6c69bef2bd9be3fd1ac70f772d39b500a513e)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · fiberglass · basis** = Each · as [swimming pool spa · fiberglass](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/fiberglass) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16826&end=16849) · [sha256:53489a92587b71ab…](/hashes/sha256:53489a92587b71abfd267815667cb08c28f61f6765b4b5407de0591a81e878d8)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · gunite up to 800 sf · amount** = 1954 USD · as [swimming pool spa · gunite up to 800 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/gunite-up-to-800-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16850&end=16885) · [sha256:0caa746330269206…](/hashes/sha256:0caa746330269206eaa4e6d22e8536b8be7e8db121dd8811dd8ea57c9c62d9d8)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · gunite up to 800 sf · basis** = Each · as [swimming pool spa · gunite up to 800 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/gunite-up-to-800-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16850&end=16885) · [sha256:3647b35afea36021…](/hashes/sha256:3647b35afea36021c30b9285ae999bd326f62127fe0752a54859e9591044171a)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · additional pool over 800 sf · rate** = 456 USD · as [swimming pool spa · additional pool over 800 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/additional-pool-over-800-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16886&end=16933) · [sha256:8931c09be186ad2b…](/hashes/sha256:8931c09be186ad2bbe78cc07ee01f3cf0bcaf703a86aad4eede73558598e6f1b)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · commercial pool up to 800 sf · amount** = 3315 USD · as [swimming pool spa · commercial pool up to 800 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/commercial-pool-up-to-800-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16934&end=16977) · [sha256:1362834fbf8da340…](/hashes/sha256:1362834fbf8da340694753a9994bca492f622a79936cb8f1f3238ed72d6d2ca3)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · commercial pool up to 800 sf · basis** = Each · as [swimming pool spa · commercial pool up to 800 sf](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/commercial-pool-up-to-800-sf) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16934&end=16977) · [sha256:d75f1ac1485a48e9…](/hashes/sha256:d75f1ac1485a48e9c1e2e92152fe0b49e115fb2cda5052f8e42680e3e42fe429)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · additional pool over 800 sf · commercial pool · rate** = 912 USD · as [additional pool over 800 sf · commercial pool](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/additional-pool-over-800-sf/commercial-pool) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=16978&end=17025) · [sha256:3dbeca4b978b4773…](/hashes/sha256:3dbeca4b978b4773445953ccc4942a8877e6c6bc14924a88fee24a1e7ae5506c)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · spa or hot tub pre fabricated · basis** = Each · as [swimming pool spa · spa or hot tub pre fabricated](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/spa-or-hot-tub-pre-fabricated) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17026&end=17068) · [sha256:24cd47b7074c749e…](/hashes/sha256:24cd47b7074c749ed4e16c8bdca78e05b04d67e8bf3697b1e7253dc5e5fc5a9e)
- **work item · unit fy 2026 27 proposed fee · swimming pool spa · spa or hot tub pre fabricated · amount** = 589 USD · as [swimming pool spa · spa or hot tub pre fabricated](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/swimming-pool-spa/spa-or-hot-tub-pre-fabricated) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17026&end=17068) · [sha256:73366463699282c4…](/hashes/sha256:73366463699282c47b0abab1a5ee7ca23dad93d1d52b22e9b5d4b526ad882169)
- **work item · unit fy 2026 27 proposed fee · technology fee · basis** = Per Permit · as [unit fy 2026 27 proposed fee · technology fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/technology-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17069&end=17099) · [sha256:ac885d2ab7b41f3b…](/hashes/sha256:ac885d2ab7b41f3bf6383a9cf6df1265233d961b275faca1847498cfe69a99e0)
- **work item · unit fy 2026 27 proposed fee · technology fee · percent** = 5.8 % · as [unit fy 2026 27 proposed fee · technology fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/technology-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17069&end=17099) · [sha256:d2ee488c360ebc91…](/hashes/sha256:d2ee488c360ebc91444ab2ee2fc0b22fda7a283c00582e677df2acfbc729cde8)
- **work item · unit fy 2026 27 proposed fee · temporary structures · basis** = Each · as [unit fy 2026 27 proposed fee · temporary structures](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/temporary-structures) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17100&end=17131) · [sha256:5dae274a699d8be7…](/hashes/sha256:5dae274a699d8be7ea608d19bb638507860aceb9508d0b08eccee4c2bf8cdbbf)
- **work item · unit fy 2026 27 proposed fee · temporary structures · amount** = 895 USD · as [unit fy 2026 27 proposed fee · temporary structures](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/temporary-structures) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17100&end=17131) · [sha256:93cd2f2c66faaa30…](/hashes/sha256:93cd2f2c66faaa3038c89bab1034577ac272db1f730aeffaa14cf7fe9b78ea6a)
- **work item · unit fy 2026 27 proposed fee · tenant improvement preparation · basis** = Each · as [unit fy 2026 27 proposed fee · tenant improvement preparation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/tenant-improvement-preparation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17132&end=17173) · [sha256:5fc1d9cb70e6d4ca…](/hashes/sha256:5fc1d9cb70e6d4caff1bf2f2abefdaaf9e31d9e41f935b04650798adbeb1b232)
- **work item · unit fy 2026 27 proposed fee · tenant improvement preparation · amount** = 589 USD · as [unit fy 2026 27 proposed fee · tenant improvement preparation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/tenant-improvement-preparation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17132&end=17173) · [sha256:e9b53d5ce4207d43…](/hashes/sha256:e9b53d5ce4207d43341eeadfc332ecf3ce1c85ecec485b42c566f5a536998b33)
- **work item · unit fy 2026 27 proposed fee · window or sliding glass door · replacement first 8 windows · amount** = 431 USD · as [window or sliding glass door · replacement first 8 windows](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/window-or-sliding-glass-door/replacement-first-8-windows) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17203&end=17247) · [sha256:3be44e37e22526f8…](/hashes/sha256:3be44e37e22526f876bb7f46cfa1d5038db8a6ed93166b782404bd820a4681c7)
- **work item · unit fy 2026 27 proposed fee · window or sliding glass door · replacement each additional 8 windows · amount** = 150 USD · as [window or sliding glass door · replacement each additional 8 windows](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/window-or-sliding-glass-door/replacement-each-additional-8-windows) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17248&end=17301) · [sha256:3a82a7e26a1af3cf…](/hashes/sha256:3a82a7e26a1af3cfffc13108f8ca124f466fdcb71c7ceeaf3cbe6a914d2232d0)
- **work item · unit fy 2026 27 proposed fee · window or sliding glass door · new window non structural · basis** = Each · as [window or sliding glass door · new window non structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/window-or-sliding-glass-door/new-window-non-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17302&end=17341) · [sha256:4eaab46791002718…](/hashes/sha256:4eaab467910027187743ce875db8a4b15e3548edd035756d64d08f1db7fc7a7f)
- **work item · unit fy 2026 27 proposed fee · window or sliding glass door · new window non structural · amount** = 369 USD · as [window or sliding glass door · new window non structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/window-or-sliding-glass-door/new-window-non-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17302&end=17341) · [sha256:ca274c80bbc9261c…](/hashes/sha256:ca274c80bbc9261c884cfa7d60b40529155180f81f01d245f26a631520be3f12)
- **work item · unit fy 2026 27 proposed fee · new window structural shear wall masonry · amount** = 521 USD · as [unit fy 2026 27 proposed fee · new window structural shear wall masonry](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/new-window-structural-shear-wall-masonry) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17492&end=17547) · [sha256:157bdae705082812…](/hashes/sha256:157bdae705082812efa4ac311983e3ab6882277a66e8b2d90a4240366d84832b)
- **work item · unit fy 2026 27 proposed fee · new window structural shear wall masonry · basis** = Each · as [unit fy 2026 27 proposed fee · new window structural shear wall masonry](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/new-window-structural-shear-wall-masonry) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17492&end=17547) · [sha256:dc0ed87298fcd376…](/hashes/sha256:dc0ed87298fcd3767b5360370eb38bac72e3ad5b82f8c2796a16abcaa8885d8e)
- **work item · unit fy 2026 27 proposed fee · bay window structural · basis** = Each · as [unit fy 2026 27 proposed fee · bay window structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/bay-window-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17548&end=17583) · [sha256:3029cd30af2838ca…](/hashes/sha256:3029cd30af2838cade771c1c763a777592831ab472461c005b5e3e0130fca505)
- **work item · unit fy 2026 27 proposed fee · bay window structural · amount** = 521 USD · as [unit fy 2026 27 proposed fee · bay window structural](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/work-item/unit-fy-2026-27-proposed-fee/bay-window-structural) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17548&end=17583) · [sha256:8ef2a77fea32df1a…](/hashes/sha256:8ef2a77fea32df1a185faaab03f9d84410769d29873ca8afa424965d7e16e462)
- **refunds plan check fees · 1st review not started within 3 business of submittal · percent** = 100 % · as [refunds plan check fees · 1st review not started within 3 business of submittal](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/refunds-plan-check-fees/1st-review-not-started-within-3-business-of-submittal) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17981&end=18062) · [sha256:1d95c480fb6242f6…](/hashes/sha256:1d95c480fb6242f651d8fdc5964c65780e1df8228cfc8acd28ba3a7e977b1035)
- **refunds plan check fees · 1st review not started within 3 business of submittal · basis** = of Plan Review Fees · as [refunds plan check fees · 1st review not started within 3 business of submittal](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/refunds-plan-check-fees/1st-review-not-started-within-3-business-of-submittal) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=17981&end=18062) · [sha256:65a821566f7c9d5f…](/hashes/sha256:65a821566f7c9d5ffdd6c303a5d02fbd675d0130ab4338f0e754b48aa2ceef2f)
- **refunds building permit fees · no inspections and permit is active not expired · basis** = of permit fees · as [refunds building permit fees · no inspections and permit is active not expired](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/refunds-building-permit-fees/no-inspections-and-permit-is-active-not-expired) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=18170&end=18239) · [sha256:6b7743514515b64b…](/hashes/sha256:6b7743514515b64b3cca35fe9ce7f416f7d8d25968e429d016568d6495778ede)
- **refunds building permit fees · no inspections and permit is active not expired · percent** = 80 % · as [refunds building permit fees · no inspections and permit is active not expired](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-3-miscellaneous-items/refunds-building-permit-fees/no-inspections-and-permit-is-active-not-expired) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=18170&end=18239) · [sha256:da01af3153047ae5…](/hashes/sha256:da01af3153047ae57baf9cc2a28e0c0502160cbdacc786e910b44d8b912269e2)

### schedule d table 1 plan check and inspection fees (225 records)

- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · base cost1 · rate** = 8925 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=905&end=949) · [sha256:0b744b6a7e3029c9…](/hashes/sha256:0b744b6a7e3029c95e9917a2aac83695e9feba7d4e7ebce50e183cd887c24f49)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · base cost1 · amount** = 399 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=905&end=949) · [sha256:473fa13ec15a7a81…](/hashes/sha256:473fa13ec15a7a81de3685c80d28156eaac4686eae41e629b1e8360ba9cda6d9)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · base cost1 · rate** = 12197 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=950&end=998) · [sha256:8f1d6804c30ad421…](/hashes/sha256:8f1d6804c30ad421b747787466b0b025a5a7dec742a3a795fba25f998239800b)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · base cost1 · amount** = 532 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=950&end=998) · [sha256:c7238d58a559397f…](/hashes/sha256:c7238d58a559397fdc43ed6b351423c910327e8c2f563173002520ba733055c6)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · inspection cost · amount** = 12009 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=905&end=949) · [sha256:6848562cb1ebb77c…](/hashes/sha256:6848562cb1ebb77c5004b430a82efa12a557ff1228ad82a4afed5c0f302ae879)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · inspection cost · amount** = 14853 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=950&end=998) · [sha256:43f68cda1a9f949f…](/hashes/sha256:43f68cda1a9f949ff0af707fb1394095d044d4ed4c130b1b4b7589c5ca6f7aaa)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2 · rate** = 56.88 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=905&end=949) · [sha256:ec831336e2f21cbd…](/hashes/sha256:ec831336e2f21cbde0f221f69f3bcd41a76ae86012b7a707fc153dccc8603b8f)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2 · rate** = 68.11 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=905&end=949) · [sha256:ed9164aaf57182cf…](/hashes/sha256:ed9164aaf57182cf7b34f4ae7b3bcc9ddadd1f3a3e4552cf9abd11e4eddee828)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2 · rate** = 127.29 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=950&end=998) · [sha256:5d05f29632c6348b…](/hashes/sha256:5d05f29632c6348ba015f23d5e050ecf24d81797fead15c1406f820566d53745)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2 · rate** = 148.53 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=950&end=998) · [sha256:e7c3015666f90583…](/hashes/sha256:e7c3015666f90583ab0a9dcf446ddc54a2b182eec8d35c1c9547130406458ad4)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · inspection cost · amount** = 8849 USD [inferred] · as [mercantile · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=999&end=1055) · [sha256:537d877211611628…](/hashes/sha256:537d8772116116285f054dab1bed3c4801a74db8c3ea67f703599771dd2bbfef)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · inspection cost · amount** = 11377 USD [inferred] · as [mercantile · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1056&end=1101) · [sha256:fd8a68e6185bb37f…](/hashes/sha256:fd8a68e6185bb37fb69486c45524d311a865e8adb642e5dbd43940984f2a115c)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · inspection cost · amount** = 14537 USD [inferred] · as [mercantile · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1102&end=1147) · [sha256:42198f56996af2a8…](/hashes/sha256:42198f56996af2a861aeedd1b65e12dc7a89aba814adefa381b33e908ac612b9)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · inspection cost · amount** = 19593 USD [inferred] · as [mercantile · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1148&end=1194) · [sha256:f8d17eaa6e443790…](/hashes/sha256:f8d17eaa6e443790c6e04cce85b03aa18507da1ec36b68ff319c36f8b2afa647)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · inspection cost · amount** = 23069 USD [inferred] · as [mercantile · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1195&end=1242) · [sha256:e1e8bf96ce418fa5…](/hashes/sha256:e1e8bf96ce418fa5f85454a8fc998ca6c8c4dd8a273b626c6010bddee450975a)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · inspection cost · amount** = 28758 USD [inferred] · as [mercantile · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1243&end=1292) · [sha256:6edd2b4b2ecfd49d…](/hashes/sha256:6edd2b4b2ecfd49d42356e9fa5779729d4d08b44bc4855cffcf6a2ddeee21a53)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 31.6 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=999&end=1055) · [sha256:54eb315468fcc3b6…](/hashes/sha256:54eb315468fcc3b60b38fa3da58efeb2e6c4aa0e31be3253630a25603746a2f4) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:e5e8e22831bf7adc9a2d69312971e2b2fb04dd50951d96b16723c76f22cb0a25)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 31.02 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=999&end=1055) · [sha256:60ac1e5262175d16…](/hashes/sha256:60ac1e5262175d16ff102fecfe98eaab23b36df50fdc13f43d26432abd7f3dcc)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 32.72 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1056&end=1101) · [sha256:b2b5e7d91314e4ec…](/hashes/sha256:b2b5e7d91314e4ecce4b0b8179a94453e6543d4ebf2eb8dbd3197540f33ccd66)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 25.28 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1102&end=1147) · [sha256:e927b8996673c6c4…](/hashes/sha256:e927b8996673c6c4f28b58747ffded03f06dc46bcbfc01aa533b8e110de93508)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 1.99 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1102&end=1147) · [sha256:f60973650803404b…](/hashes/sha256:f60973650803404bc7facd9da32ecbb25a197de16ff8a49775f348aabc72e27f)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 5.79 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1148&end=1194) · [sha256:5bd67f3f55dc6112…](/hashes/sha256:5bd67f3f55dc611224c0087364625d5e32adef8bd3b6ed70915fe2dab1d53176)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 8.92 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1148&end=1194) · [sha256:785fc2a82ba5a3f8…](/hashes/sha256:785fc2a82ba5a3f8b7e3671484b216b1d7e148e9f1ee6c2e561f39de29dd58a7)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 5.69 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1195&end=1242) · [sha256:20268d84e78163d8…](/hashes/sha256:20268d84e78163d898124afa47e26db37f65ba5ff185f872b3367d802030b228)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 7.54 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1195&end=1242) · [sha256:36bf92a1c93bb845…](/hashes/sha256:36bf92a1c93bb8456d46e2ad9bf1689bc566f31758f93cb9c6a371a2025b0aea)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 13.44 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1243&end=1292) · [sha256:21a6a28a5ba5123f…](/hashes/sha256:21a6a28a5ba5123fbc2068aaba01d88ff7b908418a434164ed588c65fa8b277a)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · cost for each add 100 sq ft 1 2 · rate** = 14.38 USD [inferred] · as [mercantile · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1243&end=1292) · [sha256:aea9a710250fc053…](/hashes/sha256:aea9a710250fc0531e765c9ba197ebcb58ccd7700e60c40d11c40d6b62c8a4c5)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · amount** = 399 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=999&end=1055) · [sha256:c6f621fe2584b974…](/hashes/sha256:c6f621fe2584b974275de3dce6fc0a9d5a45fb61b9b18de61294fc8383021745)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · rate** = 7437 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=999&end=1055) · [sha256:d16a4d9492fd67c7…](/hashes/sha256:d16a4d9492fd67c764b0836e3655a4327142a9f4ee626f6acbb101dae8471445)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · amount** = 798 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1056&end=1101) · [sha256:0c7b4532e97bbfa9…](/hashes/sha256:0c7b4532e97bbfa91bff26ce52be9aad6827cad294e621cef2121a9067bf7c9c) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:40a15f2b86bc9b80050985f59be23f15cc8cc4d166d62ee963fc1bdbe7135937)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · rate** = 9520 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1056&end=1101) · [sha256:a90cf1362005cea6…](/hashes/sha256:a90cf1362005cea681c4958f492cc07037cce1c24de61f6c2e56961e9673f1ce)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · rate** = 12792 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1102&end=1147) · [sha256:dfb65e0d15eae85d…](/hashes/sha256:dfb65e0d15eae85d3fb5acf247c37be8f4bff16c884f07e1a8300d527a820abc) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:f6beaebab2a557307240f024b5f171c33ac0916dda96061ee5fad117e4de4c72)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · amount** = 1196 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1195&end=1242) · [sha256:77c1841c4bf5fcac…](/hashes/sha256:77c1841c4bf5fcac79dff3ee9a5995d67be5b6a8b1093508502c5a9ca46e4d65) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:de19f1e68997819d13a4818b443266f816023faf2eb7c242e882b66a2c26ed81)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · rate** = 18147 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1195&end=1242) · [sha256:9c711089031a5fff…](/hashes/sha256:9c711089031a5ffffab601dff5a44d2b832d1a047d622b845281cf2bf5e041db)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · amount** = 1595 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1243&end=1292) · [sha256:2e28ecc530c4063b…](/hashes/sha256:2e28ecc530c4063b6d51375d15fad19466bc8068c1407dc753fa3fbda19ad69b)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · mercantile · base cost1 · rate** = 25287 USD [inferred] · as [mercantile · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/mercantile/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1243&end=1292) · [sha256:3f7c0661a8f895a7…](/hashes/sha256:3f7c0661a8f895a7647e2d787d0539d7d8fbf2eb583465c181fda28553572c73)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · inspection cost · amount** = 3792 USD [inferred] · as [occupancy tenant improvements · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1293&end=1369) · [sha256:20e50abfe61d7451…](/hashes/sha256:20e50abfe61d7451c7e5a1a52bdb3234998f4dee110ad36d12ddb60921d4bcd4)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · inspection cost · amount** = 4740 USD [inferred] · as [occupancy tenant improvements · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1370&end=1415) · [sha256:a8a2b3b672295c61…](/hashes/sha256:a8a2b3b672295c619aede0a4e8969cc73ca995a8945e97577870b8ca2b813259)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · inspection cost · amount** = 6320 USD [inferred] · as [occupancy tenant improvements · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1416&end=1458) · [sha256:eac966076b39f23f…](/hashes/sha256:eac966076b39f23f1a00bec62d2dd2843a834e1cd066ad8a973ff1e6744c73fb)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · inspection cost · amount** = 8532 USD [inferred] · as [occupancy tenant improvements · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1459&end=1502) · [sha256:9353e097b7ce08eb…](/hashes/sha256:9353e097b7ce08eb1c59d9a16fb931121be0b6d2d5b45c5eb8689f5e220753ef)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · inspection cost · amount** = 10113 USD [inferred] · as [occupancy tenant improvements · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1503&end=1549) · [sha256:8b3d4c5e009ff15e…](/hashes/sha256:8b3d4c5e009ff15e103e1275760c2f61da1e8e1c98bbf360cae1aaae4aa56944)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · inspection cost · amount** = 12325 USD [inferred] · as [occupancy tenant improvements · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1550&end=1598) · [sha256:8c0abeba41a5c08a…](/hashes/sha256:8c0abeba41a5c08a6f919021f7353c6d76e043e070cc123f443c05be2d8802a5)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 79.0 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1293&end=1369) · [sha256:3f2d95165a4a6b5f…](/hashes/sha256:3f2d95165a4a6b5fd8277d9f8c57cdc2134b91c2aec3fe55bea97d584afae460)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 146.11 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1293&end=1369) · [sha256:577ff1026a6755aa…](/hashes/sha256:577ff1026a6755aac4c8b0e8d6fd45b14b33ca33d761383044a95ab7b9c0e9f8)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 119.0 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1370&end=1415) · [sha256:86d070a11af0eece…](/hashes/sha256:86d070a11af0eece30c50517c1a5bd19c9707ca7580c77e35280a7637771f513)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 105.34 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1370&end=1415) · [sha256:bbe01db327c66832…](/hashes/sha256:bbe01db327c66832bf7f114e1c2d3042e0f41c78affdfd012ff48a2837b60f96)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 73.74 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1416&end=1458) · [sha256:d86d0aa1d5e352a6…](/hashes/sha256:d86d0aa1d5e352a620dd65c45672b353ff0a1f18589d596cd6e8b7d3bc068fc7)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 8.86 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1416&end=1458) · [sha256:e6bfb03a2d041ea8…](/hashes/sha256:e6bfb03a2d041ea867ffa1f694968d0b1d80bd92955e29721594232bf9c3af81)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 17.56 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1459&end=1502) · [sha256:857018ff65294f23…](/hashes/sha256:857018ff65294f2361fa7a2cb61da0553fc1c393300d54bbd956f718196be9ac)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 36.36 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1459&end=1502) · [sha256:f1ad2b7c43c99d13…](/hashes/sha256:f1ad2b7c43c99d13edc8a0e26f6135e1efd82477b9ebe989ef17769e475837c6)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 14.75 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1503&end=1549) · [sha256:8830a84bc7e20355…](/hashes/sha256:8830a84bc7e20355c25c195e9cd3583d7d4091ca35e6d5809e7aa6afb6bab34c)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 27.56 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1503&end=1549) · [sha256:cac3b6ced8cca34d…](/hashes/sha256:cac3b6ced8cca34d7f076a377c8d6670bf1bfa46dd8503eff8ffe93e81fc5a93)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 41.08 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1550&end=1598) · [sha256:564c8d1ebbe46ed4…](/hashes/sha256:564c8d1ebbe46ed4af93737d8c37e85166805c59be3374fceeed7b2495e0bdee)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · cost for each add 100 sq ft 1 2 · rate** = 52.14 USD [inferred] · as [occupancy tenant improvements · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1550&end=1598) · [sha256:64e1f0781a1af4b2…](/hashes/sha256:64e1f0781a1af4b2846552c845ec9618de99d468b7fe2c3f5ca33dc1bd9034d9)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · rate** = 4165 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1293&end=1369) · [sha256:a9123ff8320dac90…](/hashes/sha256:a9123ff8320dac907c4d12024a2becfd9a53b6cdb8ecb1e6934ac3675bc86d3b)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · amount** = 266 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1293&end=1369) · [sha256:ef3a1a8dde5e87d8…](/hashes/sha256:ef3a1a8dde5e87d83533cefaca8997104397964f7650611e36926ef726e3a9b7)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · amount** = 532 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1370&end=1415) · [sha256:185f8232c9cb7c76…](/hashes/sha256:185f8232c9cb7c76bd9171bcdf8b59870765d2abcfa732ed7c2fe5bc112ade1f) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:f8dd966ec508b9f71b989638c2a707337f31367b84024bee382c19a93b1a205f)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · rate** = 5652 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1370&end=1415) · [sha256:bb99d7b7a42c32b8…](/hashes/sha256:bb99d7b7a42c32b8e601f8d8a0962dfc5085357470c528b2ad1f5e05cb60f5a0)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · rate** = 7437 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1416&end=1458) · [sha256:65066e62450d961e…](/hashes/sha256:65066e62450d961e78af0653296acb3c8bf6bddf1ec761242534784f9473321e) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:ed4799490929045413611ca9b4ae94dba25c599bd118212dde2d5b5c0fa0c859)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · rate** = 10710 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1503&end=1549) · [sha256:6569f54db342a185…](/hashes/sha256:6569f54db342a185ae13f3664d1e59d0061d581cf9c0846a4770ac2bc776894e)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · amount** = 798 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1503&end=1549) · [sha256:a19ef480f88e3d8b…](/hashes/sha256:a19ef480f88e3d8bcedd2acdc63224b41c2a022a706cd1da3e9077bfa2c1303c) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:dbc398d386e87709fff08fd067968031fcc835d7678855d77a5912c371281644)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · amount** = 1064 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1550&end=1598) · [sha256:5c12c8e8faa03414…](/hashes/sha256:5c12c8e8faa03414ba14dd3b80c7e7a38509461d0b07073ccf65ca683c32eb02)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · occupancy tenant improvements · base cost1 · rate** = 14577 USD [inferred] · as [occupancy tenant improvements · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/occupancy-tenant-improvements/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1550&end=1598) · [sha256:6fdcb44c4eb76af8…](/hashes/sha256:6fdcb44c4eb76af8b579ee36358acea95a9ba9226c87fb64fa998753121630d2)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · rate** = 8627 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1599&end=1677) · [sha256:087acc71140d7466…](/hashes/sha256:087acc71140d7466b8ef7807c2b23fc030346e74e32488c7302797df75160db0)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · amount** = 399 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1599&end=1677) · [sha256:5eb3f71ec596fe80…](/hashes/sha256:5eb3f71ec596fe8001a38f076f087f246acb2c080791a6f4c66275801a60b599)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · amount** = 798 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1678&end=1724) · [sha256:1bf62b9780f427f6…](/hashes/sha256:1bf62b9780f427f68b41aeed9c4ad97bcb8c0cca1c77653bfa2fdc65bc459915) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:8ecdbb477e4ce69173727a44ffbfc42712732d856fd2da7848cde83361ff5a29)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · rate** = 11305 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1678&end=1724) · [sha256:8c2522208a88002a…](/hashes/sha256:8c2522208a88002afd13e34e9cbd1eff123555d9fbf1a2ef5afbd965344be22a)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · rate** = 14875 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1771&end=1817) · [sha256:679488fc15e1eb09…](/hashes/sha256:679488fc15e1eb09cbd1a6cf3cf0169d66a031d9f5acf6ff0203f4eca679bd0f) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:bb4ce83cb880863e2126a59129353d08dd0d876a4bfd15e55df765b679788076)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · amount** = 1196 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1771&end=1817) · [sha256:96554932aec96c03…](/hashes/sha256:96554932aec96c030f4729385fc3fb8e1d860fa66f89408327e886e0cb2fec4e) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:f594697fd1d6c58a448bc2f3ec31310b5371b1d07750c3b581989b27ce7dfb6c)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · rate** = 21122 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1818&end=1865) · [sha256:27d489cd13a2891f…](/hashes/sha256:27d489cd13a2891ff5396169db93e7f0314137480514517e913b48f90d04177b)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · rate** = 29452 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1866&end=1915) · [sha256:017fbbdf625bd8a0…](/hashes/sha256:017fbbdf625bd8a02302517358c231a024bc1d34ddf4d254121f01fc850393ff)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · base cost1 · amount** = 1595 USD [inferred] · as [residential hotels motels · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1866&end=1915) · [sha256:06074c0f7011f19a…](/hashes/sha256:06074c0f7011f19a0b1aba72a2de33f047fad169f854978f355dc55aca3a8918)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 23.7 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1599&end=1677) · [sha256:261ea34fb140c7ab…](/hashes/sha256:261ea34fb140c7ab867587bcbed2a678f0842cb1c7e2a66d453a1b2d47c20f8a)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 25.64 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1599&end=1677) · [sha256:97e9fa448ed7aea1…](/hashes/sha256:97e9fa448ed7aea1a768331aaf98fda0e925ef76474921a1283c593cb0dce020)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 25.28 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1678&end=1724) · [sha256:a0d679da43e1c121…](/hashes/sha256:a0d679da43e1c12167636a061e2fb416d70d5e92faf77c112c780111ac927c7e)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 23.8 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1678&end=1724) · [sha256:c111dbe3b40122f6…](/hashes/sha256:c111dbe3b40122f66984325a830e3cae8ec7ff4f7409c0d5aba4b9031c69fd19)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 20.01 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1725&end=1770) · [sha256:54b82960727b6840…](/hashes/sha256:54b82960727b6840fcbfd05fc58b5e6591deb8dbbb1fb35b6262ec5815d849e3)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 1.33 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1725&end=1770) · [sha256:fc964effd473c5c3…](/hashes/sha256:fc964effd473c5c314d302bc8c2879290a77eceecc87c59436d7d3f341879fc9)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 4.21 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1771&end=1817) · [sha256:a7b03b82149e52dc…](/hashes/sha256:a7b03b82149e52dc6f34481b32e3d4d4c719979d4ac9ee0df5dd09bdf33e6dd3)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 6.94 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1771&end=1817) · [sha256:cf9033def4da874b…](/hashes/sha256:cf9033def4da874b61abf3c2e6d18bc9fd2e86f3288d032eda756cc6cae75135)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 4.42 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1818&end=1865) · [sha256:8dcb50dda450592a…](/hashes/sha256:8dcb50dda450592adacccd3b51911955bbcfbef4fffc5e8870871605e71a1f55)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 5.82 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1818&end=1865) · [sha256:a64c8826797bd89d…](/hashes/sha256:a64c8826797bd89ddd2cc2e3c28e66787fd4dfd19dc03fc142bea225ed9cba1f)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 10.35 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1866&end=1915) · [sha256:74b859c0a56dd2ba…](/hashes/sha256:74b859c0a56dd2ba81948110c5e8480e840fbd4174b425cfe4e34d4792586146)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · cost for each add 100 sq ft 1 2 · rate** = 11.17 USD [inferred] · as [residential hotels motels · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1866&end=1915) · [sha256:d52bde1a29182bcf…](/hashes/sha256:d52bde1a29182bcf963a4b59e828cf2d7f78c0acb5bf74ddf678d6612fc32cbd)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · inspection cost · amount** = 10429 USD [inferred] · as [residential hotels motels · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1599&end=1677) · [sha256:5e76e5ef2c4d77f0…](/hashes/sha256:5e76e5ef2c4d77f09b06f4242a64bde23465f43c911ad10da7c1e26b45d77b0c)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · inspection cost · amount** = 13273 USD [inferred] · as [residential hotels motels · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1678&end=1724) · [sha256:21e639dc4e20af39…](/hashes/sha256:21e639dc4e20af393794f32759d605f80fca5544a51fe8b089a7b389be546cc8)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · inspection cost · amount** = 17065 USD [inferred] · as [residential hotels motels · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1725&end=1770) · [sha256:87626899d435d90e…](/hashes/sha256:87626899d435d90eed693538361251e1fe0926f8c11259b8499331dcdc996e59)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · inspection cost · amount** = 23069 USD [inferred] · as [residential hotels motels · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1771&end=1817) · [sha256:b7d4bda462b9a6d6…](/hashes/sha256:b7d4bda462b9a6d688d6fa66b216cfc04145367e11ca62071fc383afb05d7ff4)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · inspection cost · amount** = 26862 USD [inferred] · as [residential hotels motels · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1818&end=1865) · [sha256:261307b955bf0dfa…](/hashes/sha256:261307b955bf0dfa7aea926e126760c3fdb672e42321703f856c48f7f8475b60)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential hotels motels · inspection cost · amount** = 33498 USD [inferred] · as [residential hotels motels · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-hotels-motels/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1866&end=1915) · [sha256:44a7c159a1cdc024…](/hashes/sha256:44a7c159a1cdc0241936ac7aea4b6f2d2217e49e3fa6a05fe37d75f6a7003645)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · inspection cost · amount** = 8216 USD [inferred] · as [residential apartment building · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1916&end=1994) · [sha256:6e4eccb20fa40535…](/hashes/sha256:6e4eccb20fa40535fed96eacb006d56c637d3723e0b2b36eb3e17aa3c4273028)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · inspection cost · amount** = 10429 USD [inferred] · as [residential apartment building · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1995&end=2039) · [sha256:6d0103be74e02e6b…](/hashes/sha256:6d0103be74e02e6b37b900f25f43b117f66631115b7333d5e9ab0491e29e05d2)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · inspection cost · amount** = 13589 USD [inferred] · as [residential apartment building · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2040&end=2084) · [sha256:a5e7c58d16a86871…](/hashes/sha256:a5e7c58d16a868715ec100c076f39a60d667278e5f1734e82bbb99fef2b0474c)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · inspection cost · amount** = 18329 USD [inferred] · as [residential apartment building · inspection cost](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/inspection-cost) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2085&end=2131) · [sha256:08389af7a00c37f7…](/hashes/sha256:08389af7a00c37f73ef39d898229b2276f53629b81ca7d5a716bfb3de134b5c1)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 73.39 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1916&end=1994) · [sha256:8fbe1d39cd4fe306…](/hashes/sha256:8fbe1d39cd4fe306d1387f4b46cffe9859674d3ea96369bffb7be48e2b19dfc2)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 69.13 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1916&end=1994) · [sha256:bf06635ea3cb1831…](/hashes/sha256:bf06635ea3cb1831f60f5f042bdeb9200db96b64c0a8f8dd0072199e061713a1)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 79.0 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1995&end=2039) · [sha256:57f045a82c65ec16…](/hashes/sha256:57f045a82c65ec166a9ebbd53483d5ba60fde5eed48d47ae480a531f4330b81f)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 66.94 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1995&end=2039) · [sha256:9b233e00d857d79c…](/hashes/sha256:9b233e00d857d79c7dd80cde2e875444e735a83f49d433d0a6a3f2ecd01c67a7)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 3.32 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2040&end=2084) · [sha256:79091dcad697431a…](/hashes/sha256:79091dcad697431a7b9272e08d70e6223c062f9c2f8516a080fb8b865cd5e0e8)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 59.25 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2040&end=2084) · [sha256:db95f09ff60cb4bd…](/hashes/sha256:db95f09ff60cb4bdb44f78aa34fe71bfea37afa6ba095d94a51bd061d83eaad0)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 19.83 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2085&end=2131) · [sha256:01b4a4a0c5c2bb06…](/hashes/sha256:01b4a4a0c5c2bb068481db2b23df90fdc2ff8bd616438df6af6f15ad3414357a)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · cost for each add 100 sq ft 1 2 · rate** = 13.17 USD [inferred] · as [residential apartment building · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2085&end=2131) · [sha256:1f8b0cd4ed8656db…](/hashes/sha256:1f8b0cd4ed8656dbc60eed6c4f335a138d620cd6154ea48ebbf08dc2406a7bf1)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · base cost1 · rate** = 6842 USD [inferred] · as [residential apartment building · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1916&end=1994) · [sha256:ec1e862021ca403f…](/hashes/sha256:ec1e862021ca403fa926978949fa4649ea6676ec8c7a5c876de4821fdab0c23d)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · base cost1 · amount** = 266 USD [inferred] · as [residential apartment building · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1916&end=1994) · [sha256:f9005ca6b9f3285f…](/hashes/sha256:f9005ca6b9f3285f25f3cb7e669f6310982d56b5ffc79241de32e9e64fd2450f)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · base cost1 · rate** = 8925 USD [inferred] · as [residential apartment building · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=1995&end=2039) · [sha256:afb309aad3ee7575…](/hashes/sha256:afb309aad3ee7575cd309fdff29234093ccad0cc312a4f2b3ce4d9ec6b4f8926)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · base cost1 · amount** = 532 USD [inferred] · as [residential apartment building · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2040&end=2084) · [sha256:69d623d473db9522…](/hashes/sha256:69d623d473db95220df7ed5c2e2e95d9caa601f9c26cb673abe806af190a2efb) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:b9a4aa90a372b92e1965cd5e4fb6af7870ff2bcb82c4789d5d94ae1415243437)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · base cost1 · rate** = 11602 USD [inferred] · as [residential apartment building · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2085&end=2131) · [sha256:521d0c919ebb5f5f…](/hashes/sha256:521d0c919ebb5f5fef0982eb221a57bd0870299a1f5a84ac20e34baa3512d8c3) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:5fc3802fa5d2039116bd3fb9f8c5d936b83ae6d2e77d5feb118b1334399fa854)
- **related ibc · class · building use · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · residential apartment building · base cost1 · amount** = 798 USD [inferred] · as [residential apartment building · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/building-use/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/residential-apartment-building/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2085&end=2131) · [sha256:cefe992249bd109c…](/hashes/sha256:cefe992249bd109cbfe0346c80af62966634cbab1755ef1f6ccb0914b029de00)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · 800 · amount** = 2528 USD [inferred] · as [800 · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4624&end=4668) · [sha256:10bd1ce71e2a06b3…](/hashes/sha256:10bd1ce71e2a06b35239dc58165e69a375ed20b29925e1cd890b5cc7abcb27da)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · 800 · amount** = 2844 USD [inferred] · as [800 · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4669&end=4713) · [sha256:79a0fbe6e8823bb0…](/hashes/sha256:79a0fbe6e8823bb028db808fbdddc68e800c56ac804fe2f7d60ff2844af2e15f)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · 800 · amount** = 3792 USD [inferred] · as [800 · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4714&end=4758) · [sha256:37e44dee8187c627…](/hashes/sha256:37e44dee8187c6278ccd51ba1330cace8d2c80514fd49c8a5684aef460d3a9f7)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · 400 · amount** = 266 USD [inferred] · as [400 · 400](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/400) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4624&end=4668) · [sha256:41c98c1b7478748b…](/hashes/sha256:41c98c1b7478748bec6fad4f01b4a4149e56481b82e80550a265513c9a2fa4f9)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · 400 · amount** = 399 USD [inferred] · as [400 · 400](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/400) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4669&end=4713) · [sha256:3a365b67277269c3…](/hashes/sha256:3a365b67277269c3e1feee0dd144fa3d5b412ad7f39a128219896c55cc0c4a88)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · 400 · amount** = 532 USD [inferred] · as [400 · 400](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/400) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4714&end=4758) · [sha256:49febbb34e8e8463…](/hashes/sha256:49febbb34e8e8463cbb0c805c2479f1edd422868f1145a7b235b55ac3e99f76e)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · base cost1 · amount** = 31.6 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4624&end=4668) · [sha256:49f973af33b6b267…](/hashes/sha256:49f973af33b6b2675528f5d442161d8b266e1a228b734f5316c2b197a1a5c88d)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · base cost1 · amount** = 47.4 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4669&end=4713) · [sha256:c896e949b36d9d75…](/hashes/sha256:c896e949b36d9d7514bec00e1544481bf207258628a9a6eb7007bc9776290236)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · base cost1 · amount** = 94.81 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4714&end=4758) · [sha256:164e3e6fc6afaf6b…](/hashes/sha256:164e3e6fc6afaf6b42aec79c680a16ec957596ba080b6f3dbe490a4a68d5f1e4)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2 · rate** = 191.79 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4624&end=4668) · [sha256:71fefbc70a8d0f7e…](/hashes/sha256:71fefbc70a8d0f7e3ad9cf9b2d5514201021b90ec6c4982d846645b92a590599)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2 · rate** = 125.64 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4669&end=4713) · [sha256:8c9734139fdf9857…](/hashes/sha256:8c9734139fdf9857289616e8fae84332729b42e4691540c82aee324e5104d559)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2 · rate** = 221.54 USD [inferred] · as [base cost1 cost for each add 100 sq ft 1 2 · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4714&end=4758) · [sha256:d66204dc051c42d8…](/hashes/sha256:d66204dc051c42d8ebdb3fcf8405bc74ebb3723a2aa56b0526d862e0b11468ad)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · 1 000 · amount** = 4165 USD [inferred] · as [1 000 · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4624&end=4668) · [sha256:9056d1f612f0018e…](/hashes/sha256:9056d1f612f0018e6643988f66d19abd6a840a77028f1e71adfe9573175fdb61)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · 1 000 · amount** = 5950 USD [inferred] · as [1 000 · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4669&end=4713) · [sha256:9d6a7c20d0cc2510…](/hashes/sha256:9d6a7c20d0cc2510d417741d5cf0ac409ef77624f53a99565c488f2504f4e6fa)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · 1 000 · amount** = 8330 USD [inferred] · as [1 000 · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4714&end=4758) · [sha256:956dd4bcd785d3dc…](/hashes/sha256:956dd4bcd785d3dc15fc61369d9507c7420de77491b801b44f1b8301fce40991)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 31.6 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4759&end=4826) · [sha256:0f622979df52564d…](/hashes/sha256:0f622979df52564d294c03b15660e486ce61430779e86d78e5c44f5fc37be440)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 71.4 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4827&end=4881) · [sha256:9e0ae536de195ea5…](/hashes/sha256:9e0ae536de195ea56b0a0fa197693ef013c7effdaf3242287bb1b31d846aa854)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 5.32 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4882&end=4924) · [sha256:15e1a18701b73f51…](/hashes/sha256:15e1a18701b73f51481e15b4c784cd9596565999ba9af1338731858d42543893) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:31863d8cea84daf1b1eb4a48f8d23e446ba2a1ae8fe7195b5458928870fd65ab)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 37.92 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4882&end=4924) · [sha256:2701bd3ec94a9f38…](/hashes/sha256:2701bd3ec94a9f38b48e585156d49eeddaefc700f0e5da98e5e54e91dcbd6a16) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:b127a68875e9e44dd9c0af72af53ce618bc82f85b8a95996515a3f7faaa8c75b)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 21.82 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4925&end=4968) · [sha256:692a764cd1af1e3b…](/hashes/sha256:692a764cd1af1e3b966f94eef659bce9922d1ab17b73b414a20a584fea551ab3)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 6.32 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4925&end=4968) · [sha256:c07dad585e515811…](/hashes/sha256:c07dad585e515811996b6e4eefb57994e1582e29eaf52589539c22f7cbfcdd46)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 17.72 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4969&end=5013) · [sha256:327994f63d86bdea…](/hashes/sha256:327994f63d86bdeaf3cc39d2f49cbfa12648dc242331b2a5bc68b1a2f2169d85)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 7.58 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4969&end=5013) · [sha256:95fffde676259dd5…](/hashes/sha256:95fffde676259dd5d7a1be0b88a1748de11666cad22bb64aaaeb2eabfc844e35)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 19.59 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5014&end=5061) · [sha256:49d36764d1c946c5…](/hashes/sha256:49d36764d1c946c5fee5625303ea3e10fceadd792d45aec17a273f5d0b9a99da)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 32.47 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5014&end=5061) · [sha256:7c01a645d72e9e0a…](/hashes/sha256:7c01a645d72e9e0a23f7d0a5467ae7171265b87b85adb3261f5fb81b71a5cd92)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 87.67 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5062&end=5129) · [sha256:2d5fff8249852db2…](/hashes/sha256:2d5fff8249852db20b5a19cfd0337a95ee23f23e1c62ca31fe1165e983bced77) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:d083f4f642915fd3ac09da1abf78ed4b0d50ed80f983b04364eebb2741562fbf)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 47.4 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5062&end=5129) · [sha256:50d230e1d0e1afcf…](/hashes/sha256:50d230e1d0e1afcf47c1eb7aec1dd81c790a478d90d38786da13ce778a5f5d5f)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 50.56 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5130&end=5185) · [sha256:2c79c5fcc79b31be…](/hashes/sha256:2c79c5fcc79b31be576b20ed713ac8f4a04445523ffed2d32467e1a99a8d6c78) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:98e4b285b57b967a00ced04302e017cd945087a3498b413f12a1f40cdba88b0c)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 83.3 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5130&end=5185) · [sha256:ab6321a8bff494cc…](/hashes/sha256:ab6321a8bff494cc4bceab48d6143cc52776eaac6cbf83755b6cc1c4cf0621e0)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 23.8 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5229&end=5272) · [sha256:0f625293cb86459c…](/hashes/sha256:0f625293cb86459c307c8e938c5bd9909483d47fb19eddafcb7385abfe0e5cc9)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 8.43 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5229&end=5272) · [sha256:af47d2ebfc6eb8a7…](/hashes/sha256:af47d2ebfc6eb8a74ca28b030d893df6cac4953aa42b8f18d9f2419ed8a8337e)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 8.85 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5273&end=5317) · [sha256:301fcaaa37c0c3d0…](/hashes/sha256:301fcaaa37c0c3d025d3a37a11ad05928ba34c866189aeec7e2b274f466725fd)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 18.91 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5273&end=5317) · [sha256:db46f443d6454121…](/hashes/sha256:db46f443d6454121ef83bc202c43db450b84159338101d68331a0ba12cb3a23c)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · amount** = 22.12 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5318&end=5366) · [sha256:bd43488997199390…](/hashes/sha256:bd43488997199390777890587dc65538dd81f68494dcae9e316e0c60b8d8a0c3)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation · rate** = 34.85 USD · as [base cost1 cost for each add 100 sq ft 1 2 · standard comm foundation](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/standard-comm-foundation) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5318&end=5366) · [sha256:f1795d7f66528129…](/hashes/sha256:f1795d7f66528129c74e7f8b68898445ea642042fde7f12a4989fb39eac7e925)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · w o podium · amount** = 4462 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4759&end=4826) · [sha256:1366d31a8132f915…](/hashes/sha256:1366d31a8132f9153e84d5f9267b0d179beec716efff934e6cff8b8aea760dc6)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · w o podium · amount** = 5950 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4827&end=4881) · [sha256:44886ed9af5218a7…](/hashes/sha256:44886ed9af5218a70d742fd4a499151113c25264ed77e5af97082b4d98384043)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · w o podium · amount** = 7735 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4882&end=4924) · [sha256:73f41e34d1a6aac2…](/hashes/sha256:73f41e34d1a6aac28bf4448799b1467c1154175884ddf61ab611c6a2ae7b20b1) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:c63e597a8c7084b6e823c04eb7e6dbd719bb905e5e1e66c62d37dc1efb51999a)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · w o podium · amount** = 11007 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4969&end=5013) · [sha256:a4bf49cccca1ffe1…](/hashes/sha256:a4bf49cccca1ffe142659bd40a2353174b6982ec75c2110ca224a61a9e30b895)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · w o podium · amount** = 15172 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5014&end=5061) · [sha256:4f32ab7365ea43cc…](/hashes/sha256:4f32ab7365ea43cc2892dc371c9fcf479c6afffbc62a7aefd0160a0ae42bb4a7)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · w o podium · amount** = 266 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4759&end=4826) · [sha256:1829294eceea689e…](/hashes/sha256:1829294eceea689ec469cf912a3bf6cb89b9e12702e105759afe400c24235411)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · w o podium · amount** = 532 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4882&end=4924) · [sha256:1af184cca6c8dc6d…](/hashes/sha256:1af184cca6c8dc6d147444759e93dd0c2022ddd89ae6f3166440139cb09c507b) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:31a817f9848bf7f2e49c520d94dcc1d65f3ccaaa22c39433054a77559c3c27ca)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · w o podium · amount** = 798 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4925&end=4968) · [sha256:bc09c9798cd9c8fd…](/hashes/sha256:bc09c9798cd9c8fd00982e097b73188948dc15925e909705568293e7dc831cf6) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:ec5811f9fe23d471260ff987fa1fd469fbdb57f830518af01ba70977a2bc3430)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · w o podium · amount** = 1064 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5014&end=5061) · [sha256:3b0dcf29bc0f296e…](/hashes/sha256:3b0dcf29bc0f296e78da269fa5ae88a4f76b3c1329dd1f98b177a283651d50af)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · w o podium · amount** = 3160 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4759&end=4826) · [sha256:5e06070b5d3f6318…](/hashes/sha256:5e06070b5d3f6318537574d12da6724a3944b9c4796ab5d915bde247ef304ed1)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · w o podium · amount** = 3792 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4827&end=4881) · [sha256:0e5c6a8df4ae3ee6…](/hashes/sha256:0e5c6a8df4ae3ee67b46f94cc1f792c48cc211f9f7cd2f7861bb209962bc50ab)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · w o podium · amount** = 5056 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4882&end=4924) · [sha256:91e6f7cf9a94dfce…](/hashes/sha256:91e6f7cf9a94dfcef760c1d133ce5bfcc47062022b6d14ebbcf32dd781be3615)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · w o podium · amount** = 6952 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4925&end=4968) · [sha256:b0e6918fd1df9054…](/hashes/sha256:b0e6918fd1df9054b78383b2cd2e9b649f42a910be3c685e85d3d9e0a29a7194)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · w o podium · amount** = 7900 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4969&end=5013) · [sha256:1e3c9b262ee6538b…](/hashes/sha256:1e3c9b262ee6538b607f53c4f3b11f9e9b101da53301bee0fdd6f9e9439ea6c1)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · w o podium · amount** = 9797 USD · as [standard comm foundation · w o podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/w-o-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5014&end=5061) · [sha256:017b98024146ec3c…](/hashes/sha256:017b98024146ec3c13525dcf5eb1260884f19abfa04811e19668326ad4329fb0)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · with podium · amount** = 266 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5062&end=5129) · [sha256:435fb890d281b53b…](/hashes/sha256:435fb890d281b53b4499d98642c2dca3d030ab0ecd05aac97641ab92472d0e05)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · with podium · amount** = 532 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5186&end=5228) · [sha256:b2e3ec24e3cb09dd…](/hashes/sha256:b2e3ec24e3cb09dd2d6bfe146d4ac4a4843da0aa1c1a4a89e04b58bfcabb33ef) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:bab2e12a1a1ea5b5cb312e523ba0d5c95359342a849315bfb78d9b8db459dfe3)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · with podium · amount** = 798 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5273&end=5317) · [sha256:8a9698505198894b…](/hashes/sha256:8a9698505198894bd2a1de06ff87830ac9d7bfef521b43ff0219417a98e83d4b) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:9b6a4529112377116f68df24fd74ceb88d68d4107456950e8d7714c27af2d2db)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · standard comm foundation · with podium · amount** = 1064 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5318&end=5366) · [sha256:f2c8e063e2d765a9…](/hashes/sha256:f2c8e063e2d765a99d8b43a4de094189c9f7f4cab962501890ac6105e8d64c67)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · with podium · amount** = 3476 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5062&end=5129) · [sha256:4f9607727e2fdcb0…](/hashes/sha256:4f9607727e2fdcb0c158decee03c11ecb94b24c1af24ee79af1e96486df61c4e)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · with podium · amount** = 4424 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5130&end=5185) · [sha256:e2e8dd4b42b8d60a…](/hashes/sha256:e2e8dd4b42b8d60a123efaea3879f77ecc778c345bec75658338c1e195545183)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · with podium · amount** = 5688 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5186&end=5228) · [sha256:6ef25e7eb684b704…](/hashes/sha256:6ef25e7eb684b7043e1b6c9beef3fe4ec9c56273c4a2d18e2f7160820cb53f45)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · with podium · amount** = 7584 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5229&end=5272) · [sha256:5ff23593d4514ee5…](/hashes/sha256:5ff23593d4514ee590d27eca2a8644e1d1ab7a2ef54dee702bc04e5156cc5864)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · with podium · amount** = 8849 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5273&end=5317) · [sha256:a0e5271f2eb74660…](/hashes/sha256:a0e5271f2eb746604a411296b1bc05b7ea968e73e4201e81ac730eaa965d8c47)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · standard comm foundation · with podium · amount** = 11061 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5318&end=5366) · [sha256:aa8da35f0bf01ce8…](/hashes/sha256:aa8da35f0bf01ce81b630ff52291fce6627a822746fe64cc3ce9c4d1cbb21a92)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · with podium · amount** = 4760 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5062&end=5129) · [sha256:58b9e2a31ab3b748…](/hashes/sha256:58b9e2a31ab3b7480c08abc62375d805be117280fd0d3b6cd2bafd32f6e5cdf9)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · with podium · amount** = 6247 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5130&end=5185) · [sha256:ddb27fc8685c2b1d…](/hashes/sha256:ddb27fc8685c2b1d32652d18b505e94265f45fc81042d4cd7fbb6f819e71f448)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · with podium · amount** = 8330 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5229&end=5272) · [sha256:08aef78edabf2cfc…](/hashes/sha256:08aef78edabf2cfc2702c4679a8e5ab03deb49fb7170b0a5feeb128d8133ad0f) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:5d5a06d958a924aca0f345e7971e3c9772e4eb1d3581db93a7a56dc777b3f8f6)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · with podium · amount** = 11900 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5273&end=5317) · [sha256:e6ccd616ea0753cd…](/hashes/sha256:e6ccd616ea0753cd1a86cd5c6b07edbff500244cdf193f6b0fa2364b4daa8cca)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · standard comm foundation · with podium · amount** = 16362 USD · as [standard comm foundation · with podium](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/standard-comm-foundation/with-podium) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5318&end=5366) · [sha256:ef3584e297f96684…](/hashes/sha256:ef3584e297f966847992d724d970c77db6052cdd8234bdcca46914dbf17ef6cb)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · cost for each add 100 sq ft 1 2 · rate** = 87.67 USD · as [all shell buildings · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5367&end=5428) · [sha256:17285f2e47d3738f…](/hashes/sha256:17285f2e47d3738fef67f3f2710074bcedaa8316dd730e2bee887f302d5440e4)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · cost for each add 100 sq ft 1 2 · rate** = 71.4 USD · as [all shell buildings · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5429&end=5472) · [sha256:7a8c714b2a0a46af…](/hashes/sha256:7a8c714b2a0a46af0894cee7923620dadc69bcee747610c74e25ffc6e7981069)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · cost for each add 100 sq ft 1 2 · rate** = 5.32 USD · as [all shell buildings · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5473&end=5515) · [sha256:d4cfbc8096b50653…](/hashes/sha256:d4cfbc8096b50653775dbb20ea75c2fb1089f2a8a89a305c6beb1d3d5d3a0079)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · cost for each add 100 sq ft 1 2 · rate** = 21.82 USD · as [all shell buildings · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5516&end=5560) · [sha256:ca90f3f918a3c579…](/hashes/sha256:ca90f3f918a3c579c2a1521a6f1fdbe7cebe0c531f20384e0fac9625654e10b8)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · cost for each add 100 sq ft 1 2 · rate** = 16.53 USD · as [all shell buildings · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5561&end=5606) · [sha256:0857c1f336eb89b4…](/hashes/sha256:0857c1f336eb89b459f48699604f8c215cd8003000d5daafbf7322b3592cf50e)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · cost for each add 100 sq ft 1 2 · rate** = 31.28 USD · as [all shell buildings · cost for each add 100 sq ft 1 2](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/cost-for-each-add-100-sq-ft-1-2) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5607&end=5655) · [sha256:3080cb8065467d22…](/hashes/sha256:3080cb8065467d22478ec08334d0903650b049dd9e03458ee04dcfa2d73c2c0d)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · all shell buildings · 1 000 · amount** = 4165 USD · as [all shell buildings · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/all-shell-buildings/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5367&end=5428) · [sha256:32aecdb579be8b2f…](/hashes/sha256:32aecdb579be8b2fa148195abc0f890fa4079e365dc40ed7abaa70c670e1ed44)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · all shell buildings · 1 000 · amount** = 5652 USD · as [all shell buildings · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/all-shell-buildings/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5429&end=5472) · [sha256:2210251b9e377843…](/hashes/sha256:2210251b9e377843fe645cf1785d68efba333a37fa44cb8cee1809b7b7a72c7c)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · all shell buildings · 1 000 · amount** = 7437 USD · as [all shell buildings · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/all-shell-buildings/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5516&end=5560) · [sha256:6c6497c3fd86a896…](/hashes/sha256:6c6497c3fd86a896282123e4ef1810e01e8b0c8628404b405c487ac9c992c88e) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:e85b1e149a889a6987ec7cd0011ce28ac99fd4bed8608f0f7cc6d5cdf2a0c5eb)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · all shell buildings · 1 000 · amount** = 10710 USD · as [all shell buildings · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/all-shell-buildings/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5561&end=5606) · [sha256:4f3e9e26c9645ad1…](/hashes/sha256:4f3e9e26c9645ad1562d904028d668bccc38a07f308b7e8c05412b17b5d6a2fd)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 1 000 · all shell buildings · 1 000 · amount** = 14577 USD · as [all shell buildings · 1 000](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/1-000/all-shell-buildings/1-000) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5607&end=5655) · [sha256:3bae39a35a9a9e17…](/hashes/sha256:3bae39a35a9a9e177c4c62df305ec3ab31609009c91be1a8f70a09e1ea45a170)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · all shell buildings · 800 · amount** = 3792 USD · as [all shell buildings · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/all-shell-buildings/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5367&end=5428) · [sha256:7a20ffa1f5efe10b…](/hashes/sha256:7a20ffa1f5efe10ba776dcdfc757fc3c56deca37cffc76febc54d23876cd1d45)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · all shell buildings · 800 · amount** = 4740 USD · as [all shell buildings · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/all-shell-buildings/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5429&end=5472) · [sha256:847799354f2cf2ec…](/hashes/sha256:847799354f2cf2ec6b00d1c5c3bd85a981a5b30c1227cd8da1076079e81870ca)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · all shell buildings · 800 · amount** = 6320 USD · as [all shell buildings · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/all-shell-buildings/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5473&end=5515) · [sha256:4256c2dd602a9df3…](/hashes/sha256:4256c2dd602a9df3afb4fea70207cb873171818cd3358c3a0f6f8834db679354)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · all shell buildings · 800 · amount** = 8532 USD · as [all shell buildings · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/all-shell-buildings/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5516&end=5560) · [sha256:cd25ac18806ae223…](/hashes/sha256:cd25ac18806ae2234ad85e45ba7a4ce90abe7cbc28703a36a97f8d9d3b5e0950)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · all shell buildings · 800 · amount** = 10113 USD · as [all shell buildings · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/all-shell-buildings/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5561&end=5606) · [sha256:976f6f01252da138…](/hashes/sha256:976f6f01252da1382b06bdf3ddd8b1be2d137f281394ef92b15a9171e060210a)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 800 · all shell buildings · 800 · amount** = 12325 USD · as [all shell buildings · 800](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/800/all-shell-buildings/800) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5607&end=5655) · [sha256:628012edc7c7eb81…](/hashes/sha256:628012edc7c7eb81b845e491d8eb61e838242ad5b58b044ad44ad4d8c0178001)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · base cost1 · amount** = 47.4 USD · as [all shell buildings · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5367&end=5428) · [sha256:e0a3196342703402…](/hashes/sha256:e0a31963427034024e92dad6f43bcad64e74780479daf4417aabf9e6675b5edd)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · base cost1 · amount** = 63.2 USD · as [all shell buildings · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5429&end=5472) · [sha256:09735845ceb0d830…](/hashes/sha256:09735845ceb0d8302c64c0685badc18f1188c5a64c242ae464a6e8fdff2cb419)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · base cost1 · amount** = 44.24 USD · as [all shell buildings · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5473&end=5515) · [sha256:a0ffba1eeba00435…](/hashes/sha256:a0ffba1eeba004352c180c5114a286caf01fa7c9615f5bb0375b517328248216)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · base cost1 · amount** = 10.53 USD · as [all shell buildings · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5516&end=5560) · [sha256:080e69d1b47b3e07…](/hashes/sha256:080e69d1b47b3e075f7a0bdcd002f722b6a887160673e3263e8d2473a09677ca)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · base cost1 · amount** = 8.85 USD · as [all shell buildings · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5561&end=5606) · [sha256:aaef53d217a93b68…](/hashes/sha256:aaef53d217a93b683631a76295468242591874423ca8d55cb54e8ee9271eaa09)
- **e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · all shell buildings · base cost1 · amount** = 24.65 USD · as [all shell buildings · base cost1](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/all-shell-buildings/base-cost1) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5607&end=5655) · [sha256:21e9823c4becefee…](/hashes/sha256:21e9823c4becefee3f9e677d22ea2bcdfdc397d180654e7ca57705dec873159d)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · all shell buildings · 400 · amount** = 266 USD · as [all shell buildings · 400](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/all-shell-buildings/400) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5367&end=5428) · [sha256:fb029853df14a5a0…](/hashes/sha256:fb029853df14a5a0954b747257acf600eeb7ffa68bcfb2e74e62f289d31ed05e)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · all shell buildings · 400 · amount** = 532 USD · as [all shell buildings · 400](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/all-shell-buildings/400) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5473&end=5515) · [sha256:ace83b636dc4fa21…](/hashes/sha256:ace83b636dc4fa21211f2dfac5d970f1cfcfbf00d72c727bdbf358cec13257c9) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:cc7e9541518a78ec46d9804e7f26af7997e22260951d40501832a3ca82b3bb35)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · all shell buildings · 400 · amount** = 798 USD · as [all shell buildings · 400](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/all-shell-buildings/400) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5516&end=5560) · [sha256:372abb7531e5a7a4…](/hashes/sha256:372abb7531e5a7a48afe5c1d0c2f2b369c331e8b10b434bd5479453678b9d8aa) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:8040873bfb2fc65f2d8cd6a78bd460b03fe8a8cb7da745ee272ff1859d05ef7a)
- **related ibc · class · e g ibc occupancy type sq ft inspection cost · base cost1 cost for each add 100 sq ft 1 2 · 400 · all shell buildings · 400 · amount** = 1064 USD · as [all shell buildings · 400](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-1-plan-check-and-inspection-fees/related-ibc/class/e-g-ibc-occupancy-type-sq-ft-inspection-cost/base-cost1-cost-for-each-add-100-sq-ft-1-2/400/all-shell-buildings/400) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5607&end=5655) · [sha256:e820eeb57caeeb5e…](/hashes/sha256:e820eeb57caeeb5e5ca7f9e93123f9bd39d4d9d01097ffd35d5c20431db5cc9a)

### schedule d table 2 mechanical electrical plumbing fees (38 records)

- **fee description unit · fy 2026 27 · proposed fee · mechanical permit fee · basis** = Each · as [proposed fee · mechanical permit fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/mechanical-permit-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5921&end=5953) · [sha256:0daf2028bd91620b…](/hashes/sha256:0daf2028bd91620b1ddcc30598094b528a6d28cd8b7ead662a5319da6aa3659b)
- **fee description unit · fy 2026 27 · proposed fee · mechanical permit fee · amount** = 303 USD · as [proposed fee · mechanical permit fee](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/mechanical-permit-fee) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5921&end=5953) · [sha256:75514fb3abfaffdb…](/hashes/sha256:75514fb3abfaffdb4866ebca0c7da31f7d3f050896de43218a6ec8beffc539e9)
- **fee description unit · fy 2026 27 · proposed fee · stand alone mechanical plan check hourly rate · basis** = Each · as [proposed fee · stand alone mechanical plan check hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/stand-alone-mechanical-plan-check-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5954&end=6012) · [sha256:6003772af2ed306d…](/hashes/sha256:6003772af2ed306da3633be25d415ec2db3aecc94795e0fe36dc36ccb9fbbb7e)
- **fee description unit · fy 2026 27 · proposed fee · stand alone mechanical plan check hourly rate · rate** = 303 USD · as [proposed fee · stand alone mechanical plan check hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/stand-alone-mechanical-plan-check-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=5954&end=6012) · [sha256:afe706916a576cfe…](/hashes/sha256:afe706916a576cfeda6e87beb0ed60e35a4a220c8b82515f454f077f0cf30d33)
- **fee description unit · fy 2026 27 · proposed fee · other mechanical inspections hourly rate · rate** = 303 USD · as [proposed fee · other mechanical inspections hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/other-mechanical-inspections-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6013&end=6066) · [sha256:ac25ceb6b9fda023…](/hashes/sha256:ac25ceb6b9fda023b3106a7d2d56b19ee3146669e6f2b56e7c7a2900afb87262)
- **fee description unit · fy 2026 27 · proposed fee · other mechanical inspections hourly rate · basis** = Each · as [proposed fee · other mechanical inspections hourly rate](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/other-mechanical-inspections-hourly-rate) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6013&end=6066) · [sha256:cc52af83a4b43888…](/hashes/sha256:cc52af83a4b43888a87fb23352fdf4ce8ef3741c36972825e3e96ac3cb20e196)
- **fee description unit · fy 2026 27 · proposed fee · install or relocate hvac system or portion there of residential · basis** = Each · as [proposed fee · install or relocate hvac system or portion there of residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/install-or-relocate-hvac-system-or-portion-there-of-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6119&end=6141) · [sha256:2b63ee694c589549…](/hashes/sha256:2b63ee694c5895491f540c0b5eb83d18b027e673d54dfaf1c47be52f71e2ed84)
- **fee description unit · fy 2026 27 · proposed fee · install or relocate hvac system or portion there of residential · amount** = 297 USD · as [proposed fee · install or relocate hvac system or portion there of residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/install-or-relocate-hvac-system-or-portion-there-of-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6119&end=6141) · [sha256:2d214469d379f050…](/hashes/sha256:2d214469d379f050b5b2a83db29e674994b52d6dec7d9696f1796514fd86c256)
- **fee description unit · fy 2026 27 · proposed fee · commercial · amount** = 447 USD · as [proposed fee · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6142&end=6163) · [sha256:1a1d4681be27f7bc…](/hashes/sha256:1a1d4681be27f7bcdc724bed67b1420c501960ea2e458350a6d6fde722d3b765)
- **fee description unit · fy 2026 27 · proposed fee · commercial · basis** = Each · as [proposed fee · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/fee-description-unit/fy-2026-27/proposed-fee/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6142&end=6163) · [sha256:1c64e288f1382e33…](/hashes/sha256:1c64e288f1382e3398d2726cd33094bdc9d3158861d290e9a8b6c27d669e07da)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · appliances install repair replace residential · basis** = Each · as [proposed fee · appliances install repair replace residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/appliances-install-repair-replace-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6759&end=6780) · [sha256:87b1a4d6c2989b3f…](/hashes/sha256:87b1a4d6c2989b3fdda1d43a0f8e965770b41f04ac7d0b8c4f688b7a44f1c13e)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · appliances install repair replace residential · amount** = 50 USD · as [proposed fee · appliances install repair replace residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/appliances-install-repair-replace-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6759&end=6780) · [sha256:8ba5bcec3013386c…](/hashes/sha256:8ba5bcec3013386c6a37fcf44d74ff2a5b911849f36a9686f8a2b0ad25bac519)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · appliances install repair replace · commercial · basis** = Each · as [appliances install repair replace · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/appliances-install-repair-replace/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6781&end=6801) · [sha256:273f4cf4bfbf2935…](/hashes/sha256:273f4cf4bfbf29358504f331f8226f3cca3c31c82e5f0af0ea50b4d3de0eec38)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · appliances install repair replace · commercial · amount** = 98 USD · as [appliances install repair replace · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/appliances-install-repair-replace/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6781&end=6801) · [sha256:90314eb42a3dc857…](/hashes/sha256:90314eb42a3dc857765ca3383aa6879cd9c696412f13fb52f0f0c797d9881ff3)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · power apparatus generator transformer or similar install repair replace residential · amount** = 297 USD · as [proposed fee · power apparatus generator transformer or similar install repair replace residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/power-apparatus-generator-transformer-or-similar-install-repair-replace-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6878&end=6900) · [sha256:36382dc6582fa1f1…](/hashes/sha256:36382dc6582fa1f125b2ca77aa8aa1dfd6f71f32274d14cec32a1892e457aa0a)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · power apparatus generator transformer or similar install repair replace residential · basis** = Each · as [proposed fee · power apparatus generator transformer or similar install repair replace residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/power-apparatus-generator-transformer-or-similar-install-repair-replace-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6878&end=6900) · [sha256:45a6759d8624c1d0…](/hashes/sha256:45a6759d8624c1d0daea666ffe009f01d4c2739331d9b8e97ac08cfc69c31f09)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · power apparatus generator transformer or similar install repair replace · commercial · basis** = Each · as [power apparatus generator transformer or similar install repair replace · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/power-apparatus-generator-transformer-or-similar-install-repair-replace/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6901&end=6922) · [sha256:75531e63d40630b2…](/hashes/sha256:75531e63d40630b260160bf1449a343606d02cf62d156a1af0b4946c7e68053f)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · power apparatus generator transformer or similar install repair replace · commercial · amount** = 447 USD · as [power apparatus generator transformer or similar install repair replace · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/power-apparatus-generator-transformer-or-similar-install-repair-replace/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6901&end=6922) · [sha256:a34918606213e7b2…](/hashes/sha256:a34918606213e7b2537a9e304cf91acd7a7e2a941b91471891164b8d1bff2915)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · services including temporary power · 600 volts or less up to 200 amperes in rating · amount** = 99 USD · as [services including temporary power · 600 volts or less up to 200 amperes in rating](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/services-including-temporary-power/600-volts-or-less-up-to-200-amperes-in-rating) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6960&end=7016) · [sha256:65ee63eb5d528bf7…](/hashes/sha256:65ee63eb5d528bf71281a0c284580f6a862a3f49ed0e928d9f887e1fcc97f171)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · services including temporary power · 600 volts or less up to 200 amperes in rating · basis** = Each · as [services including temporary power · 600 volts or less up to 200 amperes in rating](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/services-including-temporary-power/600-volts-or-less-up-to-200-amperes-in-rating) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=6960&end=7016) · [sha256:cac4b903bbb7723d…](/hashes/sha256:cac4b903bbb7723dcd2c76a5e22e37cc0633c25db58e47c02cc95902a74d0e84)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · services including temporary power · 600 volts or less 201 to 1000 amperes in rating · amount** = 297 USD · as [services including temporary power · 600 volts or less 201 to 1000 amperes in rating](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/services-including-temporary-power/600-volts-or-less-201-to-1000-amperes-in-rating) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7017&end=7076) · [sha256:8e5155ba2072a8be…](/hashes/sha256:8e5155ba2072a8be6d3b0db9cb7a1eafe00f4b64cce80fb7bbb15da2984343dc)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · services including temporary power · 600 volts or less 201 to 1000 amperes in rating · basis** = Each · as [services including temporary power · 600 volts or less 201 to 1000 amperes in rating](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/services-including-temporary-power/600-volts-or-less-201-to-1000-amperes-in-rating) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7017&end=7076) · [sha256:ab9ff36690077d44…](/hashes/sha256:ab9ff36690077d447a489ff84d381db6f3ed363f0511ed6b0125f0bd89ae7ee2)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · services including temporary power · over 600 volts or over 1000 amperes in rating · basis** = Each · as [services including temporary power · over 600 volts or over 1000 amperes in rating](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/services-including-temporary-power/over-600-volts-or-over-1000-amperes-in-rating) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7077&end=7133) · [sha256:09803ccc4b507de2…](/hashes/sha256:09803ccc4b507de2d065ed0e6a1d7f35831c0985469d288e11c46ec33855e854)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · services including temporary power · over 600 volts or over 1000 amperes in rating · amount** = 447 USD · as [services including temporary power · over 600 volts or over 1000 amperes in rating](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/services-including-temporary-power/over-600-volts-or-over-1000-amperes-in-rating) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7077&end=7133) · [sha256:95866a9029df9f75…](/hashes/sha256:95866a9029df9f7568583ea5128d2b14846a0e903fe3bf9d3b0daef452f73b3c)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · any other electrical apparatus conduits and conductors not listed in electrical schedule · basis** = Each · as [proposed fee · any other electrical apparatus conduits and conductors not listed in electrical schedule](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/any-other-electrical-apparatus-conduits-and-conductors-not-listed-in-electrical-schedule) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7216&end=7236) · [sha256:699ae071f1461d72…](/hashes/sha256:699ae071f1461d7290d35e45eabb3987352c2ac6a277b31fd076e41e42ddcf60)
- **electrical fees · fee description unit · fy 2026 27 · proposed fee · any other electrical apparatus conduits and conductors not listed in electrical schedule · amount** = 297 USD · as [proposed fee · any other electrical apparatus conduits and conductors not listed in electrical schedule](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/electrical-fees/fee-description-unit/fy-2026-27/proposed-fee/any-other-electrical-apparatus-conduits-and-conductors-not-listed-in-electrical-schedule) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7216&end=7236) · [sha256:a79896745a489896…](/hashes/sha256:a79896745a489896fa47842148503b41dff751604d87bc95a4417724dee04da1)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · water treatment system install repair replace · amount** = 99 USD · as [proposed fee · water treatment system install repair replace](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/water-treatment-system-install-repair-replace) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7453&end=7510) · [sha256:6f8c823572176cba…](/hashes/sha256:6f8c823572176cbaaf999691f83819c92241390f0f08f4c38c2ae47bbd73d7ef)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · water treatment system install repair replace · basis** = Each · as [proposed fee · water treatment system install repair replace](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/water-treatment-system-install-repair-replace) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7453&end=7510) · [sha256:e21876760832897f…](/hashes/sha256:e21876760832897f99a1bced06889f2207aba29b111750e9d64d668f09d5c203)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · gas piping install repair replace · basis** = Each · as [proposed fee · gas piping install repair replace](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/gas-piping-install-repair-replace) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7511&end=7559) · [sha256:4c110f0cbb5fba7a…](/hashes/sha256:4c110f0cbb5fba7a562bbe42d6283021875540f2dd30ab68a4d5682e51eb3a5d)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · gas piping install repair replace · amount** = 150 USD · as [proposed fee · gas piping install repair replace](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/gas-piping-install-repair-replace) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7511&end=7559) · [sha256:7fc7e8acbc714112…](/hashes/sha256:7fc7e8acbc714112fb56829113951c959b617d883db292053e6079590a03006d)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · install or replace water meter service · basis** = Each · as [proposed fee · install or replace water meter service](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/install-or-replace-water-meter-service) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7560&end=7610) · [sha256:1d741c6f48998daf…](/hashes/sha256:1d741c6f48998daf77f81145ab233589219c4f9c7b953583f0bc3068cfd75b02)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · install or replace water meter service · amount** = 74 USD · as [proposed fee · install or replace water meter service](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/install-or-replace-water-meter-service) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7560&end=7610) · [sha256:a599444649aaf537…](/hashes/sha256:a599444649aaf5371c3c8aca998c53df154281a33ba7d725755996b2f2c359e9)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · partial water re pipe residential · basis** = Per fixture · as [proposed fee · partial water re pipe residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/partial-water-re-pipe-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7633&end=7661) · [sha256:29551be7175aff6c…](/hashes/sha256:29551be7175aff6cc607f925f9438f77e5aba95aea33aa94375c19a42c982fcc)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · partial water re pipe residential · rate** = 30 USD · as [proposed fee · partial water re pipe residential](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/partial-water-re-pipe-residential) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7633&end=7661) · [sha256:b0ac225bb118adbf…](/hashes/sha256:b0ac225bb118adbf5392793f853f2418ffd3c1dfd95316c57a55347a88528ad1)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · commercial · basis** = Per fixture · as [proposed fee · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7662&end=7689) · [sha256:300962ab0778f46e…](/hashes/sha256:300962ab0778f46e645eefc4f28d01e6f26b093d2c4885b45aec3f413e8c62ea)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · commercial · rate** = 20 USD · as [proposed fee · commercial](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/commercial) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7662&end=7689) · [sha256:dd1d1f80fe908ca5…](/hashes/sha256:dd1d1f80fe908ca52f9e8ae4bcd28cb9748077ca1fd2bedc66ab6289bf0f35d9)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · any other device fixture not listed in plumbing schedule install repair replace · amount** = 150 USD · as [proposed fee · any other device fixture not listed in plumbing schedule install repair replace](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/any-other-device-fixture-not-listed-in-plumbing-schedule-install-repair-replace) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7690&end=7782) · [sha256:78b599a83e6caa5b…](/hashes/sha256:78b599a83e6caa5b46e5b91d4b68cce6efcf10dff0ab3de2dbdf70254ead7a33)
- **plumbing gas fees · plumbing gas unit fees · fee description unit · fy 2026 27 · proposed fee · any other device fixture not listed in plumbing schedule install repair replace · basis** = Each · as [proposed fee · any other device fixture not listed in plumbing schedule install repair replace](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/schedule-d-table-2-mechanical-electrical-plumbing-fees/plumbing-gas-fees/plumbing-gas-unit-fees/fee-description-unit/fy-2026-27/proposed-fee/any-other-device-fixture-not-listed-in-plumbing-schedule-install-repair-replace) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=7690&end=7782) · [sha256:ce117a2f60a3adb7…](/hashes/sha256:ce117a2f60a3adb70e3fa43ef520bfb566f76b69b74455a9d03b296d04b38a85)

### r 3 group care 1 000 (30 records)

- **r 3 group care · amount** = 266 USD · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3177&end=3235) · [sha256:343fee6e06d3f3ae…](/hashes/sha256:343fee6e06d3f3ae4e2a281f6a84fccbe56480ac829db6e823c9d145863b3276)
- **r 3 group care · amount** = 47.4 USD · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3177&end=3235) · [sha256:417c1ac3323aa2d8…](/hashes/sha256:417c1ac3323aa2d8f989544f1c7db0ddf5ed9b59735e487219386e13bde84171)
- **r 3 group care · amount** = 6842 USD · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3177&end=3235) · [sha256:4306a10da40b8a32…](/hashes/sha256:4306a10da40b8a32e1da243d67feb538d1ebf29de9544ed6154bbca08c817e42)
- **r 3 group care · amount** = 66.15 USD · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3177&end=3235) · [sha256:47f17f13ba532512…](/hashes/sha256:47f17f13ba5325129bfcf447a6ff6f0b9560d2153d8c88b19985ab995eecbdfd)
- **r 3 group care · amount** = 6952 USD · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3177&end=3235) · [sha256:a1286850905e59fd…](/hashes/sha256:a1286850905e59fdc6eff5c173cba2a1ba63549498ca832aed8e4b7b3b746fa8)
- **r 3 group care · amount** = 8849 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3236&end=3279) · [sha256:173dd3609c30a70c…](/hashes/sha256:173dd3609c30a70ca1610b1930871390f128afd10887672241c9b55ad479b738)
- **r 3 group care · amount** = 9222 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3236&end=3279) · [sha256:26d95e1ec926a296…](/hashes/sha256:26d95e1ec926a2963c1877727d48219f68e573d1aee0ab06963d5093cc3441c4)
- **r 3 group care · amount** = 53.55 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3236&end=3279) · [sha256:ee7b0bb519e410f4…](/hashes/sha256:ee7b0bb519e410f407031ae10ccba3b1752473fab834cc4835134a6546cc5724)
- **r 3 group care · amount** = 50.56 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3236&end=3279) · [sha256:fab5d61c69d8fa87…](/hashes/sha256:fab5d61c69d8fa87950806db12032f8b1deec3547956f5a4f857ec64d75b56bc)
- **r 3 group care · amount** = 11377 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3280&end=3325) · [sha256:0237be38ecc5bce2…](/hashes/sha256:0237be38ecc5bce2bb9b97fbb53d91b2b1fcbe2abfacf9bfe9bea1588c64c708)
- **r 3 group care · amount** = 41.08 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3280&end=3325) · [sha256:1ebd019f5fe82abe…](/hashes/sha256:1ebd019f5fe82abee0948d6de2f2b752d63bfea30b64e496529a75f283c210f8)
- **r 3 group care · amount** = 2.66 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3280&end=3325) · [sha256:882d37080b51eb44…](/hashes/sha256:882d37080b51eb4462df94fe14a1a3a411ff0b93842bb9cd03bd1cbc0833f64b)
- **r 3 group care · amount** = 532 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3280&end=3325) · [sha256:9227786173d05134…](/hashes/sha256:9227786173d05134a6efbd2a046c12a3bf88085bc93f2f7824d859caadbf07c1) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:c068bdbfeee1ed0685df4e9f6884de591d892afb7df5eb79738a1fa116a9df70)
- **r 3 group care · amount** = 11900 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3326&end=3371) · [sha256:2e33c445c550d5db…](/hashes/sha256:2e33c445c550d5db2add47144be9efe085250300aa6dd19d1383bb153024ca9d) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:31d7368fd2ca76453219ea377f1c4ce4f45f0dee2ffae479b62bee54d0596b94)
- **r 3 group care · amount** = 8.43 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3326&end=3371) · [sha256:4108db04aec72074…](/hashes/sha256:4108db04aec72074734fd386ff5022c947c4350c3de1ef2af2dcddf470dbf058)
- **r 3 group care · amount** = 798 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3326&end=3371) · [sha256:a3efb35a48cedd91…](/hashes/sha256:a3efb35a48cedd91b932bbe37ca51e6b627a7b93f23d239724bc77684f65f4d0) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:a694a93f2e4cb8707197aae7382cccefca0eabfec5c31b40fda07fde6a8fb8a0)
- **r 3 group care · amount** = 15485 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3326&end=3371) · [sha256:a705d262f35842ec…](/hashes/sha256:a705d262f35842ecd16d207095eaee8924febf98a549afeaea7f0c50a57b481f)
- **r 3 group care · amount** = 16.86 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3326&end=3371) · [sha256:e2210043c4187989…](/hashes/sha256:e2210043c4187989564598ae844cd98fbe7577771328c7bf9ef67471eaed0b92)
- **r 3 group care · amount** = 18013 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3372&end=3417) · [sha256:16298e6b4c6f7f12…](/hashes/sha256:16298e6b4c6f7f1231ba6432eccf0e3bf6d04d89e4a620cc27190c2c17653832)
- **r 3 group care · amount** = 13.62 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3372&end=3417) · [sha256:2449a66c8b016760…](/hashes/sha256:2449a66c8b0167609b98345b0992c314cbbb5ae6cabe376ba07b9a5e5f6f7128)
- **r 3 group care · amount** = 16957 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3372&end=3417) · [sha256:b259effa0b3416de…](/hashes/sha256:b259effa0b3416de0e02f53f05fe49f5df87daeb76c34e4fe764c33e6f636acb)
- **r 3 group care · amount** = 8.85 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3372&end=3417) · [sha256:b4afb1f6d12d783d…](/hashes/sha256:b4afb1f6d12d783def52558d2cba123f7a9a30fc04bb14caf72734e87f75bb5f)
- **r 3 group care · amount** = 1064 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3418&end=3467) · [sha256:0d74f317c763cc61…](/hashes/sha256:0d74f317c763cc61d335e94d7d3635c76f8596c4f3996fd682c301c2f576d0ab)
- **r 3 group care · amount** = 24.57 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3418&end=3467) · [sha256:20b315ccd793b7f6…](/hashes/sha256:20b315ccd793b7f61e62bdccfcc12d8436e0b3f899aa258fc2b191079dcf5645)
- **r 3 group care · amount** = 23502 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3418&end=3467) · [sha256:9986dfc6374ddeff…](/hashes/sha256:9986dfc6374ddeffb8884c17a036647cfda50cc49b57bddc7a7f38250476c3ed)
- **r 3 group care · amount** = 22.44 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3418&end=3467) · [sha256:a203448c8a7b7882…](/hashes/sha256:a203448c8a7b7882ada1f94ea4621e42ae050c23dbc1d53ca47acbffc37356df)
- **r 3 group care · amount** = 22437 USD [inferred] · as [r 3 group care 1 000 · r 3 group care](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-3-group-care-1-000/r-3-group-care) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3418&end=3467) · [sha256:d62e535497c6496a…](/hashes/sha256:d62e535497c6496a78d713e7d0c8716f3500b3bfba3a942a07841e6fe9394db6)

### [s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) (30 records)

- **amount** = 5688 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4125&end=4168) · [sha256:321aed3285873ae9…](/hashes/sha256:321aed3285873ae947f4e08617c2e57adb6e1337fd9814c8a18782f295b8a321)
- **amount** = 532 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4125&end=4168) · [sha256:361292967e3f9016…](/hashes/sha256:361292967e3f9016218e6b09fa7a0e120d73fa324cbf3b68f03dc6173a69dff8) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:5d163d35776b2e22b530c3d7559d5c727092d8f18070fb00155cd1a071230507)
- **amount** = 69.42 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4125&end=4168) · [sha256:5e7eba8a5b6529c8…](/hashes/sha256:5e7eba8a5b6529c8b39a2d2b99bab8eac527ee0b3c46fe4bf9296ef54d5653bd)
- **amount** = 5950 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4125&end=4168) · [sha256:92bd50255a7a6a09…](/hashes/sha256:92bd50255a7a6a09f25063c851932e64531d4b7122df5f4971b1127707027f72)
- **amount** = 52.67 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4125&end=4168) · [sha256:e36c561ff9b30b19…](/hashes/sha256:e36c561ff9b30b1958ee8167cb27892ecaa83db2e3c6adfb9ac79099d403c7f8)
- **amount** = 7268 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4169&end=4211) · [sha256:45cd9e4bcbddb4ae…](/hashes/sha256:45cd9e4bcbddb4ae987c96b8a5e5691ea83afe86a87bc02f1ca2c56074a0f1a6)
- **amount** = 42.14 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4169&end=4211) · [sha256:6008022cc11da645…](/hashes/sha256:6008022cc11da645cf1749cb4d8b7c7454aefa3c6c53cb4a3eaba461ca175cdc)
- **amount** = 4.43 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4169&end=4211) · [sha256:ffc7b6d55775c2c1…](/hashes/sha256:ffc7b6d55775c2c1ccb0b3aa0a1f871f81cfaaf95b9f634727ea7eb0f4c3baf0)
- **amount** = 8.78 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4212&end=4255) · [sha256:058192a6562b207f…](/hashes/sha256:058192a6562b207f3b388cfb3d86b428b5ae610387893ea7bf9239d2896b5574)
- **amount** = 8032 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4212&end=4255) · [sha256:12bb1da55640f6d7…](/hashes/sha256:12bb1da55640f6d740dfcd08e32765519986a75ed25942c245264572ff66d1fc) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:ef10acfe10a2f24d6ae49dda62122aeb5ea95806da8265375d2bfd2e768d7bc0)
- **amount** = 18.18 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4212&end=4255) · [sha256:7eaddbf1f2aa33ce…](/hashes/sha256:7eaddbf1f2aa33ce7b60c2648985c252e27a3b7f2c0294b9c102ef98ee280dc6)
- **amount** = 9797 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4212&end=4255) · [sha256:8fa81e5649d91bb7…](/hashes/sha256:8fa81e5649d91bb7bc391b369037ee07719db6d00be6ebd877d58b298314fb0c)
- **amount** = 9.48 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4256&end=4301) · [sha256:6d0af8dc44b4f937…](/hashes/sha256:6d0af8dc44b4f937135b02132c60d477b51a82c499044ac1f92b2f24e9272756)
- **amount** = 11305 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4256&end=4301) · [sha256:6db9bb846e9283c5…](/hashes/sha256:6db9bb846e9283c50db293087be2e92e92e0c22079427365012bab23ec1b5297)
- **amount** = 11377 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4256&end=4301) · [sha256:94c9d37118cc4d0f…](/hashes/sha256:94c9d37118cc4d0f8eea47c414c2f182a2f0030a1ce924e9900a1419f284775c)
- **amount** = 798 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4256&end=4301) · [sha256:b49f4f162bceedf2…](/hashes/sha256:b49f4f162bceedf24eeee944b0749ee00d8f32382342b352b3828a7a559f8ca7) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:f7f1ee0cbe8a677d099b9defe04a3fb7f571e9ad6c289a629b3b08c40cde0ea8)
- **amount** = 15.76 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4256&end=4301) · [sha256:d6009b7addd9133a…](/hashes/sha256:d6009b7addd9133ab9e16d8b718a8969cb2a3c6d511bd2ad2de1456146a7e6ba)
- **amount** = 28.05 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4302&end=4350) · [sha256:1cd37f91a08071d2…](/hashes/sha256:1cd37f91a08071d24408c6c9cacdce68a2dac29dc98f47cd9dcd3625833e0e0d)
- **amount** = 14221 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4302&end=4350) · [sha256:24d1fec6aa7707e7…](/hashes/sha256:24d1fec6aa7707e7520466fbde5ad529399a4ed5e5cbbaf60c8946def82f8e08)
- **amount** = 23.7 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4302&end=4350) · [sha256:9fbe984ad5073d52…](/hashes/sha256:9fbe984ad5073d52e68a8f7165028fe2959707d88b38f05d43d653d99ecb2806)
- **amount** = 15767 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4302&end=4350) · [sha256:f3e9d4037886e29b…](/hashes/sha256:f3e9d4037886e29bb39dfdf8614f528b08b96a94e89ac7d8169b448958d54e3c)
- **amount** = 1064 USD [inferred] · as [building fees · s s occupancy tenant improvements 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4302&end=4350) · [sha256:f8acd63f3ef0391b…](/hashes/sha256:f8acd63f3ef0391bb1eb856745ec8ddc347de1ca688b160179fe5b1c1807760e)
- **occupancy tenant improvements · amount** = 266 USD [inferred] · as [s s occupancy tenant improvements 600 · occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600/occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4049&end=4124) · [sha256:274e2b3ce3584908…](/hashes/sha256:274e2b3ce3584908e55ea79210c837ab86cd0652134b5a9545527aada329a2e6)
- **occupancy tenant improvements · amount** = 4462 USD [inferred] · as [s s occupancy tenant improvements 600 · occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600/occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4049&end=4124) · [sha256:4a60a20676b161c8…](/hashes/sha256:4a60a20676b161c808ebd542c5740b82069970a8b3183558359e1765364feba4)
- **occupancy tenant improvements · amount** = 52.67 USD [inferred] · as [s s occupancy tenant improvements 600 · occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600/occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4049&end=4124) · [sha256:a22aec1d58ce6c72…](/hashes/sha256:a22aec1d58ce6c721d12f62903cb19b6012e4bd645317fb0cd77acb0ad361e9a)
- **occupancy tenant improvements · amount** = 73.06 USD [inferred] · as [s s occupancy tenant improvements 600 · occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600/occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4049&end=4124) · [sha256:b88bc5b9eecbf397…](/hashes/sha256:b88bc5b9eecbf39734dfb8d1cf1e8388da60ae9de899d9a9a289e13207049880)
- **occupancy tenant improvements · amount** = 4424 USD [inferred] · as [s s occupancy tenant improvements 600 · occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-s-occupancy-tenant-improvements-600/occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4049&end=4124) · [sha256:e022cb4e10548189…](/hashes/sha256:e022cb4e105481894f9ada78a76e49912f7897de6f82fed336598ae8e329bddf)

### [s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) (30 records)

- **amount** = 6247 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3820&end=3863) · [sha256:1ea175e7ae69f4f2…](/hashes/sha256:1ea175e7ae69f4f2a917c584127320fcaa8fcb22ef27708180245f288f504346)
- **amount** = 69.42 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3820&end=3863) · [sha256:56acf2f87594dab8…](/hashes/sha256:56acf2f87594dab83ee95d89459e19d2eb9a71aa1b718b53905805167481ddaa)
- **amount** = 63.2 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3820&end=3863) · [sha256:e515aa4b35bb588f…](/hashes/sha256:e515aa4b35bb588f96f1658523c572dac9fef32dfcaef0a1b3317a9c14587858)
- **amount** = 6952 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3820&end=3863) · [sha256:f7dcd138111c3c66…](/hashes/sha256:f7dcd138111c3c6689d34ad73cdcc610e130445f058b561b7efb98dc4d6e4c47)
- **amount** = 532 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3864&end=3906) · [sha256:26c829adb1d632ed…](/hashes/sha256:26c829adb1d632ed031b87e69b878c30403d19431402568db2ef80f972a69187) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:60215ab313360b35aa7924b2629d2db08eb4a788cb57bf6fa1da1af20681e0af)
- **amount** = 4.43 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3864&end=3906) · [sha256:4697263c2d9eae47…](/hashes/sha256:4697263c2d9eae476255eaea990a7b90169adf078936b850e374b7ec6f72353f)
- **amount** = 8849 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3864&end=3906) · [sha256:7b10e690d3c04770…](/hashes/sha256:7b10e690d3c04770c23cbda7f70b40b3be9c7444adb313f222d7189a0fa27e58)
- **amount** = 52.67 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3864&end=3906) · [sha256:9e915d5469a945cc…](/hashes/sha256:9e915d5469a945cc6f27bfee65563e229a99b3bf7de8192238277d11306c27c4)
- **amount** = 12009 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3907&end=3952) · [sha256:1037fc2a939dabd6…](/hashes/sha256:1037fc2a939dabd618dc0f1357b1a333f1f34bbe4e1382bcf3323f095e45dd47)
- **amount** = 8330 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3907&end=3952) · [sha256:35de6a2fd97c3aa8…](/hashes/sha256:35de6a2fd97c3aa88f8e12ccc21176dc686d243800ce4620d81fcf6eea1b40f7) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:f1fd35d634e7a8eede1748753cd345b9376a54455e548962ae0643b0ff99167e)
- **amount** = 19.83 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3907&end=3952) · [sha256:40eb9eb0b760efc7…](/hashes/sha256:40eb9eb0b760efc75da68ea64c2e7279d0b12d08971e99be2cfb7d1cdb1a5184)
- **amount** = 10.53 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3907&end=3952) · [sha256:69c51439fe1a6c6a…](/hashes/sha256:69c51439fe1a6c6a8a508b8e3e8f18b665a9d51f00d92ed6c8ac9e5bf65f9298)
- **amount** = 11900 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3953&end=3999) · [sha256:0bb7f6d18b355435…](/hashes/sha256:0bb7f6d18b355435fe68b6b9f09c0734d9001ae67e4f02c3c213b6462cbcd63a)
- **amount** = 15.76 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3953&end=3999) · [sha256:0e0b2cea0e00ca09…](/hashes/sha256:0e0b2cea0e00ca0991530bde15362f2a4667a57b835d0bc36461f05c89ae4be2)
- **amount** = 798 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3953&end=3999) · [sha256:145e9b8085cf2baa…](/hashes/sha256:145e9b8085cf2baa235570fd167b53c6e8727d13acf7e4a32e368c3170cac2c6) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:4e142fe4dbd1eb2019f1fff1f8fe76a0dcc16b95955e4d72dff818da3da7e817)
- **amount** = 11.59 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3953&end=3999) · [sha256:1d6e9ece6f91071c…](/hashes/sha256:1d6e9ece6f91071c530ebe8be388c0092b88e15e40ae0877ba8d470065fff861)
- **amount** = 13905 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3953&end=3999) · [sha256:e4f3b95cf342573b…](/hashes/sha256:e4f3b95cf342573bd719c1e383d6479207844596e7e6b65af36166811be1f6c4)
- **amount** = 1064 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4000&end=4048) · [sha256:6995635de27fae52…](/hashes/sha256:6995635de27fae52c364e256ae7456a2b57d290e128ac3f31cbf3ec5aed32679)
- **amount** = 16362 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4000&end=4048) · [sha256:887f8ec37e49ffc2…](/hashes/sha256:887f8ec37e49ffc2b13f13dfee09b5265784e8183fdb154a620aa98edb2a9ff1)
- **amount** = 28.97 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4000&end=4048) · [sha256:b4ae9f9b714767b2…](/hashes/sha256:b4ae9f9b714767b2f773f4f0dd582ce1345d41b293fc1d8365c1b2f71611d878)
- **amount** = 17381 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4000&end=4048) · [sha256:b4dd4af1ebe11d66…](/hashes/sha256:b4dd4af1ebe11d6694ebf54fa314856489a00d65e0e8da47dcfc23a5307d7bdb)
- **amount** = 29.04 USD [inferred] · as [building fees · s storage 600](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=4000&end=4048) · [sha256:e4ba60d542b5c4cc…](/hashes/sha256:e4ba60d542b5c4cca3b35ff029a9e18c5dc0b9e099f894f82ed1ebd3fd514148)
- **storage · amount** = 5372 USD [inferred] · as [s storage 600 · storage](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600/storage) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3768&end=3819) · [sha256:262935e0dc6c8ce7…](/hashes/sha256:262935e0dc6c8ce7c40e5f87550658819782b7b26b1f48b1b1e220fe8129d6c4)
- **storage · amount** = 65.84 USD [inferred] · as [s storage 600 · storage](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600/storage) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3768&end=3819) · [sha256:3ed8e8d25384e186…](/hashes/sha256:3ed8e8d25384e186962c2884ff175e807dbb0deeb044d02eef24a41a27c3cef5)
- **storage · amount** = 73.06 USD [inferred] · as [s storage 600 · storage](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600/storage) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3768&end=3819) · [sha256:7d05b4e23ecb30e0…](/hashes/sha256:7d05b4e23ecb30e039e654374c5e885d9ae1495707f8b475918e185c8cf3b019)
- **storage · amount** = 4760 USD [inferred] · as [s storage 600 · storage](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600/storage) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3768&end=3819) · [sha256:8bdbb56f56cb14f2…](/hashes/sha256:8bdbb56f56cb14f24fbc81c1b843a541f100963bc2adab1518d00bebbe455ac5)
- **storage · amount** = 266 USD [inferred] · as [s storage 600 · storage](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/s-storage-600/storage) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3768&end=3819) · [sha256:c2bb655354ca50f0…](/hashes/sha256:c2bb655354ca50f0721fcaa546cfe057a89747d6e6167a920d79ed379a2ce827)

### r r occupancy tenant improvements 80 (15 records)

- **r r occupancy tenant improvements · amount** = 3867 USD · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3468&end=3544) · [sha256:61f3d8c716fe6bef…](/hashes/sha256:61f3d8c716fe6beffb25af73cbff85c5dc2141d47a5ca379469c3f253857b90e)
- **r r occupancy tenant improvements · amount** = 266 USD · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3468&end=3544) · [sha256:66d9eb0db06f2381…](/hashes/sha256:66d9eb0db06f2381908e1c172723b05cee278b80829b5810a4505837ea384484) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:ebe30cec23fbef7a6750ba2411d0c8e7d266af9542add3308bcb39f61f1d2273) and [17 Sep 2026, 01:27 UTC](/hashes/sha256:da3b1a0c5a78120d5284e3cc9d86819411c0e1d689389359435296d0abc0388b)
- **r r occupancy tenant improvements · amount** = 197.51 USD · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3468&end=3544) · [sha256:aeed7355570a9522…](/hashes/sha256:aeed7355570a9522a450a7f5389a0a07fdf5f9c36379f717d599785ff9b0348f) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:be4ea2ee61c2d03ab6f770506793dcc03156b25dcb7da5c38962873b62571adb)
- **r r occupancy tenant improvements · amount** = 2844 USD · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3468&end=3544) · [sha256:e49d0c4e31a8c10d…](/hashes/sha256:e49d0c4e31a8c10d8269407511078943f51d2659cadab0e1413da169b3b503ac)
- **r r occupancy tenant improvements · amount** = 371.87 USD [inferred] · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3545&end=3588) · [sha256:3af50c4478388098…](/hashes/sha256:3af50c44783880980f98db3e2c882e8fb88e7b92fcdfd4a449e25f3abacd17a6) · same value when read [17 Sep 2026, 01:27 UTC](/hashes/sha256:6e7909bcaceaafbfa9c09155d9445eac9a1ba2880a04fec5f04a1e0c99d453f1)
- **r r occupancy tenant improvements · amount** = 3476 USD [inferred] · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3545&end=3588) · [sha256:3ed1672d84c4883f…](/hashes/sha256:3ed1672d84c4883f12ae033ad6171937b2ebee8cbcb2630853be84cb0764b354)
- **r r occupancy tenant improvements · amount** = 5057 USD [inferred] · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3545&end=3588) · [sha256:8f8c6aa613d55fca…](/hashes/sha256:8f8c6aa613d55fcafe326acd1e2f068436a10bc4edf2957c6de1d7118dad7806)
- **r r occupancy tenant improvements · amount** = 237.01 USD [inferred] · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3545&end=3588) · [sha256:e600ed9038ef3bc7…](/hashes/sha256:e600ed9038ef3bc724b0f7529db4d29f12c428775d0c7fb02d14b3785fedcde1)
- **r r occupancy tenant improvements · amount** = 33.23 USD [inferred] · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3589&end=3631) · [sha256:55b359f733d612ea…](/hashes/sha256:55b359f733d612ea92bd8d7cf35558980be6170ba99ceac5aafe7ebcb9e1489c)
- **r r occupancy tenant improvements · amount** = 4424 USD [inferred] · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3589&end=3631) · [sha256:5c7dd9370496a0a0…](/hashes/sha256:5c7dd9370496a0a0f423b590479db9a84fb1b326dbe1f0819921c0cc9a10da34)
- **r r occupancy tenant improvements · amount** = 6545 USD [inferred] · as [r r occupancy tenant improvements 80 · r r occupancy tenant improvements](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-r-occupancy-tenant-improvements-80/r-r-occupancy-tenant-improvements) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=3589&end=3631) · [sha256:8aa8e8ca34b9069e…](/hashes/sha256:8aa8e8ca34b9069eb0883ebd0b9b847a9fba1c0dbff2f96bde95a7e67fa133b7)

### r 2 residential apartment building 800 (10 records)

- **r 2 residential apartment building · amount** = 266 USD · as [r 2 residential apartment building 800 · r 2 residential apartment building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/r-2-residential-apartment-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2228&end=2303) · [sha256:6f5558391616d779…](/hashes/sha256:6f5558391616d77932717e65af5f4c68f6b5c9150153071cbf5eda086f0e3977)
- **r 2 residential apartment building · amount** = 73.39 USD · as [r 2 residential apartment building 800 · r 2 residential apartment building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/r-2-residential-apartment-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2228&end=2303) · [sha256:7f71958df460e06f…](/hashes/sha256:7f71958df460e06f24392a821de361b694cb00c2ba61eeb16a7fff0c8b73a6d7)
- **r 2 residential apartment building · amount** = 316 USD · as [r 2 residential apartment building 800 · r 2 residential apartment building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/r-2-residential-apartment-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2228&end=2303) · [sha256:a9cadd3cb0fd3b7d…](/hashes/sha256:a9cadd3cb0fd3b7d5d444b4020b52b8ac36e4bb917e3c4440ab242a677200de6)
- **r 2 residential apartment building · amount** = 0.0 USD · as [r 2 residential apartment building 800 · r 2 residential apartment building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/r-2-residential-apartment-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2228&end=2303) · [sha256:bfac0954fc7fa42f…](/hashes/sha256:bfac0954fc7fa42f594f61aa0cbf7624c8a708408efc380d39686adc01f67867)
- **r 2 residential apartment building · amount** = 6842 USD · as [r 2 residential apartment building 800 · r 2 residential apartment building](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/r-2-residential-apartment-building) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2228&end=2303) · [sha256:d446967a27b99465…](/hashes/sha256:d446967a27b99465671e28a7ad1895b14dc7bc697d3efbed19312989fefe1621)
- **repeat unit · amount** = 316 USD · as [r 2 residential apartment building 800 · repeat unit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/repeat-unit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2304&end=2356) · [sha256:18911b10e36b1676…](/hashes/sha256:18911b10e36b16763f571aea62c484ebfbebd92f045cfde1a742afee40440164)
- **repeat unit · amount** = 8925 USD · as [r 2 residential apartment building 800 · repeat unit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/repeat-unit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2304&end=2356) · [sha256:4a004a5904e7765f…](/hashes/sha256:4a004a5904e7765f0983a8b8dbc08b39f084fce4d231af0f3da8d4714418c71c)
- **repeat unit · amount** = 66.94 USD · as [r 2 residential apartment building 800 · repeat unit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/repeat-unit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2304&end=2356) · [sha256:651e7fd8b8e20131…](/hashes/sha256:651e7fd8b8e201317ebfb59fe4fa3766b20117c630e3ba07c560d52339ba1c60)
- **repeat unit · amount** = 532 USD · as [r 2 residential apartment building 800 · repeat unit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/repeat-unit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2304&end=2356) · [sha256:8254f7d24a71f346…](/hashes/sha256:8254f7d24a71f346561b69c6e00504dd40a766b3b1d6e6bbd4a65c6beadfea0b)
- **repeat unit · amount** = 0.0 USD · as [r 2 residential apartment building 800 · repeat unit](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/r-2-residential-apartment-building-800/repeat-unit) · [quote](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770?trace&start=2304&end=2356) · [sha256:eedf9899fe5d3a3e…](/hashes/sha256:eedf9899fe5d3a3e372f2db3f8999b59111fb77fe02c597704248da263eb23d8)

## Captures (1)

- 15 Sep 2026, 01:38 UTC · https://www.cupertino.gov/files/assets/city/v/1/departments/documents/community-development/building/forms-amp-handouts-amp-fees/fees/fee-schedule-building-fees.pdf · full text (no licence recorded) · 0 revisits · [text](/hashes/sha256:4f06ea70905c390481f00c65f21e4d502f266ec201ed37cb3db77a87a9435770) (pdfium/7881, 18750 bytes) · capture [sha256:6edeadc5aca598c0…](/hashes/sha256:6edeadc5aca598c0749fe2bb6fc4a7b455d3165aa277aef6f8f4e9bd0f70717e)

[the package (WACZ)](/california-fee-schedules/jurisdictions/cupertino-gov/building-fees/work.wacz)

A capture is what the source served at that moment; a later change at the source is a new capture, never an edit to this one.

---
[standing](/standing) · Drillable™ is a trademark of Drillable LLC.
